• Title/Summary/Keyword: Settlement estimation method

Search Result 126, Processing Time 0.02 seconds

Foundation Analysis and Design Using CPT Results : Settlement Estimation of Shallow Foundation (CPT 결과를 이용한 기초해석 및 설계 : 얕은 기초의 침하량 산정)

  • 이준환;박동규
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.8
    • /
    • pp.5-14
    • /
    • 2004
  • The settlement of foundations under working load conditions is an important design consideration. Well-designed foundations induce stress-strain states in the soil that are neither in the linear elastic range nor in the range usually associated with perfect plasticity. Thus, in order to accurately predict working settlements, analyses that are more realistic than simple elastic analyses are required. The settlements of footings in sand are often estimated based on the results of in-situ tests, particularly the standard penetration test (SPT) and the cone penetration test (CPT). In this paper, we analyze the load-settlement response of vertically loaded footings placed in sands using both the finite element method with a non-linear stress-strain model and the conventional elastic approach. Based on these analyses, we propose a procedure for the estimation of footing settlement in sands based on CPT results.

Case study of volume loss estimation during slurry tbm tunnelling in weathered zone of granite rock (화강풍화대를 통과하는 슬러리 TBM의 체적손실 산정에 대한 사례 연구)

  • Park, Hyunku;Oh, Ju-Young;Chang, Seokbue;Lee, Seungbok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.61-74
    • /
    • 2016
  • This paper presents a case study on the ground settlement and volume loss estimation for slurry pressure balanced shield TBM tunnelling in weathered zone of granite rock. Settlement at each stage of shield tunnelling was analyzed and the volume losses and settlement trough factors were estimated from observations. In addition, using the existing volume loss evaluation method in literature, volume losses were estimated considering ground properties and actual driving parameters. Most of ground settlement occurred during passage of shield skin passage and after backfill grouting, and the measured total volume loss and trough curves appeared to coincide with literature. Shield and tail loss obtained from field measurement were found to be around 90% and 60% of the predictions, where tail loss indicated larger deviation than shield loss.

A Trend of Back Ground Surface Settlement of Braced Wall Depending on the Joint Dips in Rocks under the Soil Strata (복합지반 굴착 시 암반층 절리경사 각도별 흙막이 벽체 배후 지표침하의 경향)

  • Bae, Sang-Su;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.83-96
    • /
    • 2016
  • The surface settlement of the back ground of a braced wall due to the ground excavation has the great influence on the safety of the surrounding area. But it is not easy to predict the settlement of the surrounding area due to proud excavation. Estimation of the settlement of the surface ground induced by the deformation of the braced wall is performed by FEM and empirical method (Peck, Clough etc). In this research, surface settlement of the back ground braced wall depending on the joint dips in rocks during excavating the composit ground was measured at the large scale model test (standard: $0.3m{\times}0.3m{\times}0.5m$). The scale of model test was 1/14.5 and the ground was excavated in ten steps. Earth pressure on the braced wall and ground surface settlement on the back ground of a braced wall were investigated. The surface settlement during the excavation depended on the joint dips in rocks on of the ratio of rock layer. Maximum earth pressure and maximum surface settlement were masured at the same excavation step. In accordance with the increase of the rock layer dips and rock layer ratio, the ground surface settlement increased. The maximum ground surface settlement was 17 times larger at 60 degree joint dips in rocks than that of the horizontal ground conditions. And the position of the maximum surface settlement by empirical method was calculated at the point, which was 17%~33% of excavation depth. In accordance with the increase of the rock layer dips and rock layer ratio, the ground maximum surface settlement increased. The ground surface settlement of composite ground is smaller than that of the empirical.

A Practical App개ach of Stress Path Method for Rational Settlement Estimation of Saturated Clay Deposit : Part I (Evaluation and Use of Characteristic Deformation Behaviors) (포화 점성토지반 침하량의 합리적 평가를 위한 실용적인 응력경로법 적용방법 : Part I (특성변형거동의 평가와 활용))

  • Kim Chang-Youb;Chung Choong-Ki
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.4
    • /
    • pp.83-98
    • /
    • 2005
  • In this paper, a conceptual approach of the stress path method was newly proposed for a rational estimation of settlements of saturated clay deposits. In the proposed approach, settlement-related characteristic deformation behaviors of a specific clay deposit, which can cover all probable stress changes expected in the field, are experimentally evaluated in advance. Then settlements of various structures constructed on the deposit are easily estimated with only the characteristic deformation behaviors and without any additional experimental effort. In Part I of this paper, in order to provide practicality to the new conceptual approach, we developed a detailed procedure which is capable of evaluating characteristic deformation behaviors of a saturated clay deposit with only a limited number of tests and easily predicting deformations under a given stress change using the characteristic deformation behaviors. The applicability of the developed procedure was clearly shown by presenting an actual application example.

A Study on the Analysis of Monitoring Settlement Considering the History of the Groundwater Level in the Dredged Landfill Area Affected by Algae (조류의 영향을 받는 준설매립지역에서 지하수위 이력을 고려한 계측침하 분석에 관한 연구)

  • Jang, Ji-Gun;Son, Su-Won;Hong, Seok-Woo
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.7
    • /
    • pp.13-23
    • /
    • 2021
  • If roads, bridges, buildings, etc. are built on the ground with soft clay or organic soil, there may be a lot of problems in geotechnical engineering such as settlement and stability due to the large settlement and lack of bearing capacity. In extreme cases, it may appear due to shear failure or collapse of the constructed structure, so a ground improvement method is indispensable to increase the strength of the ground and to suppress settlement. In this study, the settlement according to each groundwater level condition was analyzed using the measurement results for the groundwater level conditions, one of the important factors in predicting the settlement in dredged and reclaimed ground, and the groundwater level conditions applied to the settlement analysis were proposed by comparing it with settlement generated 5 years after construction. As a result of the analysis, it is judged that it is reasonable to apply the measured groundwater level during construction and the low water ordinary neap tide (L.W.O.N.T) during load application for the groundwater level in the settlement analysis. In addition, in the case of the dredged and reclaimed ground, it is estimated that the water pressure acting on the clay layer is nonlinear, as the result of the observations of the head of water at the observation points above and below the in-situ clay layer were different.

