DOI QR코드

DOI QR Code

Optimal Inspection Policy for One-Shot Systems Considering Reliability Goal

목표 신뢰도를 고려한 원-샷 시스템의 최적검사정책

  • Jeong, Seung-Woo (Department of Industrial and Management Engineering, Incheon National University) ;
  • Chung, Young-Bae (Department of Industrial and Management Engineering, Incheon National University)
  • 정승우 (인천대학교 산업경영공학과) ;
  • 정영배 (인천대학교 산업경영공학과)
  • Received : 2017.08.23
  • Accepted : 2017.10.10
  • Published : 2017.12.31

Abstract

A one-shot system (device) refers to a system that is stored for a long period of time and is then disposed of after a single mission because it is accompanied by a chemical reaction or physical destruction when it operates, such as shells, munitions in a defense weapon system and automobile airbags. Because these systems are primarily related with safety and life, it is required to maintain a high level of storage reliability. Storage reliability is the probability that the system will operate at a particular point in time after storage. Since the stored one-shot system can be confirmed only through inspection, periodic inspection and maintenance should be performed to maintain a high level of storage reliability. Since the one-shot system is characterized by a large loss in the event of a failure, it is necessary to determine an appropriate inspection period to maintain the storage reliability above the reliability goal. In this study, we propose an optimal inspection policy that minimizes the total cost while exceeding the reliability goal that the storage reliability is set in advance for the one-shot system in which periodic inspections are performed. We assume that the failure time is the Weibull distribution. And the cost model is presented considering the existing storage reliability model by Martinez and Kim et al. The cost components to be included in the cost model are the cost of inspection $c_1$, the cost of loss per unit time between failure and detection $c_2$, the cost of minimum repair of the detected breakdown of units $c_3$, and the overhaul cost $c_4$ of $R_s{\leq}R_g$. And in this paper, we will determine the optimal inspection policy to find the inspection period and number of tests that minimize the expected cost per unit time from the finite lifetime to the overhaul. Compare them through numerical examples.

Keywords

References

  1. Barlow, R.E. and Proschan, F., Mathematical Theory of reliability, Society for Industrial and Applied Mathematics, 1996.
  2. Cho, Y.S. and Lee, J.H., Optimal two-stage periodic inspection policy for maintaining storage reliability, Communications of the Korean Statistical Society, 2008, Vol. 15, No. 3, pp. 387-402.
  3. Chung, Y.B., Age replace policy for a system considering failure characteristic of components, Journal of the KSQC, 1993, Vol. 21, No. 2, pp. 109-120.
  4. Ito, K. and Nakagawa, T., Optimal inspection policies for a system in storage, Computers & Mathematics with Applications, 1992, Vol. 24, No. 1/2, pp. 87-90. https://doi.org/10.1016/0898-1221(92)90232-7
  5. Ito, K. and Nakagawa, T., An optimal inspection policy for a storage system with high reliability, Micro-electronics Reliability, 1995, Vol. 36, No. 6, pp. 875-882.
  6. Ito, K., Nakagawa, T., And Nishi, K., Extended optimal inspection policies for a system in Storage, Mathematical and Computer Modelling, 1995, Vol. 22, No. 10-12, pp. 83-87. https://doi.org/10.1016/0895-7177(95)00184-4
  7. Kim, D.I. and Jeon, G.W., A study on determining the periodic inspection for anti-ship missile by using reliability analysis model, Journal of the Military Operation Research Society of Korea, 2006, Vol. 32, No. 2, pp. 92-113.
  8. Kim, D.K., Kang, W.S., and Kang, S.J., A study on the storage reliability determination model for one-shot system, The Journal of The Korean Operations Research and Management Science Society, 2013, Vol. 38, No. 1, pp. 1-13. https://doi.org/10.7737/JKORMS.2013.38.1.001
  9. Kim, H.W. and Yun, W.Y., Reliability analysis for one-shot systems with periodic inspection, Journal of the Korean Institute of Industrial Engineers, 2016, Vol. 42, No. 1, pp. 20-29. https://doi.org/10.7232/JKIIE.2016.42.1.020
  10. Kim, Y.S. and Chung, Y.B., A Study on Reliability Prediction of Product with Dormant Phase, Journal of the Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, No. 3, pp. 173-179.
  11. Martinez, E.C., Storage reliability with periodic test, Reliability and maintainability symposium, 1984, pp. 181-185.
  12. Nakagawa, T., Maintenance theory of reliability 1st ed., Springer-Verlag, 2005.
  13. Pan, C.C. and Chu, L., Reliability assessment for oneshot product with weibull lifetime components, International Journal of Quality & Reliability Management, 2010, Vol. 27, No. 5, pp. 596-610. https://doi.org/10.1108/02656711011043553

Cited by

  1. 유도탄 점검주기 설정을 위한 고장 탐지율 산출 방안 및 적용 사례 vol.42, pp.2, 2017, https://doi.org/10.11627/jkise.2019.42.2.028