In this paper, we tried to investigate the adjusting patterns of production fluctuation of major soybean production countries. In particular, we focus our attention on the trade transmission effect of major soybean production countries on world market. We found that the instability of world market for soybean is likely to be increased mainly due to the production fluctuation and trade transmission effect of major production countries, e.g. Brazil, Paraguay, and Canada. Most of the major production countries have adjusted the production fluctuation through consumption and trade rather than inventory management, and hence the instability of world market for soybean tends to be more instable. Therefore we need to develop the effective policy measures for making domestic soybean market more stable such as a plan for keeping domestic production, a valid inventory management strategy, a use of futures market, and a strategy to diversify import market as a large importing country.
Proceedings of the Safety Management and Science Conference
/
2003.11a
/
pp.151-160
/
2003
The company was focusing on production which was partial mission rather than acquiring the information of customer in intensive process industry. The company accepted loss which is from over-production, losing of opportunity. After changing to Web environment, supply chain is more complicated and need of customer is more various. As a result the company hard works on controlling production rates, production quantities in production area and gathering exact information which is about available resource and available quantities. Cooperated demand planning have to get decreasing of inventory, improving of customer service in supply chain management. Specially demand planning that considers allocation of capacity is executed in Iron-Industry. Demand planning must be classified by customer, region and supply position level.
The company was focusing on production which was partial mission rather than acquiring the information of customer in intensive process industry. The company accepted loss which is from over-production, losing of opportunity. After changing to web environment, supply chain is more complicated and need of customer is more various. As a result the company hard works on controlling production rates, production quantities in production area and gathering exact information which is about available resource and available quantities. Cooperated demand planning have to get decreasing of inventory, improving of customer service in supply chain management. Specially demand planning that considers allocation of capacity is executed in Iron-Industry. Demand planning must be classified by customer, region and supply position level.
Recently, a multi-facility, multi-product and multi-period industrial production-distribution planning problem has been widely investigated in Supply Chain Management (SCM). One of the key issues in the current SCM research area involves reducing both production and distribution costs. We have developed an optimization model to tackle the above problems under the restricted conditions such as transportation time and a zero inventory. Computational experiments using commercial tool Ms-Excel Solver show that the real size problems we encountered can be solved in reasonable time. The model can be used to decide an appropriate production-distribution planning problem in SCM research area.
Proceedings of the Korean Operations and Management Science Society Conference
/
2002.05a
/
pp.363-370
/
2002
This paper presents a production planning algorithm for minimizing the costs of production and subcontracting in SCM (supply chain management) environment. In our SCM environment, the several local plants that aye dispersed geographically produce parts and products. In this environment, we have to decide the production volumes of both parts and products considering the BOM (bill-of-material) structure to meet the fixed order quantity or forecasted demand quantity. Each plant produces the specified parts of product with finite production capacity. There exist subcontracting decisions relevant to the production capacity of each plant except the core process plant, and when we use the subcontractor's capacities we should be charged for the fixed subcontracting fees. The objective of this study is to solve the production planning problem, which minimizes the total costs of production, inventory, setup, and subcontracting under constraints of production and subcontracting capacity. For this problem, an integrated production planning model based on the multi-level capacitated lot sizing problem was formulated, and efficient decomposition algorithm was proposed. The experimental investigation shows that the proposed heuristic generates quite good solutions at very low computational costs.
International conference on construction engineering and project management
/
2024.07a
/
pp.1137-1144
/
2024
Reducing the environmental impact in the construction industry is essential for a sustainable future, and life cycle assessment (LCA) should be effectively conducted to reduce the environmental impact. The construction industry is one of the fields that emits a large amount of Greenhouse Gas (GHG). It is also characterized by many material inputs and a one-off single production. Therefore, it took a lot of effort to evaluate all the input materials, and it was difficult to implement a detailed LCA. There is need to solve these problems and to establish a fair and reliable evaluation method. In order to solve this problem, it is proposed to establish a common rule for calculating environmental loads of buildings, such as carbon dioxide emissions. In addition, by effectively utilizing the Inventory Database for Environmental Analysis (IDEA) database, which is an inventory database developed in Japan. It can evaluate not only carbon dioxide but also various environmental substances, and analyze how the environmental impact is correlated with each building and its constituent materials. Furthermore, by analyzing the actual buildings of 83 projects, the differences in the tendency of building type and materiall was clarified. A database was constructed to help reduce the environmental impact during the early stages of construction project and for different types of buildings.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2021.05a
/
pp.157-158
/
2021
Big data in the supply chain mainly comes from four aspects. One is the relevant data inevitably generated in the process of product value transfer of enterprises in the supply chain, such as production equipment quality data, planned procurement data, product data, etc; On the other hand, it is derived from the ERP data of various companies in the supply chain; The third is e-commerce data from the customer, and the last is data from external or manually entered data. A third-party data service center analysis and mining the data to predict and control the inventory in the process of supply chain operation. It brings innovation and change of management technology and way of thinking to the whole supply chain in many aspects, and finally achieves the goal of coordinated inventory and zero inventory of the whole supply chain.
