Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

An Analysis of Accident Causes in Construction project by Using Insured Claim Payouts (건설공사보험 손실액을 활용한 사고원인 분석연구)

  • Yu, Yeong-Jin;Kim, Sang-Ho;Yang, Sungpil;Kim, Ji-Myong;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.60-61
    • /
    • 2015
  • In recent years, the accidents in construction projects are continuously increasing due to their complexity and variety. However, few studies have been conducted regarding the risk prediction model and the database of risk assessment in construction projects. To address of these issues, the objective of this study is to analyze the accident causes by using insured claim payouts of insurance companies. First, the descriptive analysis of accidents causes is conducted according to scheduling rate, season, and total construction costs. Second, the correlation analysis is conducted between accidents causes and total construction costs. In the future, the risk assessment model can be developed to quantify the accident causes in construction projects to estimate claim payouts of insurance companies.

  • PDF

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

A Study on Dispute Claim to the Apartment Reconstruction Projects (공동주택 재건축 사업의 분쟁 클레임에 관한 연구)

  • Lee, Mi-Ae;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.268-273
    • /
    • 2008
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.

  • PDF

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

Identification of Claim Elements for Design Build Projects using FMEA Method (FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출)

  • Yoon, Seokmin;Hyun, Changtaek;Han, Sangwon;Cha, Yongwoon
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

GENERAL QUALITY ASSURANCE STRATEGY IN MASS CONSTRUCTION OF RESIDENTIAL BUILDINGS IN DEVELOPING COUNTRIES

  • A.Rashidi;M.H.Sebt
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.769-776
    • /
    • 2007
  • The comprehensive Topic of Total Quality Management (TQM) has been put forward since the 6th decade in industrial countries. The serious attention to it in developing countries goes back to recent years. Unfortunately serious attention is not paid to quality issues in building industry. Therefore, the construction of buildings is highly vulnerable against natural events while having low effective lifetime. Wide-range destruction of the residential buildings in the earthquake of Bam ( in IRAN ) is a clear proof for this claim. In this paper we tried to present the corresponding effects between quality issues and other aspects of a building project (such as costs) and proposed general solutions to improve quality indices in construction industry.

  • PDF

Economic Evaluation of Hospital-based Home Care Services for the Breast Cancer Surgery Patients (유방암 수술 환자에 대한 가정간호서비스의 경제성 평가)

  • Ko, Jeong Yeon;Yoon, Ju Young
    • Research in Community and Public Health Nursing
    • /
    • v.32 no.3
    • /
    • pp.356-367
    • /
    • 2021
  • Purpose: This study conducted an economic evaluation of hospital-based home care services for the patients who had undergone breast cancer surgery. Methods: A total of 12,483 patients over 18 years of age who had received breast cancer surgery in 26 tertiary hospitals in 2018 were analyzed with the claim data from the Health Insurance Review & Assessment Service using cost-minimization analysis and societal perspectives. Results: There were 156 patients who utilized hospital-based home care services within 30 days after breast cancer surgery, and they received 2.17 (SD=1.17) hospital-based home care service on average. The average total cost was 5,250,028 KRW (SD=1,905,428) for the group receiving continuous hospital-based home care and 6,113,402 KRW (SD=2,033,739) for the group not receiving continuous hospital-based home care (p<.001). The results of the economic evaluation of continuous hospital-based home care services in patients who had undergone breast cancer surgery indicated a total benefit of 953,691,000 KRW, a total cost of 819,004,000 KRW, and a benefit-cost ratio of 1.16 in 2018. Conclusion: Continuous hospital-based home care was considered economically feasible as the total costs for the group receiving continuous hospital-based home care were lower than those of the group not receiving continuous hospital-based home care. Therefore, policy modification and financial incentives are recommended to increase the utilization of hospital-based home care services for patients who had undergone breast cancer surgery.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.