• 제목/요약/키워드: Road Monitoring

검색결과 396건 처리시간 0.023초

Condition monitoring and rating of bridge components in a rail or road network by using SHM systems within SRP

  • Aflatooni, Mehran;Chan, Tommy H.T;Thambiratnam, David P.
    • Structural Monitoring and Maintenance
    • /
    • 제2권3호
    • /
    • pp.199-211
    • /
    • 2015
  • The safety and performance of bridges could be monitored and evaluated by Structural Health Monitoring (SHM) systems. These systems try to identify and locate the damages in a structure and estimate their severities. Current SHM systems are applied to a single bridge, and they have not been used to monitor the structural condition of a network of bridges. This paper propose a new method which will be used in Synthetic Rating Procedures (SRP) developed by the authors of this paper and utilizes SHM systems for monitoring and evaluating the condition of a network of bridges. Synthetic rating procedures are used to assess the condition of a network of bridges and identify their ratings. As an additional part of the SRP, the method proposed in this paper can continuously monitor the behaviour of a network of bridges and therefore it can assist to prevent the sudden collapses of bridges or the disruptions to their serviceability. The method could be an important part of a bridge management system (BMS) for managers and engineers who work on condition assessment of a network of bridges.

생활소음종합대책 : 교통소음 (Community Noise : Transpotation Noise)

  • 손정곤;김정수;김홍찬
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2006년도 춘계학술대회논문집
    • /
    • pp.89-101
    • /
    • 2006
  • This study is a part of ???A study of the community noise:new guideline and policy' which have three main topics and ten sub-topics. Accordingly this part deals with a transpotation noise specifying road traffic ,railroad and aircraft noise, respectively. At first, the ,roadside traffic noise of whole country in 2004 ,22 major cities of total 29 was exceeded the envionmetal noise standards, 55dB(A) at night time ,therefore 24 milion people ,52.4% of korean, who reside at roadside estimates to be exposured the basic problems of this serious noise polluation comes from:: i)It's very limited noise mitigation measures against to continuously increase the number of automobile yearly. ii) and at beginning of road design, It has been neglect to introduce the anti-noise design and layout of road structural scheme as gadient,cutting and viaduct,embankment and zonning of roadside land-buffer area and also re-designation of noise sensitive areas,etc. Secondly ,concerned with the railroad trafffic noise, a inhabitants who are over the envionmetal noise limits,70dB(A), 65 dB(A) in day and night for 34 locations of mayor cities was exposured of 167,000 and 329,000 respectively. With the development of noise mitigation schemes in line with this study it is likely that noise monitoring system needs new installation as well as common use of noise assessment index with $L_{MAX}\;and\;L_{EQ}$. Lastly,noise complaints of millitary aircraft has been rapidly increasing ,so 2.9%(1.4 minion) person demands a compansation of \2,133 billion complying with their requirements we suggest to minimise the airport noise that is to develop of noise abatement procedure ,to make new noise index, to increase budget for house insulations and also to more increase of those the noise monitoring system and to unify the management etc.

  • PDF

수질 장기관측자료를 활용한 우리나라의 지하수 수질변동 특성

  • 김규범;이강근
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2003년도 총회 및 춘계학술발표회
    • /
    • pp.94-96
    • /
    • 2003
  • Since 1995, MOCT(Ministry of Construction and Transportation) and KOWACO(Korea Water Resources Corporation) have established the National Groundwater Monitoring Network in South Korea and also MOE(Ministry of Environment) has operated Groundwater Quality Monitoring network. Until 2001, 202 monitoring stations by MOCT and 780 monitoring wells by MOE have been constructed, measured groundwater level and analyzed water samples. Groundwater quality analysis has been conducted two times a year during last 6 years for all monitoring wells. The quality data has about 15 components including pH, COD, Count of Coliform group, and etc.. Trend analysis has been peformed for 6 components(Coliform, pH, COD, NO$_3$-N, Cl and EC) of water quality which are analyzed more than 7 times for total monitoring wells. Two test methods have been used ; Sen's test and Mann-Kendall test. These trend tests have been done at the 0.05 significance level. By the result of Sen's test, Count of Coliform group has either upward or downward trends at 4.3 percent of the monitoring points. pH does at 5.6 percent, COD does at 8.6 percent, Nitrate-Nitrogen does at 13.2 percent, Chloride does at 13.4 percent, and. EC does at 11.6 percent of the monitoring points. The exact causes of the groundwater quality trends are difficult to specify. Notable downward trends in nitrate at many monitoring points may be the result of reduction on some contamination sources. Potential causes include diminished agricultural areas, improvements in sewage treatment and a decrease in atmospheric deposition. Increase in chloride at many monitoring points may be the result of increased non-point source pollution such as road salting and runoff from sprawling paved developments and suburbs.