Journal of Korean Institute of Industrial Engineers
/
v.33
no.2
/
pp.246-253
/
2007
All of the machines in a production line can be classified into bottleneck and non-bottleneck machines. A bottleneck is a resource whose capacity limits the throughput of the whole production facility. This paper addresses a batch sizing problem at the bottleneck machine. Traditionally, most batch sizing decisions have been made based on the EOQ (economic order quantity) model where setup and inventory costs are considered while throughput rate is assumed to be given. However, since batch size affects the capacity of the bottleneck machine, the throughput rate may not be constant. As the batch size increases, the frequency of the setup decreases. The saved setup time can be transferred to processing time, which results in higher throughput. But, the larger batch size may also result in longer lead time and larger WIP inventory level. This paper presents an alternative method to determine batch size at the bottleneck machine in a manufacturing line. A linear search algorithm is introduced to find optimal throughput rate and batch size at the same time. Numerical examples are provided to see how the proposed method works and to investigate the effects of some parameters.
Journal of Korean Institute of Industrial Engineers
/
v.1
no.1
/
pp.41-56
/
1975
In the past the pattern of business down-trend usually appeared in the form of, first, decrease in facility investment, then decrease in inventory level, followed by reduced level of consumption. But the pattern nowadays is becoming just the opposite, that is, first, consumption decrease, then inventory level increase, followed by restriction of facility investment. Also in the past, the greater effort was placed in strengthening of hardware areas through optimization and modernization of production means on the premise of sales. But lately software areas take most of the main effort to establish production mean with sales as its objective. Under these circumstances one of the real problems facing production activities today is the conflicting relationship between sales and production functions. This occurs due to differences of their view points. Then, in order to achieve maximum profit at the least cost, which is the ultimate objective of a production activity, the need arises to effectively coordinate sales demand and plant production capacity. For this purpose strong control means and function must be devised. In our case study example we illustrate a management technique for a combined planning function, of optimal coordination of product mixes utilizing a computerized linear programming model as control means of attaining maximum profit. It is hoped that this example help achieve some of corporate objectives.
Nur Anis Zulaikha Kamarudin;Aznan Fazli Ismail;Mohamad Hairie Rabir;Khoo Kok Siong
Nuclear Engineering and Technology
/
v.56
no.7
/
pp.2641-2649
/
2024
Effective management of slightly used nuclear fuel (SUNF) is crucial for both technical and public acceptance reasons. SUNF management, radiotoxicity risk, and associated financial investment and technological capabilities are major concerns in nuclear power production. Reducing the volume of SUNF can simplify its management, and one possible solution is utilizing small modular reactors (SMR) and advanced fuel designs like those with thorium. This research focuses on studying the neutronic performance and radionuclide inventory of three different thorium fuel configurations. The mass of fissile material in thorium-based fuel significantly impacts Kinf, burn-up, and neutron energy spectrum. Compared to uranium, thorium as a fuel produces far fewer transuranic elements and less long-lived fission products (LLFPs) at the end of the core cycle (EOC). However, certain fission product elements produced from thorium-based fuel exhibit higher radioactivity at the beginning of the core cycle (BOC). Physical separation of thorium and uranium in the fuel block, like seed-and-blanket units (SBU) and duplex fuel designs, generate less radioactive waste with lower radioactivity and longer cycle lengths than homogeneous or mixed thorium-uranium fuel. Furthermore, the SBU and duplex feel designs exhibit comparable neutron spectra, leading to negligible differences in SUNF production between the two.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.