• Title/Summary/Keyword: Regression Analysis Method

Search Result 4,632, Processing Time 0.027 seconds

A Model Comparison Method for Hierarchical Loglinear Models

  • Hyun Jip Choi;Chong Sun Hong
    • Communications for Statistical Applications and Methods
    • /
    • v.3 no.3
    • /
    • pp.31-37
    • /
    • 1996
  • A hierarchical loglinear model comparison method is developed which is based on the well kmown partitioned likelihood ratio statistiss. For any paels, we can regard the difference of the geedness of fit statistics as the variation explained by a full model, and develop a partial test to compare a full model with a reduced model in that hierarchy. Note that this has similar arguments as that of the regression analysis.

  • PDF

Study on the Drawbead Expert Models (드로우비드 전문모델에 관한 연구)

  • 김준환
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2000.04a
    • /
    • pp.26-29
    • /
    • 2000
  • drawbead expert models are developed for calculating drawbead restraining force and drawbead-exit thinnings which are boundary conditions in FEM stamping simulation employing the linear multiple regression method by which the deviation of drawing characteristics between drawing test and mathematical model is minimized. In order to show the efficiency and accuracy of an expert drawbead model a finite element simulation of auto-body panel stamping is carried out. The finite element simulation shows that the expert drawbead model provides the accurate solution guarantees the stable convergence and the merit in the computation time.

  • PDF

A Study on The Optimization Method of The Initial Weights in Single Layer Perceptron

  • Cho, Yong-Jun;Lee, Yong-Goo
    • Journal of the Korean Data and Information Science Society
    • /
    • v.15 no.2
    • /
    • pp.331-337
    • /
    • 2004
  • In the analysis of massive volume data, a neural network model is a useful tool. To implement the Neural network model, it is important to select initial value. Since the initial values are generally used as random value in the neural network, the convergent performance and the prediction rate of model are not stable. To overcome the drawback a possible method use samples randomly selected from the whole data set. That is, coefficients estimated by logistic regression based on the samples are the initial values.

  • PDF

Choice method of Competitive Power Key Factors based on Reliability (신뢰성기반 제품경쟁력 결정요인 선정방안)

  • Kim Jong-Gurl;Bin Sung-Uk
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.259-267
    • /
    • 2004
  • Enterprise must establish a properly competitive strategy according to environmental changes and international competitions. It is necessary to develop the strategy of competitive power for an efficient operation as well as system, industry, product and price competitions. This paper aims to propose a choice method of Competitive Power Key Factors which can be applied to unit parts and finished products, construction products, soft wear products based on Reliability.

  • PDF

Numerical Design Approach to Determining the Dimension of Large-Scale Underground Mine Structures (대규모 지하 광산 구조물의 규모 결정을 위한 수치해석적 설계 접근)

  • Lee, Yun-Su;Park, Do-Hyun;SunWoo, Choon;Kim, Gyo-Won;Kang, Jung-Seok
    • Tunnel and Underground Space
    • /
    • v.22 no.2
    • /
    • pp.120-129
    • /
    • 2012
  • Recently, mining facilities have being installed in an underground space according to a social demand for environment-friendly mine development. The underground structures for mining facilities usually requires a large volume of space with width greater than height, and thus the stability assessment of the large-scale underground mine structure is an important issue. In this study, we analysed a factor of safety based on strength reduction method, and proposed a numerical design approach to determining the dimension of underground mine structures in combination with a strength reduction method and a multivariate regression analysis. Input design parameters considered in the present study were the stress ratio and shear strength of rock mass, and the width and cover depth of underground mine structures. The stabilities of underground mine structures were assessed in terms of factor of safety under different conditions of the above input parameters. It was calculated by the strength reduction method, and several kinds of fit functions were obtained through various multivariate regression analyses. Using a best-fit regression model, we proposed the charts which provide preliminary design information on the dimension of underground mine structures.

Application of Multi-Layer Perceptron and Random Forest Method for Cylinder Plate Forming (Multi-Layer Perceptron과 Random Forest를 이용한 실린더 판재의 성형 조건 예측)

  • Kim, Seong-Kyeom;Hwang, Se-Yun;Lee, Jang-Hyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.57 no.5
    • /
    • pp.297-304
    • /
    • 2020
  • In this study, the prediction method was reviewed to process a cylindrical plate forming using machine learning as a data-driven approach by roll bending equipment. The calculation of the forming variables was based on the analysis using the mechanical relationship between the material properties and the roll bending machine in the bending process. Then, by applying the finite element analysis method, the accuracy of the deformation prediction model was reviewed, and a large number data set was created to apply to machine learning using the finite element analysis model for deformation prediction. As a result of the application of the machine learning model, it was confirmed that the calculation is slightly higher than the linear regression method. Applicable results were confirmed through the machine learning method.