A Study on the Prediction of Surface Settlement Applying Umbrella Arch Method to Tunnelling (Umbrella arch 공법의 적용에 따른 횡방향 지표침하량 예측에 관한 연구)

  • 김선홍;문현구
    • Tunnel and Underground Space
    • /
    • v.12 no.4
    • /
    • pp.259-267
    • /
    • 2002
  • Recently, Umbrella Arch Method(UAM) is commonly used in order to enhance the stability of tunnel itself and stabilize the adjacent surface structure. But quantitative estimation of reinforcement effect is needed because UAM is designed and constructed only on the basis of empirical experience. By using 3-dimensional finite element method, parametric study is performed for elastic modulus of ground and overburden, and reinforcement effect is analyzed quantitatively. From the results, surface settlement decreases about 9%∼27% in soil tunnel, about 4%∼24% in weathered rock tunnel and 4%∼17% in soft rock tunnel when applied with UAM. The prediction equation for final surface settlement is suggested through regression analysis and the equation is expressed as exponential function which has variable Smax, unknown coefficient i and k.

Geotechnical Engineering Characteristics and Consolidation Settlement Estimation of Waste Lime Landfill (폐석회 매립지반의 지반공학적 특성 및 압밀침하량산정)

  • Shin, Eun-Chul;Lee, Ae-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.1-8
    • /
    • 2016
  • The purpose of this study is to examine the consolidation characteristics of waste landfill from sodium carbonate production. The waste lime is a byproduct from the production of soda ash. The consolidation settlement of waste lime landfill was determined for waste lime specimen which obtained from the field boring. The consolidation tests are conducted for determination of the primary and secondary consolidation settlements. The waste lime is classified as an organic soil with high plasticity. As a result of an organic content test, the contents of organic matter in waste lime is much higher than that of normal clay. Finally, the total consolidation settlement of waste lime landfill is calculated by using a theoretical method and computer program for the given initial void ratio, compression index, and embankment height.

A Study on the Applicability of Settlement Evaluation for Sandy Layer by Elastic Theory (사질지반에서 탄성론에 의한 침하량 산정 적용성에 관한 연구)

  • Kim, Won-Cheul;Ahn, Chang-Yoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.3
    • /
    • pp.61-70
    • /
    • 2004
  • N-value by the SPT is one of the key parameter for settlement evaluation. However, if the ground is firm, the usual N-value is not blow count of 30cm depth penetration. In such case, if N-value is more than 50 with 30cm penetration, the N-value 50 is applied for settlement analysis. Therefore, in this study, the modified method of N-value estimation is suggested and compared the settlement by Elastic Theory, and the measured field data by Plate Load Test. As the result of this study, it is shown that the settlement by Elastic Theory with the modified N-value is more accurate than settlement by usual N-value. The application of Elastic Theory for pure sand is also evaluated in this paper.

  • PDF

An Experimental Study for Estimation of Compression Settlement on Embankment Material Under Self-weight (성토체 압축침하량 산정에 관한 연구)

  • Kwon, Jeongeun;Noh, Ilkwon;Jung, Juyoung;Im, Jongchul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.4
    • /
    • pp.33-40
    • /
    • 2009
  • In earthwork projects, the designer considers cut and fill balance for minimizing earthwork which may significantly decrease construction costs. Despite carrying out considerable earthwork design, the decrease in volume of earth occurs in construction sites because of embankment settlement under self-weight, consolidation settlement of soft ground, cavity filling and soil loss due to rainfall-runoff. To reflect the decrease in volume of earth, the specifications for road construction just give shrinkage factors in embankment for soils without consideration of embankment settlement under self-weight. In this study, the computational method is used to estimate the amount of embankment settlement under self-weight developed by Iseda (1972) and Ishii (1976). This research shows that the total compression settlements are between 3 to 10 percent of embankment height according to the property of embankment material and embankment height. As a result, the designer should consider the compression settlement on embankment material under selt-weight.

  • PDF

Estimation of compressibility for Busan clay by CPT (CPT를 이용한 부산점토의 압축특성에 관한 연구)

  • Hong, Sung-Jin;Lee, Moon-Joo;Shim, Seong-Hyeon;Lee, Woo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.320-325
    • /
    • 2009
  • The constrained modulus, representative property to evaluate compressibility of soil, is needed to estimate the settlement of ground structure. A series of lab and field cone penetration tests for clayey soil of Busan new-port and Noksan industrial area were conducted to evaluate the estimation method of constrained modulus. Since CPT generates large deformation of ground, it is difficult to correlate the cone resistance with the constrained modulus. Therefore, appropriate correlation between them is essential to estimate the constrained modulus based on CPT results. The test results show that the ratio of the constrained modulus to the cone resistance is inversely proportional with plasticity index. Based on this result, the estimation method of constrained modulus for Busan clay is suggested.

  • PDF