• Title/Summary/Keyword: Repair Cost

Search Result 693, Processing Time 0.037 seconds

Doctor shopping trend of patients before undergoing rotator cuff repair in Korea: a multicenter study

  • Jong-Ho Kim;Nam Su Cho;Jin-Young Park;Yon-Sik Yoo;Joo Han Oh;Kyu Cheol Noh;Yong-Beom Lee;Ho Min Lee;Jin-Young Bang;Jung Youn Kim;Hyeon Jang Jeong;Tae Kang Lim
    • Clinics in Shoulder and Elbow
    • /
    • 제27권3호
    • /
    • pp.338-344
    • /
    • 2024
  • Background: This study aims to investigate the trend of doctor shopping among patients with rotator cuff tear (RCT) before undergoing surgery and to examine the relevance of these findings to the public. Methods: A survey was conducted of 326 patients from 10 hospitals (male, 176; female, 150) who underwent arthroscopic rotator cuff repair (ARCR) for symptomatic RCT between September 2019 and February 2020. A questionnaire was used to obtain data regarding the type of medical care service, medical institutions visited before surgery, number of treatments received, and cost of treatment. Results: A total of 326 patients (87%) received treatment at least once at another medical institution before visiting the hospital where the surgery was performed. Patients visited an average of 9.4 health providers or physicians for shoulder pain before visiting the hospital where surgery was performed. Among the 326 patients, 148 (45%) visited more than two medical institutions and spent an average of 641,983 Korean won (KRW; $466, 50,000-5,000,000 KRW) before surgery. Medical expenses before surgery were proportional to the number of medical institutions visited (P=0.002), symptom duration (P=0.002), and initial visual analog scale (VAS) pain score (P=0.007) but were not associated with sex, age, VAS pain score immediately before surgery, or RCT size. Conclusions: Medical expense before ARCR was associated with the severity of preoperative pain and duration of symptoms. After onset of shoulder symptoms, patients should visit as soon as possible a hospital that has surgeons who specialize in shoulder repair to prevent unnecessary medical expense and proper treatment.

창호 유리의 단열필름 시공에 따른 생애주기비용 비교 분석 (A Comparative Analysis of Life Cycle Cost on the Window Glass and the Insulation Film Coated Glass for Window)

  • 정민구;김광희
    • 한국건축시공학회지
    • /
    • 제14권6호
    • /
    • pp.583-590
    • /
    • 2014
  • 본 연구에서는 경제적인 창호공사 방안을 확인하기 위해 단열필름이 시공된 창호유리와 일반유리의 생애주기비용을 분석하여 비교하고자 하였다. 이를 위해 Window 6.3과 ECO2-OD 시뮬레이션 프로그램을 사용하여 유리 유형별 창호의 열성능 데이터를 측정하고 사례 건물에 적용하여 냉 난방 유지비용 및 LCC를 산출하여 경제성을 비교하였다. 연구결과 단열필름을 추가적으로 시공함으로써, 냉 난방 유지비용 측면에서는 하절기 태양열이 실내로 투과하는 것을 막아 냉방비용 절감 효과가 있지만, 이로 인해 동절기에는 난방비용이 증가하는 것으로 나타났다. 생애주기비용 측면에서 볼 때, 냉방비용 절감 효과가 난방비용 증가량과 필름 시공 및 수선으로 발생하는 추가비용을 상쇄하지 못하기 때문에 단열필름의 시공은 적절한 방법이 아니라고 할 수 있다.

목표 신뢰도를 고려한 원-샷 시스템의 최적검사정책 (Optimal Inspection Policy for One-Shot Systems Considering Reliability Goal)

  • 정승우;정영배
    • 산업경영시스템학회지
    • /
    • 제40권4호
    • /
    • pp.96-104
    • /
    • 2017
  • A one-shot system (device) refers to a system that is stored for a long period of time and is then disposed of after a single mission because it is accompanied by a chemical reaction or physical destruction when it operates, such as shells, munitions in a defense weapon system and automobile airbags. Because these systems are primarily related with safety and life, it is required to maintain a high level of storage reliability. Storage reliability is the probability that the system will operate at a particular point in time after storage. Since the stored one-shot system can be confirmed only through inspection, periodic inspection and maintenance should be performed to maintain a high level of storage reliability. Since the one-shot system is characterized by a large loss in the event of a failure, it is necessary to determine an appropriate inspection period to maintain the storage reliability above the reliability goal. In this study, we propose an optimal inspection policy that minimizes the total cost while exceeding the reliability goal that the storage reliability is set in advance for the one-shot system in which periodic inspections are performed. We assume that the failure time is the Weibull distribution. And the cost model is presented considering the existing storage reliability model by Martinez and Kim et al. The cost components to be included in the cost model are the cost of inspection $c_1$, the cost of loss per unit time between failure and detection $c_2$, the cost of minimum repair of the detected breakdown of units $c_3$, and the overhaul cost $c_4$ of $R_s{\leq}R_g$. And in this paper, we will determine the optimal inspection policy to find the inspection period and number of tests that minimize the expected cost per unit time from the finite lifetime to the overhaul. Compare them through numerical examples.