Comparison of Customer Satisfaction Indices Using Different Methods of Weight Calculation (가중치 산출방법에 따른 고객만족도지수의 비교)

  • Lee, Sang-Jun;Kim, Yong-Tae;Kim, Seong-Yoon
    • Journal of Digital Convergence
    • /
    • v.11 no.12
    • /
    • pp.201-211
    • /
    • 2013
  • This study compares Customer Satisfaction Index(CSI) and the weight for each dimension by applying various methods of weight calculation and attempts to suggest some implications. For the purpose, the study classified the methods of weight calculation into the subjective method and the statistical method. Constant sum scale was used for the subjective method, and the statistical method was again segmented into correlation analysis, principal component analysis, factor analysis, structural equation model. The findings showed that there is difference between the weights from the subjective method and the statistical method. The order of the weights by the analysis methods were classified with similar patterns. Besides, the weight for each dimension by different methods of weight calculation showed considerable deviation and revealed the difference of discrimination and stability among the dimensions. Lastly, the CSI calculated by various methods of weight calculation showed to be the highest in structural equation model, followed by in the order of regression analysis, correlation analysis, arithmetic mean, principal component analysis, constant sum scale and factor analysis. The CSI calculated by each method showed to have statistically significant difference.

The Spatial Electric Load Forecasting Algorithm using the Multiple Regression Analysis Method (다중회귀분석법을 이용한 지역전력수요예측 알고리즘)

  • Nam, Bong-Woo;Song, Kyung-Bin;Kim, Kyu-Ho;Cha, Jun-Min
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.2
    • /
    • pp.63-70
    • /
    • 2008
  • This paper resents the spatial electric load forecasting algorithm using the multiple regression analysis method which is enhanced from the algorithm of the DISPLAN(Distribution Information System PLAN). In order to improve the accuracy of the spatial electrical load forecasting, input variables are selected for GRDP(Gross Regional Domestic Product), the local population and the electrical load sales of the past year. Tests are performed to analyze the accuracy of the proposed method for Gyeong-San City, Gu-Mi City, Gim-Cheon City and Yeong-Ju City of North Gyeongsang Province. Test results show that the overall accuracy of the proposed method is improved the percentage error 11.2[%] over 12[%] of the DISPLAN. Specially, the accuracy is enhanced a lot in the case of high variability of input variables. The proposed method will be used to forecast local electric loads for the optimal investment of distribution systems.

A Study on the Prediction of Surface Settlement Applying Umbrella Arch Method to Tunnelling (Umbrella arch 공법의 적용에 따른 횡방향 지표침하량 예측에 관한 연구)

  • 김선홍;문현구
    • Tunnel and Underground Space
    • /
    • v.12 no.4
    • /
    • pp.259-267
    • /
    • 2002
  • Recently, Umbrella Arch Method(UAM) is commonly used in order to enhance the stability of tunnel itself and stabilize the adjacent surface structure. But quantitative estimation of reinforcement effect is needed because UAM is designed and constructed only on the basis of empirical experience. By using 3-dimensional finite element method, parametric study is performed for elastic modulus of ground and overburden, and reinforcement effect is analyzed quantitatively. From the results, surface settlement decreases about 9%∼27% in soil tunnel, about 4%∼24% in weathered rock tunnel and 4%∼17% in soft rock tunnel when applied with UAM. The prediction equation for final surface settlement is suggested through regression analysis and the equation is expressed as exponential function which has variable Smax, unknown coefficient i and k.

Estimating of Optimal Allowed Distance for Reducing Vibration and Noise Problems by Pile Driving after Drilling Method in Deep Foundation Work (천공 후 말뚝타격공법의 진동 $\cdot$ 소음 문제 해소를 위한 적정 이격거리 산정 방안 연구)

  • Park Hong-Tae;Kang Lee-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.152-163
    • /
    • 2005
  • Pile driving work causes a vibration problem in the construction site using pile foundation and often causes civil affairs by construction noise around the construction site. For the vibration and noise problems, the driving after drilling method rather than the direct driving method is being generalized for reducing vibration and noise. However, this method also causes civil affairs when the driving work is operated in adjacent area. This study suggests a criterion for evaluating an optimal allowed distance for pile driving work by the driving after drilling method. Actual surveys of vibration and noise for pile driving work in seven construction sites were used for developing regression analysis equations. The results can be a standard to estimate the allowed distance to avoid vibration and noise problems in pile driving work for deep foundation.