Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Sensitivity Analysis for Railway Development Areas Using Land Cover Map (토지피복지도를 활용한 철도개발지의 민감도 분석)

  • Kim, Min-Kyeong;Kim, Dong-Yoeb
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.76-84
    • /
    • 2017
  • Recently, the 'Ecological Network Restoration Project at Chupungnyeong' has been placed; this project is located at the center of the Baekdu mountain spine, the core of the ecological network of the Korean Peninsula. In the process of industrialization since the early 1900s, this area has been under railroad and road construction; as such, wildlife movements have been interrupted and many cases of road-kill have been found. The investment in railroads has increased because railroads are an environmentally sound means of transportation. Single track railways have been converted to double track electric railways and track reforming projects are underway in order to speed up the current railway system. This study suggests to take land use as a standard for assessing the ecological weaknesses of the domestic geo-spaces that are to be affected by rapid extension of railway lines. The land cover map issued by the Ministry of Environment was overlapped with the Korean Railway Line Map for analysis. The results showed that five items were high in sensitivity: paddy fields, fields, deciduous forests, bare land, and inland waters. It seems to be necessary to set weights for highly sensitive land use types; also, specific evaluation criteria need to be reestablished.

A Study on the Patterns and Characteristics of Spatial Changes in Unregistered Private House Gardens (문화재 미등록 민가정원의 공간변화 양상 및 특성 연구)

  • Lee, Kyeong-Mi;Bae, Jun-Gyu;Shin, Hyun-Sil
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.3
    • /
    • pp.67-73
    • /
    • 2022
  • This study tracked the changing process of unregistered private house gardens by using the form at the time of the construction of gardens as the prototype of each garden, investigated the spatial value of the garden, and discussed the historical spatial value of unregistered private house gardens in terms of inheritance and change of traditional gardens. To this end, targeting on unregistered private house gardens in Gangwon-do, which are in danger of preserving their gardens due to the recent increase in the number of designated cultural heritage dismantled, the patterns of unregistered private house gardens, their characteristics and values were identified through the spatial change of the garden, and the following results were derived. First, the unregistered private house gardens were able to inherit and maintain the form of a traditional garden, being located in a clan village. The garden space was divided by the influence of Confucian philosophy, and the components of the garden, tree species and planting methods appeared differently. In other words, the use of garden components according to the status hierarchy appeared. Second, space reduction was continuously confirmed at four target sites. The reduced spaces are garden spaces, and part of the garden was attributed to the state due to the building of new road and environmental improvement project. The reduced spaces are garden spaces, and part of the garden was attributed to the state due to the new road and environmental improvement project. Third, eight old big trees over 100 years old were identified in three of the four target sites, and the garden components such as stone water tanks, quickset doors, and ponds were commonly identified in Korea, China, and Japan during the Joseon Dynasty, inheriting the historicity of the traditional garden.

A Study on Methods for the Domestic Diffusion of Intelligent Security Project : With a Focus on the Case of Smart City Integrated Platform (지능형 방범 사업의 국내 확산 방안 연구 : 스마트시티 통합플랫폼을 대상으로)

  • Shin, Young-Seob;Han, Sun-Hee;Lee, Jae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.7
    • /
    • pp.474-484
    • /
    • 2019
  • In this age, where the social environment is changing rapidly and unpredictably, interest in safety from crime is increasing in Korean society. As the desire to live a life free from the fear of crime increases, interest in the construction of safe cities is also rising nationwide. To meet the national demand, the Korean government is promoting a project to link public disaster safety systems by involving municipalities, 112, 119, and other emergency services and institutions through the Smart City Integrated Platform in order to construct a smart safety net. This study investigates the linking of theSmart City Integrated Platform and theIntelligent Security Project. The results are as follows. 1. The linkage's objective is clear. 2. The system sector can provide information to accident-related organizations. 3. The scenario area can be expanded to a crime-prevention sector, and a long-term urban information integration infrastructure can be created. 4. Product testing is enabled by a smart city road map and through continuous consultation with relevant organizations. 5. Project diffusion to other local governments can be promoted with the continued addition of commercial products.

