• Title/Summary/Keyword: Safety Inspection Process

Search Result 248, Processing Time 0.024 seconds

Estimation of National Loss Expenses to Insufficient Safety Inspection and Precision Safety Diagnosis (부실 정밀점검 및 정밀안전진단의 국가적 손실비용 추정)

  • Ha, Myung-Ho;Park, Jong-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.246-253
    • /
    • 2010
  • National major facilities have been rigorously investigated using regular safety inspections and precision safety diagnosis since the Special Law for Facilities Safety Management was made in 1995. However, the process of safety inspection and precision safety diagnosis could be doubted due to intervention of facility owner for safety level evaluation, competition to obtain low price order, and low technical skills of inspection companies. Although the management processes for evaluating the inspection companies were used for several years, the process should continue to improve in the safety inspection field. This study analyzed the recent evaluation system and the ratios of insufficient inspection. Estimation of national loss expenses to the insufficient safety inspection was investigated to recognize the necessity for the improvement of facility inspection process and evaluation system.

Analysis of Safety of the Chemical Facilities by Korea Risk Based-Inspection in the Petrochemical Plant (석유화학공장에서의 한국형 위험기반검사에 의한 화학설비의 안정성 평가)

  • Kim, Tae-Ok;Lee, Hern-Chang;Shin, Pyng-Sik;Choi, Byung-Nam;Jo, Ji-Hoon;Choi, Byung-Young;Park, Sung-Hoo;Kim, Hung-Kun
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.35-40
    • /
    • 2007
  • As a way of improving the safety of the chemical facilities, the risk based-inspection(RBI) was executed for the facilities of the applied petrochemical plant using KS-RBI Ver. 3.0 program developed based on the API-581 based resource document(BRD). From an evaluation result of KS-RBI program, we could find the evaluation of the process safety management(PSM) for the applied plant, risk of the applied process, risk of static facilities and pipes, and the demage mechanism of the facilities. Also, we could suggest a proper inspection plan(frequency and method of inspection) using the calculated risk and the status of the facilities. Therefore, the applied plant could be achieved a reduced inspection cost by an extension of inspection frequency, improved productivity, improved reliability of the facilities, and a computerized history management.

A Study on the Analysis of Concrete Indurance Inspections Processes (IDEF0를 이용한 콘크리트 내구성 진단 프로세스 분석에 관한 연구)

  • Lee, Dong-Hun;Lee, Sang-Bum;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.113-120
    • /
    • 2005
  • The purpose of this study is to suggest a method of concrete safety inspection management system for safety inspection. this research investigates the process of building safety inspection with IDEF0(Integration DEFinition) process modeling method, focusing on concrete durability inspection, and then suggests a data management system, which allows user communications between site and related unit with RDBMS(Relational Database Management System). The suggested system is expected to provide more efficient data sharing tools and consequently improve safety inspection's quality.

Application of Risk Based-Inspection for the Safety Improvement of the Chemical Facilities (화학설비의 안전성 향상을 위한 위험기반검사의 적용)

  • Kim Tae-Ok;Lu Hern-Chang;Shin Pyong-Sik;Choi Byung-Nam;Jo Ji-Hoon;Jeong Seong-Gweong;Ki O-Hwan;Shin Dong-Il
    • Journal of the Korean Institute of Gas
    • /
    • v.10 no.3 s.32
    • /
    • pp.13-19
    • /
    • 2006
  • As a way of improving the safety of the facilities, the risk based-inspection (RBI) was executed for the chemical facilities by using K-RBI program, which has been developed based on the API-581 based resource document (BRD). As the result of the evaluation, we found the level of the process safety management (PSM) for the applied plant, quantitative risk of the applied process, risk of static facilities and pipes, and the damage mechanism of the facilities. Thus, we could suggest a proper inspection frequency using the calculated risk of the process and the status of the facilities. The applied plant achieved a reduced inspection cost by an extension of the inspection frequency, improved productivity, improved reliability of the facilities, and a computerized history management.

