• Title/Summary/Keyword: Site Regulations

Search Result 296, Processing Time 0.026 seconds

A Study on the Safety Improvement of Lifting Purpose Chain Sling (인양용 체인슬링의 안전성 향상 방안 고찰)

  • Jin Woo Lee;Cheol Ho Han;Song Woo Lee;Young Hun Jeon;Chang Hee Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.4
    • /
    • pp.60-67
    • /
    • 2023
  • Various lifting slings are used in domestic industrial sites depending on the purpose, form, and environment. Each sling has its characteristics, and safe lifting work is possible when its performance meets the regulations. Therefore, this study analyzed domestic and foreign regulations and guidelines related to chain slings. It identified significant problems by analyzing the chain-sling-related disaster cases. The current status of chain slings used by various industries and the ways to improve chain sling safety were studied. The major chain sling issues were: 1) employing improper components to chains, 2) having different safety coefficients between the regulation and industrial standards, and 3) using chains unsuitable for lifting purposes. Based on these issues, the following measures were proposed to improve chain sling work safety: 1) revise the safety coefficient requirements under the Regulations on Occupational Safety and Health Standards, 2) disseminate specialized sling courses, and 3) strengthen on-site chain slings-related training. In the future, this study is expected to minimize chain use mistakes by unifying the safety coefficient related to chain slings and recognizing the importance of correctly selecting components employed in the chain.

A Case Study on Construction of a Large-Scale Tunnel Blasting Using Electronic Detonator (전자뇌관을 이용한 대단면 터널 시공 사례)

  • Hwang, Nam-Sun;Lee, Dong-Hee;Jung, Min-Sung;Kim, Nam-Soo
    • Explosives and Blasting
    • /
    • v.36 no.2
    • /
    • pp.19-26
    • /
    • 2018
  • The measures for environmental regulations have become more strict over the recent years. Due to vibration and noise arising from blasting, every site that chooses to handle explosives has to be under certain restrictions in its use. Especially a site where a safety thing is situated within close proximity, the chosen method is through mechanical excavation. However, various applications of electronic detonators has made blasting possible where mechanical excavation used to be the only alternative. Hanwha Corporation has developed an electronic detonator, $HiTRONIC^{TM}$, which is an advanced fourth-generation detonator with a high accuracy of delay time(0.01%). At this moment, $HiTRONIC^{TM}$ is widely used in highway and railway construction sites, large limestone quarries, and many other blasting sites where blasting had not been an available option before. In this paper, I would like to introduce a case study on construction of utilizing $HiTRONIC^{TM}$ at a large-scale tunnel site.

A Study on the Post-management and Improvement of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업 사후관리 실태와 개선 방안)

  • Lee, Ji Hyun;Sung, Hyun Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.

Analysis of the Necessity of Introducing the Obligation to Take Safety and Health Measures for Construction Orderers using Multivariate Analysis (다변량 분석을 이용한 건설업 발주자의 안전보건조치 의무 도입 필요성 분석)

  • Lim, Se Jong;Seo, Jae Min;Won, Jeong-Hun;Kim, Chang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.1
    • /
    • pp.20-29
    • /
    • 2022
  • To stem the ever-prevalent occurrence of industrial accidents in the construction industry, which is emerging as a social problem, efforts must be invested by various stakeholders. Specifically, among stakeholders, the orderer is at the top of a project's decision-making structure. Therefore, the orderer's awareness of safety and health directly affects the process of securing the safety of the overall construction site. In this light, the present study aims to identify differences in the perceptions of each stakeholder regarding the obligatory safety and health measures for clients that have recently been introduced. In addition, it suggests specific implementation plans in the Korean context. The data used for analysis were collected through a survey targeting stakeholders such as orderers, safety managers, and site managers, and the collected data were quantitatively reviewed by using multivariate analysis methods such as analysis of variance. As a result of the analysis, the introduction of safety and health obligations for the owner was found to be necessary, and the designation and operation of safety and health experts as an action plan was deemed reasonable. The authors expect that the results of this study can be used as basic data for revising the related regulations in Korea. Moreover, as a further study, a review of the effectiveness after improving regulations would contribute strongly to the domain.

Evaluation of Radiation Dose according to Aneurysm Size and Location during Cerebral Aneurysm Coil Embolization (뇌동맥류 코일 색전술 시술 시 동맥류 크기 및 위치에 따른 방사선량 평가)

  • An, Hyun
    • Journal of radiological science and technology
    • /
    • v.45 no.5
    • /
    • pp.407-412
    • /
    • 2022
  • Cerebral aneurysm coil embolization has the advantages of accurate, low patient burden, and fast recovery time, but efforts are needed to reduce dose due to the burden of exposure radiation dose during interventional procedures. In this study, the area dose product(DAP/Gy·cm2) and fluoro time(min) according to the size of the aneurysm and the location of aneurysm were investigated according to insurance recognition regulations aneurysm classification cerebral aneurysm coil embolization. According to the research method, classification according to the size and location of the aneurysm is first, the size of the aneurysm is divided into less than 4mm, more than 4mm to less than 8mm, and more than 8mm, and second, the dose to the area based on the location site (DAP/Gy·cm2) and fluoro time(min) based on the location site were observed. As a result, the location of the cerebral aneurysm procedure was found to be the Paraclinoid site. During cerebral aneurysm coil embolization, the area dose was 107 Gy·cm2 and fluoro time was 47.41 minutes, showing lower results than domestic studies, and when comparing the area dose product with foreign studies, the area dose product results were similar to that of Turkey and Saudi Arabia. It is expected that it can be used as an objective analysis indicator to establish diagnostic reference levels (DRLs) and patient radiation defense guidelines according to the size of cerebral aneurysm and location of cerebral aneurysm procedures during interventional procedures.