A Study on Cost Prediction of Highway Operating Risk through a Case Study of Power Failure (정전사고 사례분석을 통한 고속도로 운영 위험비용 산정에 대한 연구)

  • Kwon, Yong-Hoon;Kim, Kyong-Ju;Lim, Won-Seok;Park, Chan-Jin;Chae, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.78-90
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

Building Integrated Vegetation Systems into the New Sainsbury's Building Based on BIM

  • Lee, Dong-Kyu
    • Journal of KIBIM
    • /
    • v.4 no.2
    • /
    • pp.25-32
    • /
    • 2014
  • Today, there is a growing need of environment-friendly buildings, so-called 'green', facilities, and energy saving buildings to decrease environmental pollutants released into cities by construction activities. Green-Building Information Modeling (Green-BIM) is a purpose-built solution which supports to forecast energy consumption of 3-D model of a building by augmenting its primary 3-D measurements (width, height and depth) with many more dimensions (e.g. time, costs, social impacts and environmental consequences) throughout a series of sequential phases in the lifecycle of a building. The current study was carried out in order to integrate vegetation systems (particularly green roof and green wall systems) and investigate thermal performance of the new Sainsbury's building which will be built on Melton road, Leicester, United Kingdom. Within this scope, a 3-D building model of the news Sainsbury's building was first developed in $Autodesk^{(R)}$ $Revit^{(R)}$ and this model was then simulated in $Autodesk^{(R)}$ $Ecotect^{(R)}$once weather data of the construction site was obtained from $Autodesk^{(R)}$ Green Building $Studio^{(R)}$. This study primarily analyzed data from (1) solar radiation, (2) heat gains and losses, and (3) heating and cooling loads simulation to evaluate thermal performance of the building integrated with vegetation system or conventionally available envelops. The results showed that building integrated vegetation system can potentially reduce internal solar gains on the building rooftops by creating a 'bioshade'. Heat gains and losses through roofs and walls were markedly diminished by offering greater insulation on the building. Annual energy loads for heating and cooling were significantly reduced by vegetation more significantly through the green roof system in comparison to green wall system.

IMPROVING RELIABILITY OF BRIDGE DETERIORATION MODEL USING GENERATED MISSING CONDITION RATINGS

  • Jung Baeg Son;Jaeho Lee;Michael Blumenstein;Yew-Chaye Loo;Hong Guan;Kriengsak Panuwatwanich
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.700-706
    • /
    • 2009
  • Bridges are vital components of any road network which demand crucial and timely decision-making for Maintenance, Repair and Rehabilitation (MR&R) activities. Bridge Management Systems (BMSs) as a decision support system (DSS), have been developed since the early 1990's to assist in the management of a large bridge network. Historical condition ratings obtained from biennial bridge inspections are major resources for predicting future bridge deteriorations via BMSs. Available historical condition ratings in most bridge agencies, however, are very limited, and thus posing a major barrier for obtaining reliable future structural performances. To alleviate this problem, the verified Backward Prediction Model (BPM) technique has been developed to help generate missing historical condition ratings. This is achieved through establishing the correlation between known condition ratings and such non-bridge factors as climate and environmental conditions, traffic volumes and population growth. Such correlations can then be used to obtain the bridge condition ratings of the missing years. With the help of these generated datasets, the currently available bridge deterioration model can be utilized to more reliably forecast future bridge conditions. In this paper, the prediction accuracy based on 4 and 9 BPM-generated historical condition ratings as input data are compared, using deterministic and stochastic bridge deterioration models. The comparison outcomes indicate that the prediction error decreases as more historical condition ratings obtained. This implies that the BPM can be utilised to generate unavailable historical data, which is crucial for bridge deterioration models to achieve more accurate prediction results. Nevertheless, there are considerable limitations in the existing bridge deterioration models. Thus, further research is essential to improve the prediction accuracy of bridge deterioration models.

