• Title/Summary/Keyword: Sequential 스위치

Search Result 8, Processing Time 0.02 seconds

Latch-Up Prevention Method having Power-Up Sequential Switches for LCD Driver ICs (LCD 구동 IC를 위한 Power-Up 순차 스위치를 가진 Latch-Up 방지 기술)

  • Choi, Byung-Ho;Kong, Bai-Sun;Jun, Young-Hyun
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.45 no.6
    • /
    • pp.111-118
    • /
    • 2008
  • In this paper, novel latch-up prevention method that employs power-up sequential switches has been proposed to relieve latch-up problem in liquid crystal display (LCD) driver ICs. These sequential switches are inserted in the 2'nd and 3'rd boosting stages, and are used to short the emitter-base terminals of parasitic p-n-p-n circuit before relevant boosting stages are activated during power-up sequence. To verily the performance of the proposed method, test chips were designed and fabricated in a 0.13-um CMOS process technology. The measurement results indicated that, while the conventional LCD driver If entered latch-up mode at $50^{\circ}C$ accompanying a significant amount of excess current, the driver IC adopting the proposed method showed no latch-up phenomenon up to $100^{\circ}C$ and maintained normal current level of 0.9mA.

Characteristics of a Parallel Interworking Model for Open Interface of Optical Internet (광 인터넷의 개방형 인터페이스를 위한 병렬형 연동 모델의 특성)

  • Kim, Choon-Hee;Baek, Hyun-Gyu;Cha, Young-Wook;Choi, Jun-Kyun
    • Journal of KIISE:Information Networking
    • /
    • v.29 no.4
    • /
    • pp.405-411
    • /
    • 2002
  • Open interfaces in the optica] Internet have been progressed by OIF's ISI, ITU-T ASTN's CCI and IETF's GSMP extensions with optical switching. These open interfaces enable the separation between the control plane and the optical transport plane. This separation allows flexibility in the network, but it suffers more setup delay than the traditional switch-by-switch connection setup. We propose the parallel interworking model, which will reduce the connection setup delay in the open interface of optical Internet. Based on the switch controller's caching capability about networks states, the parallel interworking procedures between signaling protocol and GSMP protocol are performed in the switch controller. We simulated and evaluated our proposed parallel interworking model and the existing sequential interworking model in terms of a connection setup delay and a completion ratio. We observed that the completion ratios of the two interworking models were quite close. However the connection setup delay of parallel interworking model is improved by about 30% compared with that of the sequential interworking model.

Behavioral motivation-based Action Selection Mechanism with Bayesian Affordance Models (베이지안 행동유발성 모델을 이용한 행동동기 기반 행동 선택 메커니즘)

  • Lee, Sang-Hyoung;Suh, Il-Hong
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.46 no.4
    • /
    • pp.7-16
    • /
    • 2009
  • A robot must be able to generate various skills to achieve given tasks intelligently and reasonably. The robot must first learn affordances to generate the skills. An affordance is defined as qualities of objects or environments that induce actions. Affordances can be usefully used to generate skills. Most tasks require sequential and goal-oriented behaviors. However, it is usually difficult to accomplish such tasks with affordances alone. To accomplish such tasks, a skill is constructed with an affordance and a soft behavioral motivation switch for reflecting goal-oriented elements. A skill calculates a behavioral motivation as a combination of both presently perceived information and goal-oriented elements. Here, a behavioral motivation is the internal condition that activates a goal-oriented behavior. In addition, a robot must be able to execute sequential behaviors. We construct skill networks by using generated skills that make action selection feasible to accomplish a task. A robot can select sequential and a goal-oriented behaviors using the skill network. For this, we will first propose a method for modeling and learning Bayesian networks that are used to generate affordances. To select sequential and goal-oriented behaviors, we construct skills using affordances and soft behavioral motivation switches. We also propose a method to generate the skill networks using the skills to execute given tasks. Finally, we will propose action-selection-mechanism to select sequential and goal-oriented behaviors using the skill network. To demonstrate the validity of our proposed methods, "Searching-for-a-target-object", "Approaching-a-target-object", "Sniffing-a-target-object", and "Kicking-a-target-object" affordances have been learned with GENIBO (pet robot) based on the human teaching method. Some experiments have also been performed with GENIBO using the skills and the skill networks.

Study on the Characteristics on the Heater-Triggered Switch for the Charging of a Superconducting Magnet (초전도자석 충전을 위한 BSCCO 히터트리거 스위치의 특성 연구)

  • 김영식;배덕권;안민철;윤용수;고태국
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2003.02a
    • /
    • pp.196-199
    • /
    • 2003
  • Characteristics of a heater-triggered switch has been analyzed through the simulations and experiments. It was for the charging of Bi-2223 double pancake load with 1.7 mH and two heaters were used. The timing of the sequential control and the heating current with two heaters are important factors to generate pumping-current. The thermal analysis of the switch considering the heater input and time was carried out. Based on the analysis just mentioned. heater-triggered switch was fabricated. Characteristic analysis was carried out through two modes having different sequential timing controls. Maximum pumping-current reached 18 A and the pumping rate was 113 mA/s at that time.

