In order to prevent the global warming, Korea has had a ratification to the Kyoto Protocol which is specified the air pollution level should be lower the condition of the year 1990 until the year 2012, in hence the traffic system produced mostly the air pollution has been faced to big change. According to the reinforcement of higher level for environmental condition, alternative way to the conventional traffic system is required, so that is fuel cell technology of commercialized R&D program used by hydrogen fuel, and further for the optimized high energy efficiency it has been considered the advanced development of traffic system used the conventional railroad system. But it is moreover expected the huge amount of initial investment, so at the current, next new traffic system is needed. This study is for the improvement of urban traffic system in domestic which should be seriously changed for environmental friendly through the reduction of air pollution by fuel gases of vehicle and human convenience to be easily approached. In hence it is proposed the development of superior high efficiency-'Fuel-cell Rubber-tired Tram' system manufactured by the composite car-body.
Seasonal variation of natural gas demand coupled with rigid and stable import pattern of gas represents the characteristic feature of the Korean Liquified Natural Gas(LNG) industry. This attribute has required a huge amount of investment for the construction of storage facility. Thus, to minimize the supply cost, it is legitimate to reduce storage requirement itself. In this study, we combine three alternative methods to deal with the storage requirement to minimize the supply cost. Those are (1) adding additional storage tanks, (2) inducing large firm customers, and (3) constructing gas-turbine self generation facilities. Methodologically, we employ the mixed integer program (MIP) to optimize the system. The model also consider demand and price-setting scheme in separate modules. From the results, it is shown that if alternatives are combined optimally, a number of storage tanks can be reduced substantially compared with the original capacity plan set by the industry authorities. We perform various sensitivity analyses to check the robustness of the results. The methodology presented in this study can be applied to the other physical network industry, such as hydraulics. The empirical results will shed some light on the rationalization of capacity planning of the Korean natural gas industry.
This paper is a feasibility study on the calculation of operating cost in regards to the overall operation following the completion of a number of LRT lines currently in progress. Owing to the absence of operating experience in driveless LRT system at home, the difficulties lie in the assumption of the optimal operating budget applying domestic real situation. Nevertheless, with 34 years of accumulated operating experience in heavy rail transit system, Seoul Metro, the nation's biggest urban rail transit operator, performs O&M consultancy services for several on-going projects along with every effort to acquire know-how where the appropriateness of the cost estimation as a required deliverable is reviewed and a more efficient way is provided. The main focus of this study is to seek a method to calculate the optimal amount of operating expenses as well as a cost-effective alternative for possible weaknesses from the standpoint of the operator. The body of this paper discusses the five issues such as personnel cost, overhead, maintenance cost, additional purchase price, alternative investment fee from a more macroscopic point of view, and the conclusion deals with the adequacy of the reason for selection of institutions with various operating know-how.
The 2th International Conference on Construction Engineering and Project Management
/
pp.509-519
/
2007
Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.
본 연구에서는 우리나라 생태숲조성 기본계획 수립의 실태를 파악하고, 문제점 및 개선방향을 제시 하였다. 우리나라 생태숲조성 계획의 제한요소로는 입지여건, 지형적 측면, 기존식생 등의 문제가 높은 빈도로 나타났다. 토지이용현황은 사유지의 평균 비율이 29.7% 이었으나 실질적인 사업비의 투자는 되지 않은 것으로 나타났다. 도입빈도가 높은 시설은 기반시설, 건축시설, 휴게시설, 편익시설, 안내시설 등 이었으며, 도입빈도가 낮은 시설은 식물재배시설, 생태시설, 상징시설 등으로 나타났다. 식물 종 보유현황은 500종류 이상을 보유한 곳이 1개소이었고, 산림청이 제시한 생태숲조성 기준의 식물종다양성 기준 이하는 11개소 이었다. 사업비는 시설투자비가 식재비보다 매우 높았으며, 후기투자사업비 보다 초기투자사업비 월등히 많았고, 조성 이후의 유지관리에 대한 예산 계획 수립이 거의 없었다. 산림청이 제시한 생태숲조성의 기본 개념은 충실하게 계획 하고 있었으나 세부적인 도입 계획에서는 이용자 중심 위주로 계획 되어져 생태숲조성 기본 취지에 어긋나고 있었다. 이러한 현상은 생태숲조성을 주관하는 지방자치단체가 사업추진을 위한 과정에서는 산림청이 제시한 내용을 제안하고, 사업이 확정된 이후에는 산림청이 제시한 내용을 대부분 무시하여 전시효과를 위한 생태숲조성 방식으로 변화하기 때문이다. 산림청에서 제시하는 생태숲조성을 위해서는 산림청의 감독이 강화되어야 하고, 지방 자치 단체장, 감독부서, 계획 및 설계자 등 담당자들이 생태숲에 대한 명확한 개념 정립을 하여야 할 것이다.
International Journal of Naval Architecture and Ocean Engineering
/
제6권2호
/
pp.471-483
/
2014
Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.
