• 제목/요약/키워드: Project Cost Performance

검색결과 421건 처리시간 0.025초

건설회사 TQM 활동이 성과에 미치는 영향 (Construction Company TQM Impact on the Activities Performance)

  • 김자연;강인원
    • 대한안전경영과학회지
    • /
    • 제17권3호
    • /
    • pp.319-330
    • /
    • 2015
  • This study examines the factors configuration management quality of the construction company, and to analyze the impact of these factors on Project Performance and Company Performance. That quality construction management configuration factors, chief executives, corporate strategy, organizational management, information technology, and partners five variables, Project Performance variables, process management, quality management, cost management, safety management, environmental management five variables, and Company Performance parameters of financial competence and organizational satisfaction, quality of work three variables, the overall causal relationship between the presence of specific activities and management quality, classified according to the size of the company were verified by the difference in impact between the two groups.

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권3호
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • 석연숙;강성진;박인경;권용수
    • 한국경영정보학회:학술대회논문집
    • /
    • 한국경영정보학회 2007년도 International Conference
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.

  • PDF

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING REGRESSION ANALYSIS

  • Wei Tong Chen;Ying-Hua Huang;Shen-Li Liao
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.892-896
    • /
    • 2005
  • This paper collected 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake. Regression analysis was implemented to build the prediction model of the cost and the duration for the collected projects. It is found that the cubic regression models are capable for predicting the cost and the duration of the projects contracted by the central agency of which the contracting awarding approach was based on the most advantageous tendering (MAT) approach. On the other hand, power regression models are capable for predicting the cost and the duration of the projects contracted through the low bid tendering (LBT) approach. It is also found that the performance of the regression prediction model differs in accordance with organizations that contracted the reconstruction projects.

  • PDF

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Enhancing Value of Public Construction Projects by Improving Contract Review Process

  • Song, Sang-Hoon;Bang, Jong-Dae;Cho, Gun-Hee;Sohn, Jeong-Rak;Jung, Sang-Ho
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.479-489
    • /
    • 2011
  • This study aims to suggest the method to enhance the value of public construction project during contract review process considering budget reduction for project profit and public interest enhancement simultaneously. The main results of this study are as follows: (1) Current method are considered to be improved from the point that cost reduction through current method could influence performance of the object of contract without conforming to user requirements or facilities' function. (2) In order to supplement current process, the method to evaluate the variation of performance and value was established based on facility type, participants on each phase, and their requirement. (3) Case study was conducted to verify suggested method, and showed the successful application in enhancing the value of construction projects on public sector.

Comparative numerical analysis for cost and embodied carbon optimisation of steel building structures

  • Eleftheriadis, Stathis;Dunant, Cyrille F.;Drewniok, Michal P.;Rogers-Tizard, William;Kyprianou, Constantinos
    • Advances in Computational Design
    • /
    • 제3권4호
    • /
    • pp.385-404
    • /
    • 2018
  • The study investigated an area of sustainable structural design that is often overlooked in practical engineering applications. Specifically, a novel method to simultaneously optimise the cost and embodied carbon performance of steel building structures was explored in this paper. To achieve this, a parametric design model was developed to analyse code compliant structural configurations based on project specific constraints and rigorous testing of various steel beam sections, floor construction typologies (precast or composite) and column layouts that could not be performed manually by engineering practitioners. Detailed objective functions were embedded in the model to compute the cost and life cycle carbon emissions of the different material types used in the structure. Results from a comparative numerical analysis of a real case study illustrated that the proposed optimisation approach could guide structural engineers towards areas of the solution space with realistic design configurations, enabling them to effectively evaluate trade-offs between cost and carbon performance. This significant contribution implied that the optimisation model could reduce the time required for the design and analysis of multiple structural configurations especially during the early stages of a project. Overall, the paper suggested that the deployment of automated design procedures can enhance the quality as well as the efficiency of the optimisation analysis.

무기체계 목표성능과 목표비용 설정을 위한 품질기능전개(QFD) 응용모델 연구 (A Study on the Application of QFD Application Model for Target Performance and Cost Setting of The Weapon System)

  • 이태화;홍성훈;권혁무;이민구
    • 품질경영학회지
    • /
    • 제46권4호
    • /
    • pp.821-842
    • /
    • 2018
  • Purpose: To derive key requirements and key technologies for weapon system acquisition business by using Qualify Function Deployment (QFD), and to reduce business cost by setting the target performance and key expense of weapon system. Methods: We propose a QFD methodology that can induce rational decision-making by translating analyst's subjective opinions into quantitative values when analyzing requirements at the initial stage of weapon system development project. Based on QFD methodology, QFD application model combining house of quality, value engineering, and analogy cost estimating technique is presented. Results: It was possible to analyze the specific requirements necessary for the development of the weapon system, to solve the communication problem of the participants, to set clear development direction and target. Conclusion: By applying the QFD application model at the early stage of the weapon system acquisition project, it is possible to reduce the business cost by establishing clear development direction and goal through the procedural analysis process.

EVMS를 도입한 공정의 성과지수 분석 (Performance Index Analysis of Schedule Introducing EVMS)

  • 김영;이영대;김성환;김정기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.456-459
    • /
    • 2002
  • 오늘날 건설공사의 효율화를 위한 EVMS(Earned Value Management System)도입의 중요성을 인식하고 많은 연구가 발표되고 있다. 그러나 EVMS를 도입한 공정에 대한 경험부족과 국내 건설의 제도적${\cdot}$환경적 요인으로 인해서, 기술적인 분석이나 사례분석에 대한 관한 연구는 아직 미흡한 실정이다. 본 연구에서는 EVMS를 도입한 공정상에 성과지수(SPI : Schedule Performance Index, CPI : Cost Performance Index)를 산정하여, 여러 통계적 분석방법을 적용해서 프로젝트 관리상에 일정, 비용상의 추세(Trend) 및 문제의 원인을 분석${\cdot}$연구하고자 한다.

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF