• 제목/요약/키워드: Project-based

Search Result 7,078, Processing Time 0.037 seconds

Monitoring Vegetation Structure Changes in Urban Wetlands (도시 내 습지의 식생구조 변화 모니터링)

  • Kim, Na-Yeong;Nam, Jong-Min;Lee, Gyeong-Yeon;Lee, Kun-Ho;Song, Young-Keun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.6
    • /
    • pp.135-154
    • /
    • 2023
  • Urban wetlands provide various ecosystem services and are subject to restoration and creation projects due to their increased value in the context of climate change. However, the vegetation structure of wetlands is sensitive to environmental changes, including artificial disturbances, and requires continuous maintenance. In this study, we conducted a vegetation survey of three wetlands created as part of a project to restore urban degraded natural ecosystems and monitored the quantitative changes in wetland vegetation structure using an unmanned aerial vehicle. The vegetation survey revealed 73 species in Incheon Yeonhui wetland, and the change in vegetation composition based on wetland occurrence frequency was 11.5% on average compared to the 2018 vegetation survey results. The vegetation survey identified 44 species in Busan Igidae wetland, and the proportion of species classified as obligate upland plants was the highest at 48.8% among all plants, while the proportion of naturalized plants accounted for 15.9% of all plants. The open water surface area decreased from 10% in May 2019 to 6.7% in May 2020. Iksan Sorasan wetland was surveyed and 44 species were confirmed, and it was found that the proportion of facultative wetland plant decreased compared to the 2018 vegetation survey results, and the open water surface area increased from 0.4% in May 2019 to 4.1% in May 2020. The results of this study showed that wetlands with low artificial management intensity exhibited a tendency for stabilization of vegetation structure, with a decrease in the proportion of plants with high wetland occurrence frequency and a relatively small number of new species. Wetlands with high artificial management intensity required specific management, as they had a large change in vegetation structure and a partially high possibility of new invasion. We reaffirmed the importance of continuous monitoring of vegetation communities and infrastructure for wetlands considering the function and use of urban wetlands, and restoration stages. These research results suggest the need to establish a sustainable wetland maintenance system through the establishment of long-term maintenance goals and monitoring methods that consider the environmental conditions and vegetation composition of wetlands.

Analysis of biodiversity change trend on urban development project - Focusing on terrestrial species in Environmental Impact Assessment - (도시의 개발 사업에 따른 생물다양성 변화 추세 분석 - 환경영향평가의 육상 동물종을 중심으로 -)

  • Kim, Eun-Sub;Lee, Dong-Kun;Jeon, Yoon-Ho;Choi, Ji-Young;Kim, Shin-Woo;Hwang, Hye-Mi;Kim, Da-Seul;Moon, Hyun-Bin;Bae, Ji-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.6
    • /
    • pp.21-32
    • /
    • 2023
  • The Environmental Impact Assessment (EIA) plays a pivotal role in predicting the potential environmental impacts of proposed developments and planning appropriate mitigation measures to minimize effects on species. However, as concerns over biodiversity loss rise, there's ongoing debate about the efficacy of these mitigation plans. In this study, we utilized data from EIAs and post-environmental impact surveys to understand the trends in biodiversity during construction and operation phases. By examining 30 urban development projects, we categorized species richness indices of mammals, birds, amphibians, and reptiles into pre-construction, during construction, and post-construction operational stages. The biodiversity trends were analyzed based on the rate of change in these indices. The results revealed three distinct biodiversity change patterns: (A) An initial increase in biodiversity indices post-development, followed by a gradual decline over time; (B) a sustained increase in biodiversity as a result of mitigation measures; and (C) a continuous decline in biodiversity post-development. Furthermore, all species exhibited a higher rate of biodiversity decline during the construction phase compared to the operational phase, with mammals showing the most significant rate of change. Notably, the biodiversity change rate during operation was generally lower than during construction. In particular, mammals seemed to be most influenced by mitigation measures, displaying the smallest rate of change. This study provides empirical evidence on the efficacy of mitigation measures and deliberates on ways to enhance their effectiveness in minimizing the adverse impacts of urban development on biodiversity. These findings can serve as foundational data for addressing terrestrial biodiversity reduction.

