• Title/Summary/Keyword: Seashore reclamation

Search Result 12, Processing Time 0.02 seconds

A Study on Computing Pit Excavation Volume by Terrain Surface Approximation (지형곡면해석에 의한 토공량 계산에 관한 연구)

  • 문두열;정범석
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.6
    • /
    • pp.37-43
    • /
    • 2002
  • The calculation of earthwork plays a major role in the plan or design phase of many civil engineering projects, such as seashore reclamation; and thus, it has become very important to improve upon its accuracy. There have been common drawbacks to earlier methods of ground profiling, such as dialing with sharp corners or the grid points of any tow straight lines. In this paper, we prepose an algorithm for finding a terrain surface using the natural boundary conditions and the both direction spline method, which interpolates the given three-dimensional data by using spline. As a result of this study, the algorithm of the proposed two methods to estimate pit excavation volume should provide a better accuracy than Spot height, Chambers, Chen, or Lin method. Also, the mathematical model mentioned offers maximum accuracy in estimating the volume of a pit excavation.

Preliminary Study for the Waterfront in Jeju Topdong (제주시 탑동 수변공간 조성을 위한 기초연구)

  • Kim, Hyoung-Jun;Park, Chung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.11 no.4
    • /
    • pp.67-74
    • /
    • 2009
  • Jeju Topdong is a seashore but there are no relations to the waterfront. Since Topdong was developed and reclaimed by the capitalistic system so that topdong have a lot of problems as a waterfront. First of all, Topdong has no water-familiar as a waterfront that is because of high level concrete breakwater. And also Topdong has no identity in seashore buildings which are composed by fish restaurants, seashore theater, shops, hotels and otherwise buildings. From the above critical mind, in this study look to process of reclamation of Topdong and examine the current situations and problems. To recover water-familiar of Topdong, this study examine the case study on abroad waterfront cases and refer to these abroad cases for establishing desirable waterfront model of Topdong. From the analysis, this study propose the waterfront elements and schematic alternative plan for Jeju Topdong in order to recover the water-familiar as a waterfront and a seashore.

  • PDF

Comprehensive Tideland Reclamation in Korea and Transferbility of Its Development Strategies and Techniques to Developing Countries

  • 최수명
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.34 no.E
    • /
    • pp.20-29
    • /
    • 1992
  • In 1980 the Ministrv of Agriculture, Forestry and Fisheies(MAFF) established the Long-term Tideland Development Scheme in the South-west Seashore Region. Since that time Korea has been developing comprehensive and innovative development frmaeworks in reclamation works and levelling up the potentialities of the donating country of internatioal cooperation in that field. And also, Korea has the well-organized governmental institutions for international cooperation in the development of tideland reclamation technologies such as RDC(Rural Development Corporation) for the field of agricultural engineering and RDA(Rural Development Administration) for the field of agricultural development. In Conclusion, it is ascertained that Korea has a good potentiality of aiding developing countries in the development of tideland reclamation, especially in agricultural development.

  • PDF

A Study on the Spatial Change of Busan Nambin Coast from 1895 to 1936 (1895~1936년 부산 '남빈해안(南濱海岸)'의 공간변화 연구)

  • Song, Hye-Young
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.6
    • /
    • pp.59-68
    • /
    • 2019
  • The purpose of this study was to analyze the spatial change of coastal area called Nampo-dong in Busan. And then the subject of research was chiefly concentrated upon the development of southern coast and the land-reclamation based on the commercial facilities after the opening port. There were various reclamation projects in the coastal area of Japanese settlement under the Rule of Japan. Busan Nambin Coast(Currently, Nampo-dong) was one of typical reclamation projects conducted in the southern seashore. Due to the characteristic of coastal area, fishery was developed well and the entertainment industry also grew rapidly with the characteristic of the short distance of urban centre. In this study, we investigated the process of reflecting the characteristic of spatial change that were pursued by communities at that time, particularly through the establishment and change of buildings.

A Study on the Shallow Improvement Method for Dredged Clay Fills by the Model Tests (모형시험에 의한 준설점토지반의 표층안정기법 연구)

  • 김석열;노종구;이영철;권수영;김승욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.569-576
    • /
    • 2002
  • Recently, the hydraulic fill method is commonly used in many reclamation projects due to lack of fill materials. The method of hydraulic fill in reclamation is executed by transporting the mixture of water-soil particles into a reclaimed land through dredging pipes, then the dredged soil particles settle down in the water or flow over an out flow weir with the water. In the present study, to compare the soil and sand-mat mixed method with sand-air jet method for shallow improvement of hydraulic fills at southern seashore, the model tests were performed. Through the model test results, the behavior of surface as disturbance of desiccation crust is analyzed.

