We consider a problem of intelligent Integration Information system for research ship, and propose a design as one effective solution of the problem. The goals of the proposed design and system are as follows: management of engine, management of ship, researcher's work, education, training, manage schedule of the project, and thus to manage the whole life cycle of the research ship project. These goals are basically to facilitate and implement innovation- and enhancement-related activities which intelligent Integration Information system is fundamentally pursuing.
Journal of the Institute of Electronics Engineers of Korea SD
/
v.47
no.11
/
pp.54-64
/
2010
Reed-Solomon (RS) codes are the most widely used error correcting codes in digital communications and data storage. Recently, Sudan found algorithm of list decoder for RS codes. List decoder has larger decoding radius than conventional hard-decision decoding algorithms and return more than one candidate polynomial. But, the algorithm includes interpolation and factorization step that demand massive computations. In this paper, an efficient architecture and processing schedule are proposed. The architecture consists of R-MAC, memories, and control unit. The R-MAC computes both of RC and PU steps that are main part of the factorization algorithm. The proposed architecture can achieve higher hardware utilization efficiency (HUE) and throughput by using efficient processing schedule and memory architecture. Also, the architecture can be designed flexibly with scalability for various applications. We design and synthesize our architecture using Dongbu-Anam $0.18{\mu}m$ standard cell library and the maximum clock frequency is 330MHz.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.14
no.6
/
pp.199-205
/
2014
We would like to study and develop the optimized WBS(Work Breakdown Structure) considering project's range, schedule, cost and human resources management with defining phased work in main task and preceding and escorting relationships for effective small and medium enterprises' informatization through standardized PSDM(Production System Development Methodology). For more systemic and effective system built-up, it introduces production information with WBS study which is appropriate for the small and medium enterprises with setting up management items for enhancing system's reliability, quality, productivity, smooth communication among the participated enterprises such as the small and medium enterprises, IT enterprises, and supervision enterprises, and operational support including maintenance of the built system. This study is purpose of helping a lot of the small and medium enterprises and IT enterprises to build up the systems more effective and reliable within planned schedule using the standardized methodology.
For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.
Journal of the Korea Institute of Information and Communication Engineering
/
v.16
no.3
/
pp.499-510
/
2012
An SNS(Social Network Service) is an online service that supports an effective way to share information over virtual communities. Recently, as SNSs such as Twitter, Facebook, and Me2day are getting bigger, the purposes of using popular SNSs are expanded to broadcastings, politics, marketings and so on. In this paper, we propose an API to integrate and manage open APIs for various SNSs, presenting a library as an implementation of the proposed API. Also, utilizing the developed library, a smartphone application is provided which supports integrated management of popular SNSs and personal schedules. Using the library, developers can reduce costs when they need to implement specific functions for managing various SNSs. With the developed application, we can read and write to/from the related SNSs on same screen, automatically reminding our schedule and sharing the schedule with friends over the SNSs.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.12
no.9
/
pp.4103-4121
/
2018
Quality of Service (QoS) awareness is recognized as a key point for the success of Internet of Things (IOT).Realizing the full potential of the Internet of Things requires, a real-time task scheduling algorithm must be designed to meet the QoS need. In order to schedule tasks with diverse QoS requirements in cloud environment efficiently, we propose a task scheduling strategy based on dynamic priority and load balancing (DPLB) in this paper. The dynamic priority consisted of task value density and the urgency of the task execution, the priority is increased over time to insure that each task can be implemented in time. The scheduling decision variable is composed of time attractiveness considered earliest completion time (ECT) and load brightness considered load status information which by obtain from each virtual machine by topic-based publish/subscribe mechanism. Then sorting tasks by priority and first schedule the task with highest priority to the virtual machine in feasible VMs group which satisfy the QoS requirements of task with maximal. Finally, after this patch tasks are scheduled over, the task migration manager will start work to reduce the load balancing degree.The experimental results show that, compared with the Min-Min, Max-Min, WRR, GAs, and HBB-LB algorithm, the DPLB is more effective, it reduces the Makespan, balances the load of VMs, augments the success completed ratio of tasks before deadline and raises the profit of cloud service per second.
Journal of the Korea Society of Computer and Information
/
v.13
no.1
/
pp.29-35
/
2008
For efficient message passing of Parallel programs, it is required to schedule the involved two processes at the same time which are executed on different nodes, that is called 'co-scheduling' However, each node of cluster systems is built on top of general purpose multitasking OS. which autonomously manages local Processes. Thus it is not so easy to co-schedule two (or more) processes in such computing environment. Our work proposes a co-scheduling scheme for MPI-based parallel programs which exploits message exchange information between two parties. We implement the scheme on Linux cluster which requires slight kernel hacking and MPI library modification. The experiment with NPB parallel suite shows that our scheme results in 33-56% reduction in the execution time compared to the typical scheduling case. and especially better Performance in more communication-bound applications.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2002.05a
/
pp.638-642
/
2002
User in video data utilization of high-capacity can grasp whole video data at a look. Offer frame list that summarize information of video data to do so that can remake video from branch that want when need. Need index process of video data for effective video retrieval. This treatise wishes to propose effective method about scene change point detection of video that is been based on contents base index. Proposed method video data so that can grasp whole structure of video detection color value of schedule pixel for diagonal line direction in image sampling do. Data that get into sampling could grasp scene change point on one eye. Color value of pixel that detection in each frame is i frame number by i$\times$j procession to procession A, j stores to reflex height of frame. Introduce MSE and calculate mean error of each frame. If exceed mean error and schedule critical value, wish to detect the frame for scene change point.
The Journal of Korean Institute of Communications and Information Sciences
/
v.32
no.11B
/
pp.709-717
/
2007
Pricing a network service aims for congestion control of the network as well as economic efficiency. A monopolistic supplier providing users with a network service on a shared link needs a pricing schedule that maximizes revenue under the link's bandwidth constraint and guarantees the bandwidth purchased by the users. In that case, nonlinear pricing is an efficient scheme which meets both requirements. This study reviews how nonlinear pricing can be applied to the network service under the constraint and shows that the nonlinear pricing may result in a fixed unit price of bandwidth as linear pricing when demand characteristics of the users follow a power law. Also, the way how the provider with incomplete information on the demand distribution seeks for the optimal pricing from the degree of the network congestion is introduced and the relationship between the development direction of the Internet and internet pricing is considered based on the results of the study.
Constraint directed scheduling techniques, representing problem constraints explicitly and constructing schedules by constrained heuristic search, have been successfully applied to real world scheduling problems that require satisfying a wide variety of constraints. However, there has been little basic research on the representation and optimization of the objective value of a schedule in the constraint directed scheduling literature. In particular, the cost objective is very crucial for enterprise decision making to analyze the effects of alternative business plans not only from operational shop floor scheduling but also through strategic resource planning. This paper aims to explicitly represent and optimize the total cost of a schedule including the tardiness and inventory costs while satisfying non-relaxable constraints such as resource capacity and temporal constraints. Within the cost based scheduling framework, a cost propagation algorithm is presented to update cost information throughout temporal constraints within the same job.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.