A Case Study on Minimizing Contract Amount Adjustments due to Design Changes in Defense and Military Facility Projects (국방·군사시설 사업의 설계변경 계약금액조정 최소화를 위한 사례연구)

  • Cho, Sung-joon;Lee, Kyoung-han;Lee, Myung-sik;Park, Bong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.34-44
    • /
    • 2024
  • In defense and military facility projects, adjustments to contract amounts due to design changes directly or indirectly affect factors such as increased construction costs and extended construction periods. Moreover, they can lead to differences of opinion and conflicts between the military and contracting parties. This case study analyzed the integrated management of defense and military facility projects by the Gyeonggi Southern Facilities Division, which oversees projects in Seoul and the southern Gyeonggi Province region for the Army, Navy, Marine Corps, and Air Force. Out of 388 completed projects, 103 cases with design changes were selected for analysis, aiming to ensure the reliability of data regarding the proportion of design changes in project completion. The study classified samples by the causes of design changes specified in the Ministry of Planning and Finance's contract regulations, assigning rankings based on the occurrence rates of each cause. Furthermore, it analyzed detailed factors for each cause of design change and derived implications to propose improvement measures. Considering the limited access to military primary data, this case study is expected to contribute to minimizing design changes in defense and military facility projects. Additionally, it is anticipated to be practically useful for subsequent research on contract amount adjustments resulting from design changes.

A Study on Christian Liberal Arts to Cultivate Religious Literacy (종교 리터러시를 함양하는 기독교 교양교육 연구)

  • Miyoung Cho
    • Journal of Christian Education in Korea
    • /
    • v.76
    • /
    • pp.149-172
    • /
    • 2023
  • Purpose of study: The purpose of this study is to explore the direction of the role of Christian liberal arts education in university liberal arts education in the 21st century. Research content and method: It examines how liberal arts education has changed with the times, and examines the modern significance of the role of liberal arts education that is requested today. In the rapidly changing reality of the 21st century, the role of liberal arts education, which was neglected by focusing on major-centered professional education, has become important. The need for creative and integrated thinking skills to create and apply new knowledge on their own has been highlighted. Liberal arts education and Christianity have a common denominator, and they can produce richer fruits through mutual communication. Religious literacy is the ability to identify and analyze the fundamental intersection between religion and social, political, and cultural life through various lenses. It can be said that it is the culture that must be equipped as a democratic citizen living in the 21st century. Understanding religion is the most important humanities and culture. Through the cultivation of religious literacy, it will be possible to develop thinking skills and insights to view the relationship between Christianity and various fields of life as a whole. Conclusions and Suggestions: Through this study, the need for religious literacy was expressed, and the direction of Christian liberal arts education requested in this era was sought. Christian liberal arts education that fosters religious literacy is proposed as a way to handle the role of a holistic leader of public society by aiming for convergent thinking and promoting public responsibility.

Analysis of carbon emission reduction effect due to electricity conversion of container port's CHE (컨테이너 항만 하역장비의 친환경 전환에 따른 탄소 배출저감 효과 분석)

  • Ahn, Yong Sung;Lee, Hyang-Sook;Lee, Ji-Won
    • Journal of Korea Port Economic Association
    • /
    • v.40 no.2
    • /
    • pp.39-52
    • /
    • 2024
  • As the 'Eco-friendly conversion project for Port's CHE(Cargo handling Equipment) ' which has started in 2014 ends in 2024, in addition to the existing 'Low pollution' paradigm to respond to fine dust problems, a full-fledged 'Zero-emission' conversion is to be required to implement 2050 carbon neutrality at the port level. Accordingly, this study calculated the future replacement demand for container handling equipments at the four major domestic ports(Busan, Incheon, Yeosu Gwangyang, and Ulsan), and assumed a scenario where every CHE supposed to eb replaced is electrified inturn every year. And then the resulting future emission reduction effect accordingly was calculated and analyzed. In particular, compared and analyzed the emission outlook applying the life-cycle concept(LCA), which is being adopted as a new emission calculation standard in most industrial fields, and the existing emission calculation concept that only considers direct emissions within the port, to provide more effective implications for the promotion of follow-up conversion projects. According to the analysis results, if the CHE is replaced according to the proposed schedule, it is expected that the existing emissions can be reduced by 79% compared to BAU in 2025 and 97.4% in 2030. However, if the LCA is applied, it is expected to be reduced by only 27.6% by 2030. This suggests that port's CHE must be converted to zero emissions and at the same time establish an Ports' self-sufficient energy grid based on renewable energy.