  • PDF

The Accuracy Estimation of Profile Generation for Planning using 3D Topographical Model (3차원 지형모델을 이용한 설계용 프로파일 생성 정확도 평가)

  • Um, dae-yong;Lee, eun-soo;Kim, ji-hye
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.892-896
    • /
    • 2008
  • In construction work's process of a basic planning, we must carry out a topographical for construction reserved land and to the basis of this, production of profile is Indispensable factor for the purpose of every construction work such as road, rail way, canal and etc. From this research, the production of profile about construction reserved land, using topography information of numerical value topographical map produced by NGIS construction project, construct precision 3D topography model and from this, propose plans for utilizing by producing automatic profile. With the aim of this, abstract every layers of main facilities and altitude from numerical value topographical map and while producing 3D topography model by using this, we produce and product automatic profile from construct precision 3D topography. And about the produced profile's process, a topographical by mutual analysis was carried out to check whether the automatic produced profile's accuracy could be accepted at actual estimation and permissible accuracy. It is considered that the result of the research could be suggested as a new formation techniques concept which can reduce the designing time and expenses and increase the efficiency of planning in the basic design process for the construction.

  • PDF

An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate (국내터널 굴착 사이클타임에 대한 분석결과와 표준품셈과의 비교)

  • Kim, Yangkyun;Kim, Hyung-Mok;Lee, Sean S.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.137-153
    • /
    • 2019
  • Estimating tunnel construction time and costs are the most fundamental part of a tunnel project planning, which has been generally assessed on a deterministic basis until now. In this paper, excavation cycle time was investigated for two road tunnels and one subway tunnel, and the results were compared with the Standard of Construction Estimate (SE), which is made for the estimation of construction time and cost in a design stage. The results show that the difference in cycle time between SE and actual cycle time is 50%, 7% and 31% respectively for the three tunnels, which means that SE does not reflect practical operation time. The major reasons of the difference are skilled level of tunneling workers, the change of operation sequences for more effective operations, much more complicated working atmosphere in a tunnel than the assumption of SE etc. Finally, even though the results can not be generalized since investigated tunnels are only 3, but it is thought that SE needs to be upgraded into the model able to consider quite common situations through additional tunnel investigation and studies in the future.

Comparing Laboratory Responses of Engineered Emulsified Asphalt and Foamed Asphalt Mixtures for Cold In-place Recycling Pavement (현장 상온 재생 아스팔트 포장을 위한 고점착 유화 아스팔트 혼합물과 폼드 아스팔트 혼합물의 반응특성 비교)

  • Kim, Yong-Joo Thomas;Lee, Ho-Sin David
    • International Journal of Highway Engineering
    • /
    • v.12 no.1
    • /
    • pp.79-86
    • /
    • 2010
  • Cold in-place recycling (CIR) using emulsified asphalt or foamed asphalt has become a more common practice in rehabilitating the existing asphalt pavement due to its cost effectiveness and the conservation of paving materials. As CIR continues to evolve, the engineered emulsified asphalt was developed to improve the field performances such as coating, raveling, retained stability value and curing time. The main objective of this research is to compare the laboratory responses of the engineered emulsified asphalt (CIR-EE) mixtures against the foamed asphalt (CIR-foam) mixtures using the reclaimed asphalt pavement (RAP)materials collected from the CIR project on U.S. 20 Highway in Iowa. Based on the visual observation of laboratory specimens, the engineered emulsified asphalt coated the RAP materials better than the foamed asphalt because the foamed asphalt is to create a mastic mixture structure rather than coating RAP materials. Given the same compaction effort, CIR-EE specimens exhibited lesser density than CIR-foam specimens. Both Marshall stability and indirect tensile strength of CIR-EE specimens were about same as those of CIR-foam specimens. However, Marshall stability and indirect tensile strength of the vacuum-saturated wet specimens of CIR-EE mixtures were higher than those of CIR-foam mixtures. After four hours of curing in the room temperature, the CIR-EE specimens showed less raveling than the CIR-foam specimens. On the basis of test results, it can be concluded that the CIR-EE mixtures is less susceptible to moisture and more raveling resistant than CIR-foam mixtures.