  • PDF

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

A Minimum Cost Model for Merging Production Process with Final Product Quality Constraints (최종품질제약하의 병합공정을 갖는 생산라인의 최소비용 모형)

  • 이경록;박명규
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.169-185
    • /
    • 2003
  • Recently many researchers contributed to the understanding of Quality Control System, but the use of economics in the design of quality assurance system is limited in treatment of the relationship between the average incoming quality level (or average process quality level) of the incoming lot and the average outgoing quality level of this lot. In this study, a traditional concept of sampling inspection plan for the quality assurance system is extended to a consideration of economic aspects in total production system by representing and analyzing the effects between proceeding and succeeding production process including inspection process. This approach recognizes that the decision at each manufacturing process (or assembly process), is to be determined not only by the cost and the average outgoing quality level of that process, but also by the input parameters of the cost and the incoming quality to the succeeding process. By analyzing the effects of the average incoming and outgoing quality, manufacturing or assembly process quality level and sampling inspection plan on the production system, mathematical models and solution technique to minimize the total production cost for a general product manufacturing system with specified average outgoing quality limit are suggested.

An improvement plan for a workplace monitoring system through random selection of workplaces and unnoticed measurement inspection (사업장 무작위 선정 및 불시측정 방식을 통한 작업환경측정제도 신뢰성 제고 방안)

  • Jeong, Jee Yeon;Kang, Tae Sun;Lee, Seung Gill;Park, Hae Dong;Kim, Ki Youn
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.27 no.2
    • /
    • pp.105-114
    • /
    • 2017
  • Objectives: The Ministry of Employment and Labor's enforcement programs, such as workplace monitoring inspection, are one of the major public efforts to protect worker's health. Therefore, a more effective inspection method is required for workplace monitoring, which is helpful for controlling health hazards in the workplace. Methods: For this study, we investigated the related safety and health laws, regulations, and inspection guidelines from the USA, Japan, and Korea. We also analyzed the provisions of industrial safety and health acts, which are related to enhancing the reliability of workplace monitoring. We applied the process of opinion convergence through an experts meeting for our research. Results: We proposed an efficient inspection scheme for workplace monitoring that includes how to select companies(mainly randomized inspections by using a workplace measurement database and workers' compensation insurance database), how to proceed with the inspection process(mainly unannounced visits), and who should carry out this project. Conclusions: We conclude that our proposal for the inspection of workplace monitoring could be a very effective tool for reducing the numbers of companies that do not undertake workplace monitoring and could produce reliable monitoring results.

Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients (고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석)

  • Eung Ho Park;Su Dong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.

A Consideration on the Inspection Frequency of the Periodic Technical Vehicle Inspection (자동차 정기검사 주기에 관한 고찰)

  • Lim, J.M.;Jung, Y.D.;Yeo, U.S.;Kang, B.D.;Youn, Y.H.
    • Journal of Auto-vehicle Safety Association
    • /
    • v.4 no.2
    • /
    • pp.17-21
    • /
    • 2012
  • The periodic technical vehicle inspection is to prevent the accident through the finding and fixing the defects of the vehicle. The periodic technical vehicle inspection in Korea was studied for assessing the adequacy of the inspection frequency. The inspection frequencies of many countries including EU, USA and Japan were compared. The average mileages by the vehicle usage and type were represented. The warranty period and recommended replacement period of parts of the domestic auto makers was studied. Currently, the inspection frequency for the periodic technical vehicle inspection in Korea is appropriate. The pass-fail rate and the cost-benefit analysis for the periodic technical inspection in Korea will be needed in the decision making process for the inspection frequency.

Design and Operation of Acceptance Control Chart Using Variable Acceptance Sampling Scheme Based on Operating Characteristics(OC) Curve (계량 규준형 샘플링 검사 스킴을 이용한 합격판정 관리도의 설계 및 운영)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.04a
    • /
    • pp.443-450
    • /
    • 2008
  • This paper is to present design principle and operation strategy of acceptance control chart by the use of OC-Based sampling inspection for continuous data. The unified control limits for acceptance control chart when considering both APL(Acceptable Process Level) and RPL(Rejectable Process Level) are proposed. The control limits can be also extended to the acceptance control chart with unknown process standard deviation.

  • PDF