  • PDF

"Belt and Road" and Arbitration Law Teaching and Education System Theory

  • Fuyong, Zhu
    • 한국중재학회지:중재연구
    • /
    • 제30권3호
    • /
    • pp.47-66
    • /
    • 2020
  • Due to the division of China's departmental laws, the disconnect between theory and practice, and the influence of traditional academic thinking on the understanding of the knowledge structure of arbitration legal talents in practice, the construction of law school colleges, teaching teams, and research centers mostly revolves around departmental laws, tearing the connection of the arbitration legal system. The student-centered, process-guaranteed, and result-oriented arbitration master of law training model is "virtualized," the shaping of arbitration professionalism is ignored, the coverage of practical teaching is narrowed, and the arbitration legal profession is mostly formalized. The prevalence of specialized curriculum systems shortage, single faculty, formalized practical teaching, outdated curriculum settings, unsuitable curriculum system design for development, and inaccurate professional curriculum standards and positioning renders it difficult to integrate the "Belt and Road." The cutting-edge, the latest research results, and practical experience cannot reflect the connotation, goals, and requirements of "Entrepreneurship" education, as well as arbitral issues such as the ineffective monitoring of practical education and the inconsistent evaluation of standards and scales. Under the background of the "Belt and Road," based on system theory and practice and through training goals that innovate and initiate organizational form, activity content, management characteristics, assessment and support conditions, etc., the arbitration law teaching curriculum system is gradually improved and integrated. Through the establishment of a "Belt and Road" arbitration case file database and other measures, a complete arbitration law theory and practice teaching guarantee system has been established. Third parties are introduced, arbitration law experimental modules are developed, students are guided how to discover new knowledge, new contents are mastered, solidarity, cooperation, and problem-solving capabilities are cultivated in the practice of the "Belt and Road," and quality education, vocational education, and innovation education are organically integrated. In order to implement the requirements of arbitration law education, innovation development and collaborative management of arbitration law teaching practice base should be cultivated, thus giving full play to the effect of collaborative education between universities and arbitration institutions.

철도사업 환경영향평가와 환경관리(I) (Environmental Impact Assessment and Environmental Management of Railways (I))

  • 이현우;이영준;박영민;이정호;윤미경
    • 환경영향평가
    • /
    • 제13권6호
    • /
    • pp.295-305
    • /
    • 2004
  • After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.

도로이동오염원의 활동도와 도로변 질소산화물 농도의 관계 (Relation with Activity of Road Mobile Source and Roadside Nitrogen Oxide Concentration)

  • 김진식;최윤주;이경빈;김신도
    • 한국대기환경학회지
    • /
    • 제32권1호
    • /
    • pp.9-20
    • /
    • 2016
  • Ozone has been a problem in big cities. That is secondary air pollutant produced by nitrogen oxide and VOCs in the atmosphere. In order to solve this, the first to be the analysis of the $NO_x$ and VOCs. The main source of nitrogen oxide is the road mobile. Industrial sources in Seoul are particularly low, and mobile traffics on roads are large, so 45% of total $NO_x$ are estimated that road mobile emissions in Seoul. Thus, it is necessary to clarify the relation with the activity of road mobile source and $NO_x$ concentration. In this study, we analyzed the 4 locations with roadside automatic monitoring systems in their center. The V.K.T. calculating areas are set in circles with 50 meter spacing, 50 meter to 500 meter from their center. We assumed the total V.K.T. in the set radius affect the $NO_x$ concentration in the center. We used the hourly $NO_x$ concentrations data for the 4 observation points in July for the interference of the other sources are minimized. We used the intersection traffic survey data of all direction for construction of the V.K.T. data, the mobile activities on the roads. ArcGIS application was used for calculating the length of roads in the set radius. The V.K.T. data are multiplied by segment traffic volume and length of roads. As a result, the $NO_x$ concentration can be expressed as linear function formula for V.K.T. with high predictive power. Moreover we separated background concentration and concentrations due to road mobile source. These results can be used for forecasting the effect of traffic demand management plan.

ROADMOD를 이용한 도로청소 및 모래여과시설에 의한 고속도로에서의 강우시 TSS 저감효과 분석 (Removal Efficiency of TSS Loadings from Expressway by Road Sweeping and Sand Filter Facility Using ROADMOD)

  • 강희만;전지홍
    • 한국물환경학회지
    • /
    • 제39권1호
    • /
    • pp.38-45
    • /
    • 2023
  • In this study, the removal efficiency of road sweeping and sand filter facility for removing total suspended solid (TSS) as nonpoint source pollution from expressway was evaluated for the last 10 years (2012~2021) using ROADMOD. ROADMOD is a screening level model and was calibrated for runoff rate and TSS loading both at the inlet, which is the loading from the drainage area, and the outlet, from the sand filter facility. The drainage area is 715 m2 and the dimensions of sand filter facility are 1.5 m (wide) × 3.8 m (length) × 1.5 m (depth). The monitoring period for model calibration was the rainfall event during Aug. 31~Sep. 1, 2021 and the amount of rainfall was 74.5 mm. As a result of calibration, the determination coefficients (R2) of the flow rate were 0.66 and 0.86, for the inlet and outlet, respectively, and those of TSS loading were 0.50 and 0.84, for the inlet and outlet, respectively. Considering that ROADMOD is a screening level model, the calibration results were reasonable to evaluate the best management practices (BMPs) on the expressway. Using ROADMOD simulation results for 2012~2021, the average yearly runoff rate from the expressway was 82% and removal efficiency was 9% for road sweeping, 35% for sand filter facility, and 39% for both road sweeping and sand filter facility.

