References
- 경제협력개발기구(2003), OECD 회원국의 국민계정
- 김계수(1999), '프로세스 품질경영 성과개선을 위한 6시그마 프로그램에 관한 연구', 품질경영학회지, 27권, 4호, pp. 266-279
- 대한 상공회의소(2003), 국내 서비스산업 현황과 시사점
- 마이클 해머 저, 임덕순 옮김(1997), 프로세스혁명, 경향신문사
- 세계무역통감(2003)
- 이건창, 최봉, 권순재(2004), '6시그마 경영활동으로 인한 기업경쟁력 향상에 관한 실증연구', 경영학연구, 33권, 6호, pp. 1735-1756
- 정보통신부(http://www.mic.go.kr)
- 철도청 홈페이지(http://www.korail.go.kr)
- 한국은행(2003)
- 홍성훈 등(1999), '6시그마 성공사례', 품질경영학회지, 27권, 3호, pp. 202-208
- 홍화상(2007), CEO 윤종용, 위즈덤 하우스
- Abramowich, E.(2005), Six Sigma for Growth Driving Profitable Top-Line Results, John Wiley & Sons
- Anderson, J. C. and Gerbing, D. W.(1988), 'Structural Equation Modeling in Practice: A Review and Recommended Two-Step Approach', Psychological Bulletin, Vol. 103, pp. 441-423
- Anderson, J. C., Rungtusanathanm, M., and Schroeder, R. G.(1994), 'A Theory of quality management understanding the Deming Management Method', Academy of Management Review, Vol. 19, No. 3, pp. 472-509 https://doi.org/10.2307/258936
- Antony, J. and Banuelas, R.(2002), 'Key ingredients for the effective implementation of six sigma program', Measuring Business Manufacturing Engineer, Vol. 82, No. 4, pp. 20-27
- Blakeslee, Jr., Jerome, A.(1999), 'Implementing the Six Sigma Solution', Quality Progress, July, pp. 77-85
- Breyfogle, F. W., Cupello, J. M., and Meadows, B.(2001), Managigng Six Sigma: A Practical Guide to Understanding, Assessing, and Implementing the Strategy That Yields Bottom-Line Success. Wiley, NY
- Buttle, F.(2000), The CRM Value Chain, Manchester Business School
- Byrne, G.(2003), 'Ensuring Optimal Success with Six Sigma Implementation', Journal of Organizational Excellence, Spring, pp. 43-50
- Carlzon, J.(1987), Moments of Truth, New York, NY : Ballinger
- Collins, J. C.,and Porras, J. I.(1994), Built to Last, HarperBusiness
- Collins, J.(2001), Good to Great, New York, Harperbusiness
- Dean, J. W. and Bowen, D. E.(1994), 'Management theory and total quality: Improving research and practice through theory development', Academy of Management Review; Vol. 19, pp. 392-418 https://doi.org/10.2307/258933
- Deming, W. E.(1986), Out of the Crisis, Cambridge, Mass. : Massachusetts Institute of Technology for Advance Engineering Study
- Eassa, K.(2000), 'Six Sigma : a champion's perspective', In : Proceedings of the International Society of Six Sigma Professional Leadership Conference, Las Vegas, NV, October 18-20
- Fitzsimmons, J. A. and Fitzsimmons, M. J. (2003), Service Management, McGraw-Hill
- Fitzsimmons, J. A. and Fitzsimmons, M. J. (2006), Service Management, McGraw-Hill
- Fornell, C. and Larcker, D. F.(1981), 'Evaluating structural equation models with unobservable variables and measurement error', Journal of Marketing Research, Vol. 18, No. 1, pp. 39-50 https://doi.org/10.2307/3151312
- George, M. L.(2003), Lean Sigma for Service: How to Use Lean Speed and Six Sigma Quality to Improve Services and Transactions, McGraw-Hill
- Goh, T. N.(2002), 'A Strategic Assessment of Six Sigma', Quality and Reliability Engineering International, Vol. 18, pp. 403-410 https://doi.org/10.1002/qre.491
- GrOnoos, C.(1983), Strategic Management and Marketing in the Service Sector, Boston : Marketing Science Institute, May
- Hahn, G., Hill, W., Hoerl, R., and Zinkgraf, S.(1999), 'The Impact of Six Sigma improvement-a glimpse into the future of statistics', The American Statistician, Vol. 63, No. 3, pp. 208-215
- Hahn. G.(2004), What Does it Take to be a Master Black, SIX SIGMA FORUM MAGAZINE
- Harry, M. J.(1998), 'Six-Sigma: A Breakthrough Strategy for Profitability', Quelity Progress, May, pp. 60-64
- Harry, M. J. and Schroder, R(2000), Six Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations, Doubleday, NY
- Hekett, J. L., Jones, T. O., Loveman, G. W., Sasser, Jr., W. E., and Schlesinger, L. A. (998), The Service Profit Chain, The Free Press
- Henderson, K. M. and Evans, J. R.(2000), 'Successful implementation of six sigma: benchmarking general electric company benchmarking', An International Journal, Vol. 7, No. 4, pp. 260-281 https://doi.org/10.1108/14635770010378909
- Hoerl, R. W.(2001), 'Six Sigma Black Belts: what do they need to know?', Journal of Quality Technology, Vol. 33, No. 4, pp. 391-435 https://doi.org/10.1080/00224065.2001.11980094
- Innis, D. E. and LaLonde, B. J.(1994), 'Customer Service: the key to customer satisfaction, customer loyalty, and market share', Journal of Business Logistics, Vol. 15, No. 1, pp. 1-28
- Johnson, A. and Swisher, B.(2003), 'How six sigma improve R&D', Research Technology Management, Vol. 46, No. 2, pp. 12-15
- Laffel, G. and Blumenthal, D.(1989), 'The case for using industrial quality management science in health care organizations', Journal of the American Medical Association, pp. 2869-2873
- Laudon, K. C. and Laudon, J. P.(2004), Management Information System, Prentice Hall
- Linderman, K., Schroeder, R. G., Zaheer, S., and Choo, A. S.(2003), 'Six Sigma: a goal-theoretic perspective', Journal of Operation Management, pp. 193-203
- Meredith, J. R. and Vineyard, M.(1993), 'A longitudinal study of the role of manufacturing technology in business strategy', International Journal of Operations and Production Management, Vol. 13, No. 12, pp. 4-24
- Narver, J. C. and Slater, S. F.(1995), 'Market orientation and the learning organization', Journal of Marketing, Vol. 59, No. 3, pp. 63-74
- Pande, P. S., Neuman, R. P., and Cavangh, R. R.(2000), The Six Sigma Way: How GE, Motorola, and Other Top Companies Aee Honing Their Performance, McGraw Hill, NY
- Rainer, Jr., R. K., Turban, E., and Potter, R. E.(2007), Introduction to Information System, Wiley
- Reichheld, F. F. and Schefter, P.(2000), 'E-Loyalty', Harvard Business Review, July-August, pp. 105-113
- Schroeder, R. G.(2000), 'Six Sigma quality improvement : What is the six sigma and what are the important implications?', In : Proceeding of the fourth Annual International POMS Conference, Seville, Spain, August 27, September 1
- Smith, D. and Blakeslee, J.(2002), Strategic Six Sigma: Best Practices from the Executive Suite, Wiley
- Snee, R. D. and Hoerl, R. W.(2003), Lean Six Sigma, Upper Saddle River, NJ : Prentice Hall
- http://www.quality.nist.gov