• Title/Summary/Keyword: Progress Management System

Search Result 701, Processing Time 0.03 seconds

A Development of Power System Protection Database Management System for Computerized Integrated Environment (계통 보호 종합 전산화를 위한 데이터베이스 관리 시스템 개발)

  • Jung, B.K.;Lee, S.J.;Choi, M.S.;Kang, S.H.;Kim, H.P.;Lee, W.H.;Choi, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1475-1477
    • /
    • 1999
  • The setting of protective relays, which is critical to the system security, requires a huge volume of data and a lot of repetitive calculations. Therefore computerization of this process, named PROSET2000 is in progress in KEPCO. PROSET2000 is based on a power system protection database. The database must accomodate a variety of protective device data efficiently, which need be viewed and updated with ease. This paper suggests several database management functions for PROSET2000.

  • PDF

Rolling Stock Fire Engineering aspect of System Engineering (System Engineering 측면에서 전동차 화재기술관리)

  • Chang, Jung-Hoon;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.163-168
    • /
    • 2005
  • In case of rolling stock, SEMS is generally applied in the advanced countries, but is start stage in our country. SEMS is defined the system engineering management system in order to achieve the optimized train performance among the several client requirements aspect of technical engineering management during the design life cycle. And the fire engineering activities in hong kong EMU project are introduced aspect of SEMS in this paper. The fire engineering at rolling stock in view of SEMS controls to apply the satisfied interior material by the fire safety standards (regulation of the commute urban subway safety guideline by the MOCT, BS 6853, NFPA 130, NF F 16-101) and to minimize the fire load in order that passengers egress safe from the fired rolling stock. The rolling stock in the advanced countries is designed to stand for 15-20 minutes in considering the rolling stock to be fired in tunnel. For passenger fire safety, the passenger evacuation provision and progress is set up.

  • PDF

A Study on Establishment and Control of the Quality Control Policy (품질관리 방침의 설정과 관리에 관한 소고)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.11
    • /
    • pp.35-43
    • /
    • 1985
  • In this paper we will concentrate on the Quality Control Policy which should be enforced as a part of the Total Quality Control considers the global concepts, the establishment Procedures, and the evolution and operation of Quality control policy to achieve effectively it. For enforcement of the Qualify control policy shall be focused for considerations : (1) suggestion of the optimum control policy (2) suggestion of a comprehensive plan and promoting method quality control (3) suggestion of matters that need special consideration at the time of decision of a comprehensive management of control policy thereof. (4) A comprehensive Proposal (5) suggestion of a plan for progress of the Quality control system and the supplementary plan In the future, accordingly, establishment d its own policy control level is desirably more reasonable, and the Total Quality Control System that employes the control efficiency of periodical and systematic and rationalization and radical reform of the enterprise management problem as the restrictive conditions must be applied for quality control system.

  • PDF

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage (공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측)

  • Jin, Eui-Jae;Kwak, Soo-Nam;Kim, Du-Yon;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.137-142
    • /
    • 2006
  • Cost and duration is important factors which directly affect profit therefore must be forecasted correctly to accomplish success of projects. So construction company uses EVMS(Earned Value Management System) to forecast final cost and duration. But previous forecasting model has low accuracy because of its linear forecasting method and can't reflect characteristic of company and project and changes as each progress. This paper presents cost and duration forecasting model using the slope prediction of cost and duration as each progress to reflect the various characteristics of construction industry. EVMS data of 23 road construction projects was used to make up regression analysis equation of slope forecasting model.

  • PDF

Development of Grip Strength Training and Evaluation System of Hand Functions (악력 훈련 및 평가를 위한 측정 시스템 개발에 관한 연구)

  • Kang, Han-Su;Chung, Sung-Taek
    • Korean Journal of Applied Biomechanics
    • /
    • v.19 no.3
    • /
    • pp.611-617
    • /
    • 2009
  • The primary purpose of this study was to analysis quantitatively the degree of injury and/or the progress of treatment for physical impairment. This study provided a more detailed study that evaluates all test parameters including maximum grip strength, duration of operation, average grip strength, acceleration work, dynamic endurance time and percent change in static endurance. Also, a complete database management system is developed and used to store related training, evaluation, and personal information. In addition, the system is developed a grip sensor using load.cell transducer (${\leq}60kg$). The system will be efficient to operate and convenient to use, furthermore, it can be helped for understanding and analysis the progress of a patient during a doctor's rehabilitation program.

A Study on Safety Management Development Plan of Domestic City Gas Facility (국내 도시가스 시설의 안전관리 발전방안에 관한 연구)

  • 정원익;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.23-33
    • /
    • 2004
  • Domestic city gas is supplying in an about 10 million household on present 34 city gas companies because is begun to supply regularly after two 1980 years middle. But, result that focus on city gas supply spread and stable supply for supply area and neglects about safety problem, hundreds casualties such as Ahyun explosion accident and Deagu city gas explosion accident were reached in situation that occurred large size calamity occurs it is dizzliness. In the case of advanced nation, can see that accomplish system and progress that in technology after experience major accident. Therefore, grasp problem investigating safety actual conditions for city gas institution and study about solvable plan is required this. Also, must guide reform and level elevation of a domestic company safety technology through induction and development of safety technology that is suitable in supply, domestic real condition etc. Must help in power positivity that is full text executing high-quality safety education about step High firing mechanism safety technology than present safety education.

A case study and future directions of Radio Frequence Identification system in A/E/C industry (건설분야에서의 RFID 시스템 활용사례 및 발전방향)

  • Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.140-144
    • /
    • 2004
  • Barcode system has been used for many years in labors controlling & ready mixed concrete supplement in A/E/C industry However, it was not quite successful because ot its limitations in the field. The use of RFID system is getting important in the real world. RFID system substituted for barcode system in labor controling & ready mixed concrete supplement and it showed its potentialities in other major materials supply logistics and its possibilities In progress management of 4D system. This research shows RFID system's case study and its future directions in A/E/C industry.

  • PDF

Computerization for Management of Street Tree Using CAD (CAD를 이용한 가로수 관리 전산화에 관한 연구)

  • 허상현;심경구
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.2
    • /
    • pp.68-76
    • /
    • 2001
  • The purpose of this study is to computerize street tree management using a CAD program in order to manage the drawing record of street trees systematically and concurrently. The configuration of this program is composed of Reference Data, Data Inquiry, and Cost Assessment. The Reference Data includes characteristics of trees, monthly managements records, damage by blight and insects and usage of pesticides. The Data Inquiry includes an individual search of the tree index, simple searches and multiple searches. The Cost Assessment includes two main components, the data input with labor cost, manure ocst and pesticide cost and the assesment of management cost for prevention of blight and insects, pruning and fertilization. The results of this study are as follows: 1) When there are practices such as transplanting and removing of street trees it is immediately updated with the various situation. By creating an in progress a tree management system, up to the date information can be given to the manager for decision making. 2) To identify individual tree at the site or in drawing, the street name and numbers were used instead of coordinates. Tree tags are attached to the street trees individually. It can make DB management simple and easy. 3) By doing simple or multiple search with constructed DB, data can be provided quickly. 4) The result of this type of search are useful in the assessment of management cost very useful in regards to items such as the pruning, pesticides scattering and fertilization. 5) By using the AutoCAD software and existing PC without purchasing new equipment, the cost of system implementation can be minimized.

  • PDF