현재 건물 부력에 대한 보호조치로 경제성 및 효율성 측면을 고려하여 영구배수 공법의 사용이 증가하고 있다. 영구배수공법은 건축물에 접하는 지하수를 외부로 배수시켜 건축물에 작용하는 부력을 근본적으로 제거하는 공법으로, 영구배수공법 사용시 유출지하수가 발생하게 된다. 또한 우리나라는 국제인구행동연구소(PAI)에서 지정한 물 부족 국가로 지정되어 유출지하수의 활용이 요구되고 있지만 이에 대한 평가프로세스가 아직 충분하지 않다. 따라서 본 연구는 현장 적용 사례를 통해 현장 단위에서 유출되는 지하수의 활용여부를 결정할 수 있는 평가 프로세스를 구축하고 경제성을 분석하였다. 그 결과 상수도와 비교한 10년간 상수절감 비용을 통해 유출지하수의 활용이 가능한 것으로 나타났다.
한국항해항만학회 2006년도 International Symposium on GPS/GNSS Vol.1
/
pp.211-216
/
2006
Within the frame of the MERCOSUR (South Common Market), one of the most important goals to achieve by its member states is a better cost effective international cargo transportation system. For this purpose the project of developing a commercial waterway linking the east region of Uruguay with the south of Brazil has been under study for a number of years now. Because of the high costs involved on the development of such waterway, the project has been indefinitely delayed. It is our intention to show an alternative way to reduce the present obstacles by using a budget oriented approach in order to determine the vessel best suited to use on the proposed waterway. So far, every study related to the project has been focused on the amount of work needed to modify the environment in order to accommodate the hardware already available in the region. The conclusions show that the cost of opening and maintaining the required navigation channel is high enough to discourage investment; the added responsibility to take care of any environmental damage incurred during the building and/or operation of the waterway makes searching for a less costly and hazardous option an interesting challenge. The proposed terminal on the Cebollat? River would be located at the heart of the Uruguayan rice growing region. Uruguay exports 90% of its rice production, being Brazil its biggest buyer. Wood chips and clinker are the other types of cargo considered to use the proposed waterway in route to either Brazil or to overseas destinations through the deep water port of Rio Grande. Through the analysis of local data by a Geographical Information System, international regulations regarding inland waterways and shallow draught vessel characteristics, we seek to propose a cost efficient alternative to apply on this particular scenario.
본 연구는 고령인력 증가가 다른 영역보다 빨리 진행되며, 인적자원관리가 쉽지 않은 공기업 임금피크 근로자의 인구 경제 조직적 특성과 임금피크제 및 퇴직 간 관계에 대해 살펴보고자 하였다. 연구대상은 임금피크제 실시 공기업 19개사에 종사하는 임금피크 근로자 211명이었다. 연구결과에 따르면 인구 경제적 특성에 있어서, 교육수준, 가계총수입, 퇴직 후 생활비, 퇴직대비저축과 투자금액은 임금피크만족도, 임금피크수용도, 퇴직준비와 퇴직태도에 영향을 미치는 것으로 나타났다. 조직적 특성에서는 직급과 직군, 근무기간과 정년퇴직잔여기간, 퇴직준비프로그램 참여 그리고 임금피크 적용 여부에 따라 각각 차이가 나타났다. 연구 결과를 바탕으로 고령사회를 위한 실효성 있는 임금피크제 시행을 위해서는 복지지원, 교육훈련, 전직지원과 같은 고령친화인사제도의 직군, 직급, 경제수준 및 교육수준 별 시행의 필요성을 시사함과 동시에 후속 연구를 위한 제언을 논의하였다.
This study is aimed at evaluating the present management status of the rural special production area development projects and identifying managerial problems to propose new direction of the political countermeasures for the projects. In the con text of implementing the five year's economic developent plans for the past three decades, agricultural production and farm-household income have also been grown rapidly. However the income gap between rural and urbarn laborer, as an internal problem, has widened during the decades and the UR problems concerning free trade of agricultural products, as an external problems, are now agonizing the small-holder farm economy in Korea. The internal and external farm problems could be solved through improvement of agricultural structure and provision of off-farm jobs for farm household income increase. As a part of the off-farm income sources, the rural special production area development projects have propelled by the government throughout the country. The main problems to be solved for the successful implementation of the projects are as follows : 1. Present loan amount by the financial fund was estimated at 6-7% of the total installation costs required. To expand and implement the project successfully, enough financial credit support with favorable terms and conditions have to be considered by the government. 2. The operation patterns of the special production area development project should be recommended from the view point of cooperative and private operation to maximize farm household incomes including profits, marketing charges and dividens. 3. Improvement of the marketing channel of the products and marketing information through TV program and other mass communication should be implemented strongly to promote marketsales by the financial supports of the government. 4. In connection with the off-farm income increase, the population migrating to urban area in outside Chungnam province equivalent to 10-12 thousand persons with age of 20-49 years should be taken into account politically to be employed in the projects in the province. 5. Surplus farm labors should be created by means of improvement of agricultural structure including large farm management with farm mechanization and job opportunities have also to be provided in connection with the rural special production area development projects. The two imminent subjects are the prerequisites to increase off-farm incomes for the farmers living in Chungnam province. 6. Required credit supports for investment and operation costs of the projects should be taken actions by the government.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.