단편화된 서식처의 연결을 위한 야생동물 이동통로의 조성 -대상지 선정 및 조성기법을 중심으로- (A Study on the Wildlife Corridor for Connecting Fragmented Habitat -Focused on Site Selection and Design Methods-)

  • 김귀곤;최준영;손삼기
    • 한국조경학회지
    • /
    • 제28권1호
    • /
    • pp.70-82
    • /
    • 2000
  • This is a study to generate a theoretical base for the development of wildlife corridor as a solution to the problems of wildlife population size reduction and declining bio-diversity resulting from the fragmented habitats caused by road constructions. This study seeks to examine and define techniques in very aspect of wildlife corridor including planning, site selection, design and development, and maintenance through an actual application. The results of this study are as follows. 1) The wildlife corridor should be developed in an approach supplementing a landscape ecological approach and a restoration ecological approach bilaterally. To this end, systematic methodology and process are required. 2) It was restored an ecosystem as close as possible go to the forest ecosystem before road development. In addition, in order to allow it to function as an ecological corridor, topography restoration, stream development, and ecological plantation were implemented. 3) The result of monitoring activities that continued for one year since the development confirmed the migration and inhabitation of a number of animals including small mammals. It is judged that it functions as a corridor in fragmented habitats as initially expected. 4) Through continuous monitoring in the future, the effects of corridor development on ecological restoration need to be reviewed in a long-term perspective. There is also a need to develop and refine a comprehensive maintenance plan for wildlife corridors and their surroundings. Based on such study results, actual data on the development of wildlife corridor should be accumulated. In follow-up studies, after continuous monitoring for a long period of time, the effects of wildlife corridor development should be evaluated comprehensively and wildlife corridor applicable to Korea should be standardized by correcting disclosed problems.

  • PDF

Long Term Monitoring of Storm Surface Runoff from Urban Pavement Road in Korea

  • Lee, C.S.;Seo, G.T.;Lee, J.H.;Yoon, Y.S.;You, J.J.;Sin, C.K.
    • Environmental Engineering Research
    • /
    • 제13권4호
    • /
    • pp.184-191
    • /
    • 2008
  • Long term monitoring was conducted to investigate a surface runoff of pollution from urban highway. The monitoring data was collected for 18 rainfall events and was used to correlate pollution load to various parameters, such as rainfall intensity, antecedent dry days and total discharge flow. Runoff coefficient and seasonal variation were also evaluated. The mean runoff coefficient of the highway was 0.823(range; $0.4687{\sim}0.9884$), and wash-off ratio for $COD_{Mn}$ and SS loads was 72.6% and 64.3%, respectively. For the initial rainfall event, the runoff EMC of $COD_{Mn}$ was high in summer and the EMC of SS was high in autumn season. However the seasonal variation of T-N and T-P was not significant. The discharged $COD_{Mn}$-EMC was $147.6\;mg/L{\sim}9.0\;mg/L$ on the generated $COD_{Mn}$-EMC of $98.8\;mg/L{\sim}8.9\;mg/L$. While the generated EMC of SS was in $285.7\;mg/L{\sim}20.0\;mg/L$ and its discharged EMC was in $190.4\;mg/L{\sim}8.0\;mg/L$. EMC of pollutants was not directly related to the first flush rainfall intensity and the antecedent dry days. But the correlation was relatively high between EMC and cumulative runoff flow volume. The trend of EMC was reduced with the cumulative runoff flow volume.

사면붕괴 피해 예방을 위한 낙석신호등 설치 사례 연구 (A Case Study of the Rock-fall Signal Lamp System for Preventing the Damage at the Cut-Slopes)

  • 김승현;구호본;이종현;백용
    • 지질공학
    • /
    • 제17권2호
    • /
    • pp.253-261
    • /
    • 2007
  • 집중강우에 의해 주로 발생되는 절토사면 붕괴는 인적, 물적 피해를 초래한다. 한국건설기술연구원은 예방 수단으로서 위험사면을 집중관리하고 있다. 지속적인 사면관리에도 불구하고 지구환경의 변화로 절토사면의 붕괴발생 빈도는 점차적으로 증가하고 있다. 이에 대책공법 적용이 어려운 절토사면에 대하여 상시계측시스템을 설치하고 있다. 상시계측시스템의 운용은 대인 대물 피해에 대한 조치로서 활용될 수 있으나, 강우시 절토사면의 붕괴 징후를 인지하더라도 관리자가 현장관리 작업을 수행함에 있어서 시공간적 제약으로 인한 한계가 있다. 낙석신호등은 상시계측시스템을 통하여 사면 위험 징후가 발견될 시, 도로이용자에게 낙석발생에 대한 위험을 주지시키고, 붕괴시 도로관리자의 현장 도착 전까지 자동적으로 또는 수동적으로 도로를 차단시킴으로서 사면붕괴에 의한 피해를 예방하는 관리시스템의 일종이다.