Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

A Study on the Application and Development of the Strategic Environmental Assessment(SEA) Model with Reference to Urban Comprehensive Plan (전략환경평가 모형의 개발과 적용에 관한 연구(I): 도시기본계획 평가를 중심으로)

  • Sung, Hyun-Chan;Kim, Kwi-Gon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.5-31
    • /
    • 1997
  • Strategic Environmental Assessment (SEA) is an assessment process integrated with policy and planning processes considering environmental impacts, not at the level of individual project, but at higher level of policy and plan. Presently, two systems for the SEA are being implemented in Korea. One is "the consultation of environmental investigation into a change in national land utilization", which is to be pre-discussed with the head of the related central administrative organizations, based on the respective individual code. The other is "the consultation of environmental investigation into an administrative plan and project", which is to be pre-discussed with the minister of the environments for the administrative plan. However, these two systems are not integrated procedures with the planning process. In other words, there is a separate post-environmental assessment after planning. Also concrete proposal is not yet prepared for the method and procedure of environmental investigation about details of the planning. Therefore, they do not playa role in taking precautions for environmentally sustainable development. In this study, for the effective environmental investigation at the level of planning, environmental assessment model to be integrated with urban comprehensive plans was developed. The results of this study can be summarized as follows: First, based on the analysis of systematic problems in environmental investigation of this country, the study compared and analysed the SEA method of foreign countries. derived the potential limitations in its applications to this country. Also, the new method in this study, is integrated into planning process by improving the limitations. Thus, we developed the SEA model for this country, which consists of seven steps ; Phase 1; establishing a work program, Phase 2; defining the scop. of the SEA, Phase 3; analyzing an existing environmental situation, Phase 4; examining the consistency with environmental policy, Phase 5; appraising and synthesizing the plan content, Phase 6; proposing recommendations, Phase 7; monitoring and feedback. Second, the two types of application program of the developed assessment model were proposed. One is to integrate this model into planning process, and the other is for the institute and ministry of environments to implement SEA after planning. An aim of this study was developing an environmental assessment model at the planning level which was not yet established in this country and was to apply the model to urban comprehensive plan for inspection. This research will make the effective operation of environmental investigation system possible at the planning level in this country and contribute to the environmental protection at the global level.

  • PDF

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

A study on the Project Process Management System (PPMS) for the effective management of R&D projects (연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구)

  • 김홍범
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF

A Risk Management of Architectural Planning Phase in the Korea Private Infrastructure Project Using Project Financing (프로젝트 파이낸싱을 활용한 국내 SOC 민간투자사업 건축기획 단계에서의 리스크 관리)

  • Lee, Sin-young;Kim, Seon-Gyoo;Lee, Nak-Woon
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.177-184
    • /
    • 2007
  • Project Financing(PF) was introduced from the way of banks' conditional financing that take buried oil as security and offer required money to oil explores which have weak loaning ability in the U.S. 1930s. After that PF has developed with financial market and it has been activated in the market of Korea since 'An Institution about Private Financing Invitation Promotion' was established. Started with I-Hwa Ryoung tunnel project, PF has been used in the Metropolitan Area Airport Highway and etc. But because of the risk that occurred by PF's complexity and uncertainty, PF has not been used fully and there are only few practical examples. The purpose of the present study is to investigate how to decrease, identify and extract the risky factors of project that being planned by PF.

  • PDF

Research on the Framework for the Adoption of Digital Manufacturing Methodology with Information Strategy Planning Concept (ISP(정보 전략 계획) 개념을 이용한 디지털 생산 적용 프레임워크 연구)

  • Woo, Jong-Hun;Song, Young-Joo;Lee, Tae-Kyung;Shin, Jong-Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Todays, there is fast transition about the new manufacturing IT methodologies from the conceptual phase into the practical application phase for the strengthening of enterprise competitiveness in manufacturing industry. One of those new methodologies is PLM (Product Life-cycle Management). PLM methodology consists of 3D CAD for the product design, PDM (Product Data Management) for the data management based on the collaboration platform and lastly DM (Digital Manufacturing). DM has evoluted from the stand-alone computer simulation of early 1980s, and now it covers the overall production development and production. Unfortunately, there exist serious critical problems about the actual application of DM for the real work. This is owing to the transition of the point of view from stand-alone type application (such as flow simulation or robot simulation) to that of business process about product development and production management. In this paper, we propose an application framework for the successful project with the digital manufacturing methodology with the concept of Information Strategy Planning, which enables the systematic diagnosis and the quantitative evaluation. Also, we introduce the actual practice of the proposing framework with the ISP project for 'Analysis & Simulation Technique of manufacturing process project' that is being conducted by Chungnam Techno Park.

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A Study of Optimal Effort Allocation over Software Development Phase (소프트웨어 개발노력 치적 분배에 관한 연구)

  • Lee, Sang-Un;Kim, Young-Soo;Han, Pan-Am
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.865-876
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort varies according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differs from one project to another. This paper suggests models for effort allocation in planning, specifying, building, testing and implementing phases followed by the project size and development types. These models are derived from 155 different projects. Therefore, these models can be considered as a practical guideline in management of project schedule and effort allocation.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.