• Title/Summary/Keyword: Procurement Requirement

Search Result 25, Processing Time 0.117 seconds

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

A Study on RAMS Parameters in the Procurement Requirement for Rolling Stock (철도차량의 구매 요구사항에 포함되는 RAMS 특성값에 관한 연구)

  • Chung, In-Soo;Lee, Kang-Won;Kim, Jong-Woon
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.4
    • /
    • pp.371-377
    • /
    • 2008
  • As a railway is receiving attention as an environment-friendly transportation mode, many high speed, inter-city and urban railway are constructed and remodeled in the world. With this trend, railway RAMS was included in the international standard IEC 62278 in 2002. RAMS activity in domestic market is also increased with this international trend. However, IEC 62278 does not describe the methodology of substantial contents like how reliability target is set although it can be used as an overall guideline when RAMS requirements are included in the purchase specification. That is because RAMS requirements should be set with the specific railway condition. It is required to fully understand the meaning of railway RAMS parameters and apply those correspond to the specific railway system and environment condition especially when a quantitative RAMS requirement is set. In this study, the meaning and characteristics of RAMS parameters applicable to the development of quantitative RAMS requirement of rolling stock is described. And the basic concept of RAMS and the definition of failure that IEC 62278 describes is modified and suggested in order to make more suitable to the development of quantitative RAMS requirement.

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

Study on Reserve Requirement for Wind Power Penetration based on the Cost/Reliability Analysis

  • Shin, Je-Seok;Kim, Jin-O;Bae, In-Su
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.4
    • /
    • pp.1397-1405
    • /
    • 2017
  • As the introduction of wind power is steadily increasing, negative effects of wind power become more important. To operate a power system more reliable, the system operator needs to recognize the maximum required capacity of available generators for a certain period. For recognizing the maximum capacity, this paper proposes a methodology to determine an optimal reserve requirement considering wind power, for the certain period in the mid-term perspective. As wind speed is predicted earlier, the difference of the forecasted and the actual wind speed becomes greater. All possible forecast errors should be considered in determining optimal reserve, and they are represented explicitly by the proposed matrix form in this paper. In addition, impacts of the generator failure are also analyzed using the matrix form. Through three main stages which are the scheduling, contingency and evaluation stages, costs associated with power generation, reserve procurement and the usage, and the reliability cost are calculated. The optimal reserve requirement is determined so as to minimize the sum of these costs based on the cost/reliability analysis. In case study, it is performed to analyze the impact of wind power penetration on the reserve requirement, and how major factors affect it.

MANUFACTURER′S PROCUREMENT DECISION ANALYSIS IN A SUPPLY CHAIN WITH MULTIPLE SUPPLIERS

  • Kim, Bowon;Park, Kwang Tae;Lee, Seungchul
    • Management Science and Financial Engineering
    • /
    • v.6 no.2
    • /
    • pp.1-28
    • /
    • 2000
  • Supply chain management issues faced by a manufacturing company are considered in this paper. The supply chain consists of a manufacturing company and its suppliers. The manufacturer produces multiple products with inputs (e.g., raw materials) from the suppliers, but each product needs a different mix of these inputs. The market demand for the products is uncertain. We develop a mathematical model and algorithm, which can help the manufacturer to solve its procurement decision problem: how much of raw material to order from which supplier. The model incorporates such factors as market demand uncertainty, product's input requirement, supplier's as well as manufacturer's capacity, plus other costs comparable with those in a typical newsboy problem. Numerical examples are presented to see the interacting effects among critical parameters and variables.

  • PDF

A study on RAMS parameters in the Procurement requirement for rolling stock (철도차량의 구매 요구사항에 포함되는 RAMS 특성값에 관한 연구)

  • Chung, In-Soo;Kim, Jong-Woon;Lee, Kang-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.780-788
    • /
    • 2008
  • As a railway is receiving attention as an environment-friendly transportation mode, many high speed, inter-city and urban railway are constructed and remodeled in the world. With this trend, railway RAMS was included in the international standard IEC 62278 in 2002. RAMS activity in domestic market is also increased with this international trend. However, IEC 62278 does not describe the methodology of substantial contents like how reliability target is set although it can be used as an overall guideline when RAMS requirements are included in the purchase specification. That is because RAMS requirements should be set with the specific railway condition. It is required to fully understand the meaning of railway RAMS parameters and apply those correspond to the specific railway system and environment condition especially when a quantitative RAMS requirement is set. In this study, the meaning and characteristics of RAMS parameters applicable to the development of quantitative RAMS requirement of rolling stock is described. And the basic concept of RAMS and the definition of failure that IEC 62278 describes is modified and suggested in order to make more suitable to the development of quantitative RAMS requirement.

  • PDF

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

A Design-Decision Support Framework for Evaluation of Design Options in Passenger Ship Engine Room

  • Kim, Soo-Woong;Lee, Hyun-Jin;Kwon, Young-Sub
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.277-280
    • /
    • 2006
  • Most real world design evaluation and risk-based decision support combine quantitative and qualitative (linguistic) variables. Decision-making based on conventional mathematics that combines qualitative and quantitative concepts always exhibit difficulty in modelling actual problems. The successful selection process for choosing a design/procurement proposal is based on a high degree of technical integrity, safety levels and low costs in construction, corrective measures, maintenance, operation, inspection and preventive measures. However, the objectives of maximising the degree of technical performance, maximising the safety levels and minimising the costs incurred are usually in conflict, and the evaluation of the technical performance, safety and costs is always associated with uncertainties, especially for a novel system at the initial concept design stage. In this paper, a design-decision support framework using a composite structure methodology grounded in approximate reasoning approach and evidential reasoning method is suggested for design evaluation of machinery space of a ship engine room at the initial stages. It is a Multiple Attribute Decision-Making (MADM) or Multiple Criteria Decision Making (MCDM) framework, which provides a juxtaposition of cost, safety and technical performance of a system during evaluation to assist decision makers in selecting the winning design/procurement proposal that best satisfies the requirement in hand. An illustrative example is used to demonstrate the application of the proposed framework.

  • PDF