Understanding the Mismatch between ERP and Organizational Information Needs and Its Responses: A Study based on Organizational Memory Theory (조직의 정보 니즈와 ERP 기능과의 불일치 및 그 대응책에 대한 이해: 조직 메모리 이론을 바탕으로)

  • Jeong, Seung-Ryul;Bae, Uk-Ho
    • Asia pacific journal of information systems
    • /
    • v.22 no.2
    • /
    • pp.21-38
    • /
    • 2012
  • Until recently, successful implementation of ERP systems has been a popular topic among ERP researchers, who have attempted to identify its various contributing factors. None of these efforts, however, explicitly recognize the need to identify disparities that can exist between organizational information requirements and ERP systems. Since ERP systems are in fact "packages" -that is, software programs developed by independent software vendors for sale to organizations that use them-they are designed to meet the general needs of numerous organizations, rather than the unique needs of a particular organization, as is the case with custom-developed software. By adopting standard packages, organizations can substantially reduce many of the potential implementation risks commonly associated with custom-developed software. However, it is also true that the nature of the package itself could be a risk factor as the features and functions of the ERP systems may not completely comply with a particular organization's informational requirements. In this study, based on the organizational memory mismatch perspective that was derived from organizational memory theory and cognitive dissonance theory, we define the nature of disparities, which we call "mismatches," and propose that the mismatch between organizational information requirements and ERP systems is one of the primary determinants in the successful implementation of ERP systems. Furthermore, we suggest that customization efforts as a coping strategy for mismatches can play a significant role in increasing the possibilities of success. In order to examine the contention we propose in this study, we employed a survey-based field study of ERP project team members, resulting in a total of 77 responses. The results of this study show that, as anticipated from the organizational memory mismatch perspective, the mismatch between organizational information requirements and ERP systems makes a significantly negative impact on the implementation success of ERP systems. This finding confirms our hypothesis that the more mismatch there is, the more difficult successful ERP implementation is, and thus requires more attention to be drawn to mismatch as a major failure source in ERP implementation. This study also found that as a coping strategy on mismatch, the effects of customization are significant. In other words, utilizing the appropriate customization method could lead to the implementation success of ERP systems. This is somewhat interesting because it runs counter to the argument of some literature and ERP vendors that minimized customization (or even the lack thereof) is required for successful ERP implementation. In many ERP projects, there is a tendency among ERP developers to adopt default ERP functions without any customization, adhering to the slogan of "the introduction of best practices." However, this study asserts that we cannot expect successful implementation if we don't attempt to customize ERP systems when mismatches exist. For a more detailed analysis, we identified three types of mismatches-Non-ERP, Non-Procedure, and Hybrid. Among these, only Non-ERP mismatches (a situation in which ERP systems cannot support the existing information needs that are currently fulfilled) were found to have a direct influence on the implementation of ERP systems. Neither Non-Procedure nor Hybrid mismatches were found to have significant impact in the ERP context. These findings provide meaningful insights since they could serve as the basis for discussing how the ERP implementation process should be defined and what activities should be included in the implementation process. They show that ERP developers may not want to include organizational (or business processes) changes in the implementation process, suggesting that doing so could lead to failed implementation. And in fact, this suggestion eventually turned out to be true when we found that the application of process customization led to higher possibilities of failure. From these discussions, we are convinced that Non-ERP is the only type of mismatch we need to focus on during the implementation process, implying that organizational changes must be made before, rather than during, the implementation process. Finally, this study found that among the various customization approaches, bolt-on development methods in particular seemed to have significantly positive effects. Interestingly again, this finding is not in the same line of thought as that of the vendors in the ERP industry. The vendors' recommendations are to apply as many best practices as possible, thereby resulting in the minimization of customization and utilization of bolt-on development methods. They particularly advise against changing the source code and rather recommend employing, when necessary, the method of programming additional software code using the computer language of the vendor. As previously stated, however, our study found active customization, especially bolt-on development methods, to have positive effects on ERP, and found source code changes in particular to have the most significant effects. Moreover, our study found programming additional software to be ineffective, suggesting there is much difference between ERP developers and vendors in viewpoints and strategies toward ERP customization. In summary, mismatches are inherent in the ERP implementation context and play an important role in determining its success. Considering the significance of mismatches, this study proposes a new model for successful ERP implementation, developed from the organizational memory mismatch perspective, and provides many insights by empirically confirming the model's usefulness.

