• 제목/요약/키워드: Repair and Maintenance

검색결과 1,066건 처리시간 0.023초

보전비용요소를 고려한 정기보전정책의 비용분석모델 (Cost Analysis Model for Periodic Maintenance Policy with Maintenance Cost Factor)

  • 김재중;김원중
    • 산업경영시스템학회지
    • /
    • 제18권36호
    • /
    • pp.287-295
    • /
    • 1995
  • This paper is concerned with cost analysis model in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Mimimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a new item until tile periodic maintenance time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to scale parameter of failure distribution. Maintenance cost factors are included operating, fixed, minimal repair, periodic maintenance and new item replacement cost. Numerical example is shown in which failure time of system has weibull distribution.

  • PDF

응급수리를 고려한 정기보전정책의 비용분석 (Cost Analysis for Periodic Maintenance Policy with Minimal Repair)

  • 김재중;김원중
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구 (Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types)

  • 이강희;박근수;채창우
    • KIEAE Journal
    • /
    • 제12권5호
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

대학시설(大學施設)의 유지보수공사(維持補修工事) 발생요인(發生要因)과 비용분석(費用分析) 연구(硏究) (A Study on the Causes and Cost analysis of Maintenance and Repair work in the University Facilities)

  • 이규주;이수용
    • 교육시설
    • /
    • 제9권3호
    • /
    • pp.5-12
    • /
    • 2002
  • This study attempts to suggest a standard for maintenance and repair cost per each unit area, by analyzing the causes and cost of various maintenance and repair work in the university facilities. The result of my study on the data of maintenance and repair work for 12 years between 1990 and 2001 in the two campuses of the university that I selected for my case study is the following. (1) The yearly average for maintenance and repair cost in the facilities of the university with 67 old and new buildings for the past 12 years was $W4,422/m^2$. In addition, the repair cost based on the calculation of the degree of decrepitude of the buildings was $W10,291/m^2$. (2) The number of causes of maintenance and repair work increase steadily every year, due to the development of universities and changes in the educational environment. A special case like a university merger also appears, which also demands maintenance and repair work of university facilities. (3) It is important that a budget for interior maintenance is increased or added to an extent, in order to minimize the maintenance and repair cost of the university facilities, and to cope with changing educational environments flexibly. (4) The publication of a white paper that includes the planning of a building, construction process, and changes in design, seems to be required for the sake of users' convenience and efficient maintenance and repair work.

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • 제18권1호
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

A Corrective Maintenance Policy Which Determines Replacement or Repair for the Maintenance of System Failures

  • Jang, Jae-Jin;Lie, Chang-Hoon
    • 한국국방경영분석학회지
    • /
    • 제15권1호
    • /
    • pp.54-62
    • /
    • 1989
  • This paper presents a corrective maintenance model to determine either type of maintenance actions upon failure of the system. Types of maintenance actions considered are minimal repair and replacement. Minimal repair cost is assumed to be random, whereas replacement cost is fixed. A policy, B(t), which determines the type of maintenance action based on the estimated minimal repair cost when the system fails at time t is adopted. To obtain an optimal policy, an expected maintenance cost per unit time is derived and is minimized with respect to B(t).

  • PDF

정기보전 제도에서 응급수리를 고려한 대체품 수리정책에서의 비용분석 모델 (Cost Analysis Model with Minimal Repair of Spare Unit Repair Policy under Periodic Maintenance Policy)

  • 김재중
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제6권2호
    • /
    • pp.151-161
    • /
    • 2006
  • This article is concerned with cost analysis model in periodic maintenance policy. The repair policy is differently applied according as unit importance during an item being used and unit restoration during an item being failed. So in this paper the repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a spare unit until the periodic maintenance time arrived. Then total expected cost per unit time is calculated according to scale parameter of failure distribution in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and spare unit cost. Numerical example is shown in which failure time of item has Erlang distribution.

  • PDF

교각구조물의 유지보수 (Maintenance & Repairs of pier Structure)

  • 김규린
    • 기술사
    • /
    • 제34권1호
    • /
    • pp.35-43
    • /
    • 2001
  • This paper Is described for the maintenance and repair method for the pier structure currently under repair works in the Han river bridges. During the economic growth period from the year 1960 to 1980, our engineer was concentrated only for study of the construction method of bridge. We have neglected the importance for the maintenance & repair method of construction structure. Therefore this paper will give you some ideas of repair and maintenance method.

  • PDF

학교 BTL사업의 활성화를 위한 학교시설의 수선주기와 수선율 및 내용연수 산정에 관한 연구 -서울시내 초·중·고등학교를 중심으로- (A Study on Standard Repair Periods, Repair Rates of School Facilities for Revitalizing of the School BTL Project)

  • 하호성
    • 교육녹색환경연구
    • /
    • 제6권1호
    • /
    • pp.60-84
    • /
    • 2007
  • This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.

  • PDF

정기보전 제도에서 응급수리를 고려한 신제품 수리정책에서의 비용분석 모델 (Cost Analysis Model with Minimal Repair of New Unit Repair Policy under Periodic Maintenance Policy)

  • 김재중
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제6권3호
    • /
    • pp.195-203
    • /
    • 2006
  • This paper deals with cost analysis model in periodic maintenance policy. The repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a new unit before the periodic maintenance time comes. Then total expected cost per unit time is calculated according to time delta t in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and new unit expected cost. Numerical example is shown in which failure time of item has Normal distribution.

  • PDF