Changes in Labor Regulations During Economic Crises: Does Deregulation Favor Health and Safety?

  • Jhang, Won-Gi
    • Journal of Preventive Medicine and Public Health
    • /
    • v.44 no.1
    • /
    • pp.14-21
    • /
    • 2011
  • Objectives: The regulatory changes in Korea during the national economic crisis 10 years ago and in the current global recession were analyzed to understand the characteristics of deregulation in labor policies. Methods: Data for this study were derived from the Korean government's official database for administrative regulations and a government document reporting deregulation. Results: A great deal of business-friendly deregulation took place during both economic crises. Occupational health and safety were the main targets of deregulation in both periods, and the regulation of employment promotion and vocational training was preserved relatively intact. The sector having to do with working conditions and the on-site welfare of workers was also deregulated greatly during the former economic crisis, but not in the current global recession. Conclusions: Among the three main areas of labor policy, occupational health and safety was most vulnerable to the deregulation in economic crisis of Korea. A probable reason for this is that the impact of deregulation on the health and safety of workers would not be immediately disclosed after the policy change.

Variation of Position Accuracy due to Observation Time and Baseline Distance in GPS Survey (GPS 측량에서의 관측시간과 기선거리에 따른 좌표정확도 비교)

  • Kim, Du-Sik;Park, Kwan-Dong;Lee, Sa-Hyung;Lee, Ho-Seok
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.187-190
    • /
    • 2010
  • GPS survey came into wide use, but there are inefficient parts in related laws and regulations. Especially, to get GPS surveying results under 1.5cm permissible error the observation time must be longer than 8 hours in triangulation points surveying regulations. However, GPS surveying technology is developing now, so results could be acceptable under 4 hours observation time. Therefore, this study made a stable standard of observation time in GPS survey by comparing the errors due to observation time, and used PAJU, DOND and YANP's GPS data and 6 cadastral points' survey data. Also, to analyze the variations of results due to baseline distance, applied each GPS site as a fixed point and compared the positions. As a result, the stable satisfactory results were calculated under 4 hour survey, when the baseline distances were under 30km.

  • PDF

Methodology Developments based on CO2 Emission Information from Construction Equipment for Greenhouse Gas Regulations (온실가스 규제에 대비한 건설장비 이산화탄소 배출량정보 활용방법론 개발)

  • Go, Jee-Eun;Lee, Jin-Woo;Chae, Yoon-Byung;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.35-36
    • /
    • 2018
  • According to the nation's greenhouse gas emission statistics, greenhouse gas emissions have been stiffly increasing. Accordingly, the importance of CO2 reduction is more getting focused over the world. This trend makes the construction equipment be considered as a major target of reduction due to the large volume of emission. This study suggests the feasible methodology for estimating CO2 emission from construction equipment and for being easily applied on the job sites. The methodology is based on the collection from the segmented CO2 emission information of construction equipment. This study allows site personnels to estimate the total amount of CO2 and to take appropriate actions for reasching the environmental regulations.

  • PDF

A Study on the Effectiveness of the Risk Assessment Regulations for Construction Works (건설공사 유해위험방지계획서제도의 효과분석에 관한 연구)

  • 안홍섭;노민래;이명구
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.134-139
    • /
    • 2001
  • The Risk assessment regulation(RAR) is one of the essential articles of the Occupational safety and health law for the construction industry along with safety and health management expense and safety organization regulation. However, arguments regarding the working time of the safety assessment documents, the person in charge of documentation, weakness in legislative enforcement etc. are ongoing. Thus this study aims to analyze the effectiveness of RAR for the guidance of enhancing the effectiveness of RAR. The findings are; 1) the effectiveness of RAR is recognized, however the indirect effectiveness ie, enforcement of safety activities, previewing of drawings etc. are bigger than the direct effectiveness of accident prevention, 2) to enhance the effectiveness of RAR site inspection procedure has to be utilized, 3) further research for identifying and getting rid of negative factors in RAR is recommended.

  • PDF

A Research on the Safety Condition of Power Utilities Installed on Underground Premises (지하구내 수.변전설비 안전실태 조사)

  • Jung, Jong-Wook;Jung, Jin-Soo;Yi, Geon-Ho;Kim, Young-Seok;Bae, Seok-Myung
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.410-413
    • /
    • 2006
  • This paper describes the safety condition of power utilities installed on underground premises when flooding occurs. As advance preparations, the statistical data were investigated based on the rainfall trend; the flooding damage; the power utilities installation; the electric shock accidents, and domestic md foreign regulations pertaining to the power utilities installation on underground premises were also compared and analyzed. After the preliminaries, the safety condition of underground power utilities was inspected at site and the results were reflected on considering countermeasures. Based on the further studies, the regulations closely related to the underground power utilities installation can be modified.

  • PDF