  • PDF

On the Reclamation Earthwork Calculation using the Hermite and Spline Function (Hermite와 Spline 함수를 이용한 매립토공량 계산)

  • Mun, Du-Yeoul;Lee, Yong-Hee;Lee, Mun-Jae
    • Journal of Navigation and Port Research
    • /
    • v.26 no.4
    • /
    • pp.473-479
    • /
    • 2002
  • The estimation of the volume of a pit excavation is often required in many surveying, soil mechanics, highway applications and transportation engineering situations. The calculation of earthwork plays a major role in plan or design of many civil engineering projects such as seashore reclamation, and thus it has become very important to improve the accuracy of earthwork calculation. In this paper the spot height method, proposed formulas(A, B, C), and chen and Line method are compared with the volumes of the pits in these examples. And we proposed an algorithm of finding a terrain surface with the free boundary conditions and both direction spline method drawback, i.e., the modeling curves form peak points at the joints. To avoid this drawback, the cubic spline polynomial was chosen as the methematical model of the new method. From the characteristics of the cubic spline polynomial, the modeling curve of the new method was smooth and matched the ground profile well. As a result of this study, algorithm of proposed three methods to estimate pit excavation volume provided a better accuracy than spot height, chamber, chen and Lin method. And the mathematical model mentioned makes is thought to give a maximum acccuracy in estimating the volume of a pit excavation.

A study on horizontal positing for the seashore reclamation (해안매립을 위한 수평위치 결정에 관한 연구)

  • 문두열
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.2
    • /
    • pp.113-121
    • /
    • 1997
  • With the increase use of electromagnrtic distance measuring equiment, is is required that we need to study the higher dimensional applications and detail technical methods. The purpose of this paper is to improve the accuracy of ocean construction surveying and computer programming for determining of horizontal position of a quadrilateral by measuring line on traverse surveyng, trigulation and trilateration. Aa long distance measurements with high accuracy became possible by the apperance of EDM distance measuring instruments, we induced correct adjustment equation through angle condition and area conditionequation. After that we compared and experimental model. From its a result of the practical applicationto quadrilateral, it has been found that its triangulation and traverse surveying algorithms provide better accuracy than trilateration.

  • PDF

Pozzolan Activity of Heat-treated Dredged Sea Soil (소성된 항만준설토의 포졸란 반응성 분석)

  • Moon, Hoon;Kim, Ji-Hyun;Lee, Jae-Yong;Chung, Chul-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.43-44
    • /
    • 2016
  • Large amount of dredged sea soil is produced in southeast seashore region in during harbor maintenance. Disposal of dredged sea soil has become difficult due to the environmental regulation. Therefore, disposal of dredged sea soil method is to landfill. But, the capacity of the landfill limit state and if the size of the dredged sea soil is in the range of silt or clay, it cannot be used as reclamation material because ground subsidence occur. In this study, analyzed the pozzolanic activity of dredged sea soil. Analysis of the results showed a pozzolanic activity of dredged sea soil. In addition, incorporation of heat treated dredged sea soil increase both 28 and 56 day compressive strength of mortar specimen.

  • PDF

A Study on the Pit Excavation Volume Using Cubic B-Spline

  • Mun, Du-Yeoul
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • v.5 no.1
    • /
    • pp.40-45
    • /
    • 2002
  • The calculation of earthwork plays a major role in the planning and design phases of many civil engineering projects, such as seashore reclamation; thus, improving the accuracy of earthwork calculation has become very important. In this paper, we propose an algorithm for finding a cubic spline surface with the free boundary conditions, which interpolates the given three-dimensional data, by using B-spline and an accurate method to estimate pit-excavation volume. The proposed method should be of interest to surveyors, especially those concerned with accuracy of volume computations. The mathematical models of the conventional methods have a common drawback: the modeling curves form peak points at the joints. To avoid this drawback, the cubic spline polynomial is chosen as the mathematical model of the new method. In this paper, we propose an algorithm of finding a spline surface, which interpolates the given data, and an appropriate method to calculate the earthwork. We present some computational results that show the proposed method, of the Maple program, provides better accuracy than the method presented by Chen and Lin.

  • PDF

Estimation of Coastal Terrain Differences by time-series using GSIS and The chart (GSIS를 이용한 해안 지형의 시계열 변화량 추출)

  • 양인태;한성만;최승필
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2002.04a
    • /
    • pp.219-228
    • /
    • 2002
  • Because western sea on the shore development is threatening sea ecosystem by decrease of silt and large size land-reclamation work by industrialization causes surrounding weather change and sea change, generate much changes bottom of the sea topography and coastline. Also, is influencing to route for safe entry into port of ship, departure. Therefore, this research did 0m boundary line, anxiety 2m line which appear to coastline of land portion and the border of silt using sea base level of lowest low tone side that is base line that appear because of sea waves to basis data numerical value Tuesday, numerical value by divide drawing that is changed to 4 area and analyze change degree of new airport construction and new town development, seashore by western sea district along the coast development of tide embankment construction and so on and bottom of the sea recognize.

  • PDF