• 제목/요약/키워드: Project System

검색결과 6,664건 처리시간 0.032초

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구 (A study on the Project Process Management System (PPMS) for the effective management of R&D projects)

  • 김홍범
    • 경영과학
    • /
    • 제12권3호
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF

건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석 (Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project)

  • 강인석;윤선미;권중희;문진석
    • 한국철도학회논문집
    • /
    • 제10권4호
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

Designing a Fuzzy Expert System with a Hybrid Approach to Select Operational Strategies in Project-Based Organizations with a Selected Competitive Priority

  • Javanrad, Ehsan;Pooya, Alireza;Kahani, Mohsen;Farimani, Nasser Motahari
    • Industrial Engineering and Management Systems
    • /
    • 제16권1호
    • /
    • pp.129-140
    • /
    • 2017
  • This research was conducted in order to solve the problem of selecting an operational strategy for projects in project-based organizations by designing a fuzzy expert system. In the current research, we first determined the contributing parameters in operational strategy of project-based organizations based on existing research literature and experts' opinion. Next, we divided them into two groups of model inputs and outputs and the rules governing them were determined by referring to research literature and educational instances. In order to integrate rules, the revised Ternary Grid (revised TG) and expert opinions were applied according to a hybrid algorithm. The Ultimate rules were provided in Fuzzy Inference System format (FIS). In this FIS, proper manufacturing decisions are recommended to the user based on selected competitive priority and also project properties. This paper is the first study in which rules and relations governing the parameters contributing operational strategy in project-based organizations are acquired in a guided integrated process and in the shape of an expert system. Using the decision support system presented in this research, managers of project-based organizations can easily become informed of proper manufacturing decisions in proportion with selected competitive priority and project properties; and also be ensured that theoretical background and past experiences are considered.

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

프로젝트 과정품질이 프로젝트 성과에 미치는 영향 : 시스템통합 프로젝트를 중심으로 (A Study on the Effect of Project Process Quality on Project Success : Focusing on SI(System Integration) Project)

  • 고덕성;박소현;김승철
    • 한국IT서비스학회지
    • /
    • 제18권2호
    • /
    • pp.75-96
    • /
    • 2019
  • These days, many companies use information systems as a basis for organizational management activities and as an important component of sustainable management. Thus, securing and operating a high-quality information system that can improve the efficiency of business processes is a large part of corporate competitiveness. In order to get such a critical information system, it is only possible to successfully carry out the project. Various attempts and studies have been undertaken to increase the success rate of the project. However, the reality is that the success rate is still not getting much better. In this study, the concept of quality of service, which has long been actively studied in marketing area, was applied as a new factor to enhance the project's success. In this study, project performance activities were defined as the act of providing services. A survey of 164 valid collection data was analyzed. The analysis used SPSS 23. Four process quality factors (customer participation, customer response, knowledge and skills, reliability) and 21 metrics were derived. Through this research, I hope to be the starting point of applying process quality concept as a new breakthrough to increase success rate of project.

스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로 (A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City)

  • 이상호;조희연;민윤홍
    • 한국빅데이터학회지
    • /
    • 제8권1호
    • /
    • pp.83-97
    • /
    • 2023
  • 프로젝트의 평가란 프로젝트의 진행상황과 결과물을 평가하는 과정이다. 스마트시티 프로젝트들은 시스템 구성요소별(인프라, 서비스, 플랫폼)로 프로젝트가 나뉘기도 하고, 여러 가지 서비스별로 프로젝트들이 동시에 진행되기도 한다. 또한 추가 프로젝트를 통하여 서비스들이 개발되고 확장되기도 한다. 이렇게 여러 가지 프로젝트들이 복합적으로 진행되는 스마트시티가 목표 및 전략에 맞추어 진행되기 위해서는 프로젝트를 수행하는 과정에서 주기적인 프로젝트 평가가 필요하다. 본 논문이 제안한 스마트시티 프로젝트 평가체계는 스마트시티의 기획, 설계, 구축 및 운영의 전 단계에서 발생하는 프로젝트에 대해서 반드시 고려해야 할 다양한 요소를 반영하여 종합적이고 객관적인 지표를 제공하도록 설계되었다. 평가체계로부터 도출된 지표는 의사결정자가 스마트시티 프로젝트 개발 방향을 결정하는데 사용될 수 있다. 또한 프로젝트의 종료 이전에도 프로젝트의 성과를 중간 평가하고 이로부터 얻은 피드백을 반영할 수 있도록 설계하였다. 본 연구가 제안한 스마트시티 프로젝트 평가체계의 적용 방법을 소개하기 위해 인천경제자유구역청(IFEZ)의 스마트시티 프로젝트 사례에 개발된 평가체계를 적용하였다. 또한 평가결과를 바탕으로 스마트시티 프로젝트 항목별 개선효과를 극대화할 수 있는 항목을 제시함으로써 스마트시티 프로젝트 추진 방향을 제시하였다. 여러 가지 프로젝트들이 복합적으로 진행되는 스마트시티 프로젝트의 특성을 반영한 스마트시티 프로젝트 평가체계를 활용함으로써 스마트시티 프로젝트의 종합적인 계획 및 관리가 가능할 것이며, 프로젝트의 우선적인 개선 요소를 파악하는 데 본 연구가 참고가 될 것이다.