• 제목/요약/키워드: Project Progress

검색결과 691건 처리시간 0.026초

업무분할체계를 이용한 사업관리정보시스템 (Project Management Information System Using Work Breakdown Structure)

  • 이정구
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1997년도 추계학술대회 발표논문집:21세기를 향한 정보통신 기술의 전망
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

프로젝트 진도 측정 방법의 비교와 적용에 관한 연구 (A Study on the Comparison and Application of the Methods of Measuring Projects'Progress)

  • 민택기;송창용
    • 산업경영시스템학회지
    • /
    • 제36권3호
    • /
    • pp.87-94
    • /
    • 2013
  • The progress that becomes a basis for measuring the outcome of project is a core of project control. Follow-up corrective actions are determined depending on the degree of their differences. The methods of measuring the project progress have been developed though a variety of research and many were verified through the cases. Among such methods, this study selected Start/Finish method and Fixed Formula method. In order to check the limitations of the progress utilized in the two methods, the study compared their progresses to the progress of Percentage Complete method and analyzed the differences shown in their actual applications. Through this, it suggested the forms and scale of the projects appropriate to the application of Fixed Formula method. As for the research progress method, the study first generated a number of virtual project schedules for the establishment of an analysis model. These project schedules were varied in a way that they had different project periods and the number of different activities. The study also generated numerous project schedules for difference test. After establishing a virtual schedule plan by the scale of projects, it measured their progresses by period, analyzed the differences and repeated this procedure to obtain the results.

중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례 (Development of a Project Management System for the Turnkey-based Plant Project)

  • 고창성;노재정;현재명;김명관
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

AUTOMATED PROGRESS MEASUREHEMT FOR CONTRUCTION PROJECT

  • Seunghee Kang;Youngsoo Jung
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1068-1074
    • /
    • 2009
  • The progress is widely used as a critical index for successful construction project management. In spite of the importance of progress measurement, the excessive management effort to collect and maintain detailed data has been highlighted as a major barrier to measurement of highly accurate progress. In order to reduce the required workload and to enhance accuracy, several researches have been conducted. These researches can be categorized into two groups. First group focuses on automated data collection utilizing advanced technologies only for limited construction tasks. The second group is a research area where the standard progress measurement methodologies encompassing entire construction tasks are investigated. Topics include the adjusting the level of details, standardizing work processes, and applying flexible WBS. However, the techniques for automated data collection are not fully investigated yet in the second group. Combining these two research areas can provide a solution for more effective progress management in terms of enhancing accuracy and optimizing workload. However, there has been no comprehensive research addressing these two research groups in an integrated manner. In this context, the purpose of this paper is to propose a methodology that identifies the most suitable measurement method and data acquisition technology (e.g., GPS, RFID, etc.) for entire construction tasks of a project. The proposed methodology in this paper will be able to facilitate the selection process of data acquisition technologies for entire construction tasks of a project and to support the overall enhancement of automated progress management.

  • PDF

An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference

  • Yoo, Wi-Sung;Hadipriono, Fabian C.
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.203-213
    • /
    • 2007
  • In the past, several construction projects have exceeded their schedule resulting in financial losses to the owners; at present there are very few methods available to accurately forecast the completion date of a project. These nay be because of unforeseen outcomes that cannot be accounted for earlier and because of deficiency of proper tools to forecast completion date of said project. To overcome these difficulties, project managers may need a tool to predict the completion date at the early stage of project development. Bayesian Inference introduced in this paper is one such tool that can be employed to forecast project progress at all construction stages. Using this inference, project managers can combine an initially planned project progress (growth curve) with reported information from ongoing projects during the development, and in addition, dynamically revise this initial plan and quantify the uncertainty of completion date. This study introduces a theoretical model and proposes a mathematically information-based framework to forecast a project completion date that corresponds with the actual progress data and to monitor the modified uncertainties using Bayesian Inference.

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

  • 박원호;심재광;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.137-144
    • /
    • 2010
  • 건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • 제10권1호
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안 (A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises)

  • 오요셉;김보현;백재용;정소영;최영재
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.