최근 코로나19의 영향으로 외식과 오프라인 쇼핑이 줄고 배달음식과 온라인 쇼핑이 늘어나면서 플라스틱 폐기물에 대한 우려가 커지고 있다. 위생 문제로 일회용 플라스틱 사용량이 늘어나는 것은 물론, 배송을 위한 플라스틱 포장 사용량 역시 더욱 늘어날 것으로 보이기 때문이다. 이처럼 우리는 포스트 코로나시대에도 플라스틱 없이는 살 수가 없다. 그렇다면 플라스틱은 환경문제의 주범이라는 오명을 벗기 위해서는 무엇을 해야 하는가? 우리나라 플라스틱 산업의 산증인이자 업계 최고의 전문가인 민남규 제이케이머티리얼즈(주)/자강그룹 회장을 만나 플라스틱 폐기물 문제에 대한 해결 방안을 들어보았다.
This research project is a program promoted to seek diversification of domestic radioactive waste analysis institutions, and seeks public development, win-win cooperation, and cooperation between the entrusted institution and the entrusted institution. Accordingly, the entrusted institution established a standard analysis procedure for establishing a quality control system for radioactivity analysis, establishing a radiation control zone, obtaining KOLAS accreditation, and performing proficiency tests, which are the performance ranges requested by the entrusted institution, and intersecting the radioactive isotope waste generated at the actual site. Verification was performed to confirm the analysis quality. In addition, facilities and equipment for radioactivity analysis were supplemented and expanded, and the basic technology foundation and technical skills were secured through securing professional technicians and education/training. It is judged that the entrusted institution will contribute to securing radiation safety through the smooth execution of treatment, disposal, and transportation through value creation and analysis of radioactive waste generated by radioactive isotope-using institutions (research institutes, hospitals, industries, etc.) by succeeding in this research project do.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.14
no.3
/
pp.279-287
/
2016
Korea Radioactive Waste Agency (KORAD) began to operate the low and intermediate level radioactive waste disposal facility in Gyeongju and to transport the radioactive waste containing radioactive isotopes from Daejeon to the disposal facility for the first time at 2015. For this radioactive waste transportation, in this study, radiological impact assessment is carried out for workers and public. The dose rate to workers and public during the transportation is estimated with consideration of the transportation scenarios and is compared with the Korean regulatory limit. The sensitivity analysis is carried out by considering both the variation of release ratios of the radioactive isotopes from the waste and the variation of the distances between the radioactive waste drum and worker during loading and unloading of radioactive waste. As for all the transportation scenarios, radiological impacts for workers and public have met the regulatory limits.
In this paper, the writer attempts to clarify causes by general man and weather factor on forest fire occurrence in Kosong-Area, 1995-2001. The major results are summarized as follows: The forest fire at Kojin-ri, Sonyusil-ri and Majwa-ri occurred at the same area over 3 times and that Hakya-ri, Songdae-ri and Inhung-ri, at the adjoining land over 3times. In the total 46 times of forest fire, fire frequence was greatest in March(11 time) and April(11 time) followed by November(7 time), January(6 time), February(6 time). December(3 time), October(2 time). Hours on frequent forest fire are from 11:00 till 18:00. Number for forest fire occurrence by causes was greatest in military training followed by burning paddy fields, debris burning, burning agricultural debris, visiting a grave, cigarette and arson. Frequent forest fire in Kosong-Area coincide not only with above normal temperatures, but also with below normal relative humidity. When the strong winds appear at Kosong-Area, the properties of daily surface chart re the south high and north low pressure pattern in the Far East Asia.
Proceedings of the Korean Radioactive Waste Society Conference
/
2004.02a
/
pp.96-105
/
2004
The decommissioning project of the KRR 1 & 2 was started in January 1997. The actual decommissioning activity was started at the RI production facility and was finished at the end of 2002. The dismantling works of all components including the reactor structure of the KRR-2 was started in January, 2003 and will be carried out for 2 years till the end of 2004. The project schedule is estimated to delay for 4∼5 months beyond the original plan because of delaying on the cutting of thermal column nose and removal of the graphite bricks, but it may be caught up during the removal working of concrete from biological shielding structure. This paper summarizes the general status of the KRR 1 & 2 and decommissioning activities.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.11
no.2
/
pp.103-114
/
2013
The Korea Atomic Energy Research Institute has developed a performance assessment model implementing the A-KRS concept, which was constructed with the GoldSim. In the A-KRS concept, spent nuclear fuel produced from pressurized-water-reactor operations would be pyroprocessed to reduce waste volume and radioactivity. The wastes to be disposed of in a geologic repository are comprised of metal and ceramic waste forms. In this study, results of simulations conducted to establish credibility and build confidence for the A-KRS model are presented. Specifically, release rates and breakthrough times simulated using the A-KRS model were compared to corresponding results from the U.S. NRC SOAR model. In addition, the A-KRS model results were compared to published release rates from the SKB repository performance assessment. This comparison of the A-KRS model results to other independent performance assessments is expected to form part of a suite of model verification and validation activities to provide confidence that the A-KRS model has been implemented appropriately.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.12
no.1
/
pp.79-88
/
2014
We have developed a smart decontamination device for small-size radioactive scrap metal (SSRSM) necessarily generated from nuclear facilities. This is a multi-modal device such as rotation of magnetic field focusing on the region containing the abrasion pins placed around target and ultrasonic cleaner. Additionally, in order to increase the decontamination efficiency we have modified some configuration of the device so that it could work on them evenly and totally. With the Optimal operating for operation of the new device, we tried to decontaminate some various metal selected as a sample during 15 minutes sequentially using each method, magnetic and ultrasonic device. As a result, the range of decontamination factor has been highly increased to 18~56. After decontamination, all samples were found its activity less than background level.
The analysis of radiological protection at Kori Nuclear Unit #1, which started commercial operation on April 29, 1978, has been carried out in three areas, namely, radiation exposure, radioactive waste disposal and environmental management. The analysis results for radiation exposure and radioactive effluent releases appear to increase gradually with plant operating years. On the other hand, the apex of radiation exposure and radioactive effluent releases was in 1983 and 1982 respectively and then decreased or stabilized. Also, the operation environmental radioactivity seems to be no higher than preoperation environmental radioactivity.
Wan-Bae Kim;Woo-Seok Choi;Gyu-Seok Lim;Vladislav E. Ri;Soo-Haeng Cho;Suk-Cheol Kwon;Hayk Nersisyan;Jong-Hyeon Lee
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.21
no.1
/
pp.9-22
/
2023
Spin-off pyroprocessing technology and inert anode materials to replace the conventional carbon-based smelting process for critical materials were introduced. Efforts to select inert anode materials through numerical analysis and selected experimental results were devised for the high-throughput reduction of oxide feedstocks. The electrochemical properties of the inert anode material were evaluated, and stable electrolysis behavior and CaCu generation were observed during molten salt recycling. Thereafter, CuTi was prepared by reacting rutile (TiO2) with CaCu in a Ti crucible. The formation of CuTi was confirmed when the concentration of CaO in the molten salt was controlled at 7.5mol%. A laboratory-scale electrorefining study was conducted using CuTi(Zr, Hf) alloys as the anodes, with a Ti electrodeposit conforming to the ASTM B299 standard recovered using a pilot-scale electrorefining device.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.