  • PDF

Analysis of Series Resonant High Frequency Inverter using Sequential Gate Control Strategy (순차식 게이트 구동방식에 의한 직렬 공진형 고주파 인버터 특성 해석)

  • 배영호;서기영;권순걸;이현우
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.7 no.3
    • /
    • pp.57-66
    • /
    • 1993
  • This research proposes a high frequency series resonant inverter consisting of equivalent half - bridge model in combination with two L-C linked full-bridge inverter circuits using MOSFET. As a output power control strategy, the sequential gate control method is applied. Also, analysis of operating MODE and state equation is described. From the computer simulation results, the inverters and devices can be shared properly voltage and current rating of the system in accordance with series and parallel operations. And it is confirmed that the proposed system has very stable performance.

  • PDF

Study of a Superconducting Switch and Superconducting Power Supply for the Charging of Superconducting Magnets (고온초전도자석 충전용 초전도 스위치 및 전원장치에 관한 연구)

  • 배덕권;안민철;김영식;김호민;이찬주;윤용수;이상진;고태국
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2002.02a
    • /
    • pp.318-321
    • /
    • 2002
  • Superconductivity has various applications in the whole industry such as the generation of high magnetic field for medical care and diagnosis, the lossless power transmission, environment-friendly vehicles and clean energy storage systems. This paper deals with the High-Tc superconducting(HTS) power supply using heater-triggered switch for the charging of the superconducting magnets. HTS superconducting power supply consists of two heaters, an electromagnet, and Bi-2223 solenoid and Bi-2223 pancake is used as a superconducting load, similar to real HTS magnet. The timing sequential control of two heaters and an electromagnet is an important factor to generate pumping- current in the Bi-2223 load. The thermal analysis of switching parts of the Bi-2223 solenoid according to the heater input was carried out. Based upon the analysis, the 0.8A of heater current were optimally derived. The maximum pumping current reached 1.7A.

  • PDF

Characteristics Analysis of a Small Scale Persistent Current Switch System by using Coated Conductor (Coated Conductor를 이용한 소용량 영구전류스위치 시스템의 특성 해석)

  • Kim, Yeong-Sik;Yoon, Yong-Soo;Yang, Seong-Eun;Park, Dong-Keun;Ahn, Min-Cheol;Ko, Tae-Kuk
    • Progress in Superconductivity and Cryogenics
    • /
    • v.9 no.1
    • /
    • pp.47-52
    • /
    • 2007
  • This paper presents characteristics analysis of persistent current switch(PCS) system on a small scale by using YBCO coated conductor(CC). A high temperature superconductor(HTS) PCS system mainly consists of a PCS, a HTS magnet load and a magnet power supply(MPS). To design the optimal heater triggering switch. the three-dimensional heat conduction model was analyzed by finite element method(FEM). The electrical equivalent model considering the n-value of CC was applied to analyze current decay during persistent current mode. In the experiment and simulation, the heater was applied with a current of 0.43A and the current was ramped up to 10A and 20A with 0.2A/s. Finally, experimental results of the HTS PCS system have been compared with the theoretical results. It has been concluded that flux creep can not influence the results because the operating current was 40% of critical current and optimal sequential operation of the PCS system is indispensable to enhance its performance.

Design and Operational Characteristics of 150MW Pulse Power System for High Current Pulse Forming Network (대전류 펄스 성형이 가능한 150MW급 펄스파워 시스템의 설계 및 동작특성)

  • Hwang, Sun-Mook;Kwon, Hae-Ok;Kim, Jong-Seo;Kim, Kwang-Sik
    • Journal of IKEEE
    • /
    • v.16 no.3
    • /
    • pp.217-223
    • /
    • 2012
  • This paper presents design and operational characteristics of 150 MW pulse power system for high current pulse forming network to control trigger time. The system is composed of two capacitor bank modules. Each capacitor bank module consist of a trigger vacuum switch, 9k 33kJ capacitor, an energy dump circuit, a crowbar circuit and a pulse shaping inductor and is connected in parallel. It is controlled by trigger controller to select operational module and determine triggering time. Pspice simulation was conducted about determining parameters of components such as crowbar circuit, capacitor, pulse forming inductor, trigger vacuum switch and predicting results of experiment circuit. The result of the experiment was in good agreement with the result of the simulation. The various current shapes with 300~650 us pulse width is formed by sequential firing time control of capacitor bank module. The maximum current is about 40 kA during simultaneous triggering of two capacitor bank modules. The developed 150 MW pulse power system can be applied to high current pulse power system such as rock fragmentation power sources, Rail gun, Coil gun, nano-powers, high power microwave.