  • PDF

Evaluation of Site-specific Potential for Rice Production in Korea under the Changing Climate (지구온난화에 따른 우리나라 벼농사지대의 생산성 재평가)

  • Chung, U-Ran;Cho, Kyung-Sook;Lee, Byun-Woo
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.8 no.4
    • /
    • pp.229-241
    • /
    • 2006
  • Global air temperature has risen by $0.6^{\circ}C$ over the last one hundred years due to increased atmospheric greenhouse gases. Moreover, this global warming trend is projected to continue in the future. This study was carried out to evaluate spatial variations in rice production areas by simulating rice-growth and development with projected high resolution climate data in Korea far 2011-2100, which was geospatially interpolated from the 25 km gridded data based on the IPCC SRES A2 emission scenario. Satellite remote sensing data were used to pinpoint the rice-growing areas, and corresponding climate data were aggregated to represent the official 'crop reporting county'. For the simulation experiment, we used a CERES-Rice model modified by introducing two equations to calculate the leaf appearance rate based on the effective temperature and existing leaf number and the final number of leaves based on day-length in the photoperiod sensitive phase of rice. We tested the performance of this model using data-sets obtained from transplanting dates and nitrogen fertilization rates experiments over three years (2002 to 2004). The simulation results showed a good performance of this model in heading date prediction [$R^2$=0.9586 for early (Odaebyeo), $R^2$=0.9681 for medium (Hwasungbyeo), and $R^2$=0.9477 for late (Dongjinbyeo) maturity cultivars]. A modified version of CERES-Rice was used to simulate the growth and development of three Japonica varieties, representing early, medium, and late maturity classes, to project crop status for climatological normal years between 2011 and 2100. In order to compare the temporal changes, three sets of data representing 3 climatological years (2011-2040, 2041-2070, and 2071-2100) were successively used to run the model. Simulated growth and yield data of the three Japonica cultivars under the observed climate for 1971-2000 was set as a reference. Compared with the current normal, heading date was accelerated by 7 days for 2011-2040 and 20 days for 2071-2100. Physiological maturity was accelerated by 15 days for 2011-2040 and 30 days for 2071-2100. Rice yield was in general reduced by 6-25%, 3-26%, and 3-25% per 10a in early, medium, and late maturity classes, respectively. However, mid to late maturing varieties showed an increased yield in northern Gyeonggi Province and in most of Kwangwon Province in 2071-2100.

Effective Management of Invasive Nutria (Myocastor coypus) in the UK and the USA (영국과 미국에서 침입성 뉴트리아 (Myocastor coypus)의 효과적 관리)

  • Kil, Jihyon;Lee, Do-hun;Kim, Young-chae
    • Ecology and Resilient Infrastructure
    • /
    • v.2 no.4
    • /
    • pp.265-273
    • /
    • 2015
  • It is the better to take preventative measures against the natural intrusion in advance from invasive alien species that reduce biodiversity and cause economic loss to humans. If the prevention of intrusion and spread fails, we need to make active control and eradication. This study aims to introduce nutria (Myocastor coypus) control cases performed in the United Kingdom and the United States and to provide information for the contribution of nutria management measure improvements. The nutria eradication campaign in the United Kingdom was developed as a long-term plan based on sufficient understanding on the management target and objective and suitable support. Sufficient information on nutria was accumulated and the management strategy was flexibly modified according to the changes in management that were proactively reflected in the field. Regarding the eradication project at Chesapeake Bay in the United States, based on long-term ecological information, more advanced capture technology than in the United Kingdom were introduced and the eradication plan, strategy and implementation were configured by analyzing the strengths and weaknesses of the eradication campaign in the United Kingdom. The successful cases in the United Kingdom and the United State provide an information on how to improv the nutria management measure. For the eradication of nutria, it is necessary to reach a consensus between stakeholders and to form a consultative group between related organizations for periodic communication. Opinions on the field must be actively accepted in the consultation process for strategy and policy decision, and the eradication plan needs to be developed based on a management index. The eradication plan is required to be managed, evaluated and adjusted in a systematic way. Scientific management must be introduced and the management performance must be evaluated objectively so that a practical plan can be flexibly adjusted. It is also required to secure a long-term budget support and a stable organization and to input a concentrated budget at the proper period when there is high efficiency of eradication.