중앙난방방식을 지역난방.소형열병합난방방식으로 전환시의 경제성 비교 분석 (Analysis for the Economic efficiency of District Heating and Gas Engine Co-generation System comparing with Central Heating System)

  • 김규생;이상혁;홍경표;원영재
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.459-465
    • /
    • 2007
  • This study was conducted to calculate the LCC of a apartment complex with a type of heating system, district heating and cogeneration system. For the purpose of analyzing LCC according to size of apartment complex, 500, 1,500 and 4,000 houses of model apartment selected. This research performs design of heating system and the life cycle cost analysis including an initial cost, energy cost, maintenance and operation cost, replacement cost and renovation cost during the project period(15years). According to the calculated results, 1) Initial cost of cogeneration system with 500, 1500 and 4000 houses is higher than district heating system each of 20%, 13%, 12%. 2) In case of cogeneration system, the payback period by electric generation is 5.21, 4.92 and 4.47 years and saving cost was calculated 29 billion won, 94 billion won and 262 billion won after payback period. 3) Cogeneration system LCC was 1.12, 1.07 and 1.06 times larger than district system with the size of apartment complex. According to the case of this study district heating system is more efficient than cogeneration system in terms of the reduction of LCC. 4) Gas Engine Co-generation System is more efficient than other systems because it can collect progressive part from electric charge progressive stage system. However, the efficiency is decreasing because of raising of fuel bills(LNG) and lowering of power rate for house use. Especially the engine is foreign-made so the cost of maintenance and repair is high and the technical expert is short. 5) District heating is also affected by fuel bills so we should improve energy efficiency through recovering of waste heat(incineration heat, etc.). Also, we should supply district cooling on the pattern of heat using of let the temperature high in winter and low in summer.

  • PDF

군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구 (Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project)

  • 박준호;송지훈
    • 한국산업융합학회 논문집
    • /
    • 제26권5호
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

운용환경을 고려한 항공오일시험장비의 최적정비주기 설정 (Optimal Maintenance Cycle for Aviation Oil Testing Equipment under the Consideration of Operational Environment)

  • 김인석;정원
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제16권3호
    • /
    • pp.224-230
    • /
    • 2016
  • Purpose: Military maintenance involves corrective and preventive actions carried out to keep a system in or restore it to a predetermined condition. This research develops an optimal maintenance cycle for aviation oil testing equipment with acceptable reliability level and minimum maintenance cost. Methods: The optimal maintenance policy in this research aims to satisfy the desired reliability level at the lowest cost. We assume that the failure process of equipment follows the power law non-homogeneous Poisson process model and the maintenance system is a minimal repair policy. Estimation and other statistical procedures (trend test and goodness of fit test) are given for this model. Results: With time varying failure rate, we developed reliability-based maintenance cost optimization model. This model will reduce the ownership cost through adopting a proactive reliability focused maintenance system. Conclusion: Based on the analysis, it is recommended to increase the current maintenance cycle by three times which is 0.5 year to 1.5 years. Because of the system's built-in self-checking features, it is not expected to have any problems of preventative maintenance cycle.

해상풍력발전단지의 전력망과 해상변전소 위치에 대한 최적 설계 (Optimal Design of Power Grid and Location of Offshore Substation for Offshore Wind Power Plant)

  • 문원식;원종남;허재선;조아라;김재철
    • 전기학회논문지
    • /
    • 제64권7호
    • /
    • pp.984-991
    • /
    • 2015
  • This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.

A Decision-Supporting Model for Rehabilitation of Old Water Distribution Systems

  • Kim, Joong-Hoon;Geem, Zong-Woo;Lee, Hyun-dong;Kim, Seong-Han
    • Korean Journal of Hydrosciences
    • /
    • 제8권
    • /
    • pp.31-40
    • /
    • 1997
  • Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this paper is to present a managerial decision-making model for the rehabilitation of water distribution systems with a mininum cost. The decisions made by the model also satisfy the requirements for discharge and pressure at demanding nodes in the systems. Replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break rate and the interest rate to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if discharge and pressure requirements are satisfied. In case the system does not satisfy the hydraulic requirements, the decision made for the optimal replacement time is revised until the requirments are satisfied. The model is well applied to an existing water distribution system, the Seoul Metropolitan Water Supply System (1st Phase). The results show that the decisions for the replacement time determined by the economic analysis are accepted as optimal and hydraulic integrity of the system is in good condition.

  • PDF

교좌장치 겸용 웨지잭을 이용한 교좌장치 보수공법 (Technique for Bridge Bearing Retrofit Using Wedge-Jack)

  • 백동명;유문식;임진석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 학회창립 10주년 기념 1999년도 가을 학술발표회 논문집
    • /
    • pp.837-843
    • /
    • 1999
  • A common hydraulic jack using brdige retrofit has a problem of increasing cost and time of construction to construct additionally temporary bent or concrete bracket, in case of insufficiency work space and release hydraulic pressure. To solve the problem, this technique is developed to alternate the bridge bearing in adequate inspection condition. After control maximum lift-height and minimum lift-force of no damage to super structure, the constructive technique is to alternate and repair the bridge bearing using the wedge jack with bridge bearing ability that is no release hydraulic pressure stopper, and able to reuse separable cylinder.

  • PDF

지하 콘크리트 구조물 외부 방수공법의 기술성 및 경제성에 관한 연구 (A Study on the Technology and Economic Feasibility of Surface Waterproofing System in Underground Concrete Structures.)

  • 임채중;배문옥
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.699-706
    • /
    • 2001
  • Waterproofing materials should be expected to last the life of the structure. An approximate life cycle cost should be to compare different materials based on initial and periodic repair / maintenance costs. Waterproofing applicators like materials that are easy to set up and clean up. The designer should choose a material that can be applied in almost all conditions. Design Professionals should specify independent inspection on critical jobs or in all cases where the budget permits. The basic causes of defection occurred during construction should be minimized.

  • PDF