정지궤도 통신해양기상위성의 기상분야 요구사항에 관하여

  • Ahn, Myung-Hwan;Kim, Kum-Lan
    • Atmosphere
    • /
    • v.12 no.4
    • /
    • pp.20-42
    • /
    • 2002
  • Based on the "Mid to Long Term Plan for Space Development", a project to launch COMeS (Communication, Oceanography, and Meteorological Satellite) into the geostationary orbit is undergoing. Accordingly, KMA (Korea Meteorological Administration) has defined the meteorological missions and prepared the user requirements to fulfill the missions. To make a realistic user requirements, we prepared a first draft based on the ideal meteorological products derivable from a geostationary platform and sent the RFI (request for information) to the sensor manufacturers. Based on the responses to the RFI and other considerations, we revised the user requirement to be a realistic plan for the 2008 launch of the satellite. This manuscript introduces the revised user requirements briefly. The major mission defined in the revised user requirement is the augmentation of the detection and prediction ability of the severe weather phenomena, especially around the Korean Peninsula. The required payload is an enhanced Imager, which includes the major observation channels of the current geostationary sounder. To derive the required meteorological products from the Imager, at least 12 channels are required with the optimum of 16 channels. The minimum 12 channels are 6 wavelength bands used for current geostationary satellite, and additional channels in two visible bands, a near infrared band, two water vapor bands and one ozone absorption band. From these enhanced channel observation, we are going to derive and utilize the information of water vapor, stability index, wind field, and analysis of special weather phenomena such as the yellow sand event in addition to the standard derived products from the current geostationary Imager data. For a better temporal coverage, the Imager is required to acquire the full disk data within 15 minutes and to have the rapid scan mode for the limited area coverage. The required thresholds of spatial resolutions are 1 km and 2 km for visible and infrared channels, respectively, while the target resolutions are 0.5 km and 1 km.

A Study on How to Cope with the Abusive Call on On-demand Bonds (독립적 보증과 그 부당한 청구에 대한 대응방안 연구)

  • KIM, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.69
    • /
    • pp.261-301
    • /
    • 2016
  • Recently the abusive calls on on-demand bonds have been a critical issue among many engineering and construction companies in Korea. On-demand bond is referred to as an independent guarantee in the sense that the guarantee is independent from its underlying contract although it was issued based on such underlying contract. For this reason, the issuing bank is not required to and/or entitled to look into whether there really is a breach of underlying contract in relation to the call on demand-bonds. Due to this kind of principle of independence, the applicant has to run the risk of the on demand bond being called by the beneficiary without due grounds. Only where the call proves to be fraudulent or abusive in a very clear way, the issuing bank would not be obligated to pay the bond proceeds for the call on on-demand bonds. In order to prevent the issuing bank from paying the proceeds under the on-demand bond, the applicant usually files with its competent court an application for injunction prohibiting the beneficiary from calling against the issuing bank. However, it is in practice difficult for the applicant to prove the beneficiary's call on the bond to be fraudulent since the courts in almost all the jurisdictions of advanced countries require very strict and objective evidences such as the documents which were signed by the owner (beneficiary) or any other third party like the engineer. There is another way of preventing the beneficiary from calling on the bond, which is often utilized especially in the United Kingdom or Western European countries such as Germany. Based upon the underlying contract, the contractor which is at the same time the applicant of on-demand bond requests the court to order the owner (the beneficiary) not to call on the bond. In this case, there apparently seems to be no reason why the court should apply the strict fraud rule to determine whether to grant an injunction in that the underlying legal relationship was created based on a construction contract rather than a bond. However, in most jurisdictions except for United Kingdom and Singapore, the court also applies the strict fraud rule on the ground that the parties promised to make the on-demand bond issued under the construction contract. This kind of injunction is highly unlikely to be utilized on the international level because it is very difficult in normal situations to establish the international jurisdiction towards the beneficiary which will be usually located outside the jurisdiction of the relevant court. This kind of injunction ordering the owner not to call on the bond can be rendered by the arbitrator as well even though the arbitrator has no coercive power for the owner to follow it. Normally there would be no arbitral tribunal existing at the time of the bond being called. In this case, the emergency arbitrator which most of the international arbitration rules such as ICC, LCIA and SIAC, etc. adopt can be utilized. Finally, the contractor can block the issuing bank from paying the bond proceeds by way of a provisional attachment in case where it also has rights to claim some unpaid interim payments or damages. This is the preservative measure under civil law system, which the lawyers from common law system are not familiar with. As explained in this article, it is very difficult to block the issuing bank from paying in response to the bond call by the beneficiary even if the call has no valid ground under the underlying construction contract. Therefore, it is necessary for the applicants who are normally engineering and construction companies to be prudent to make on-demand bonds issued. They need to take into account the creditability of the project owner as well as trustworthiness of the judiciary system of the country where the owner is domiciled.

  • PDF