• Title/Summary/Keyword: Procedure time

Search Result 5,413, Processing Time 0.026 seconds

A Study on the Development of the Real-Time G.723.1 Speech Codec Using a Fixed-Point DSP(ADSP-2181) (고정소수점 DSP(ADSP-2181)을 이용한 실시간 G.723.1 음성부호화기 개발에 관한 연구)

  • Park, Jung-Jae;Chung, Ik-Joo
    • Speech Sciences
    • /
    • v.3
    • /
    • pp.177-186
    • /
    • 1998
  • This paper describes the procedure of implementing a real-time speech codec, G.723.1 which was developed by DSP Group and standardized by ITU-T, using fixed-point DSP, ADSP-2181. This codec has two bit rates associated with it, 5.3 and 6.3 kbit/s. We implemented only one bit rate, 6.3 kbit/s, of the two with fixed-point 32-bit precision. According to the result of the experiment, the amount of computational burden is about 55 MIPS and its quality is similar to the result of the PC simulation with floating-point arithmetic. In this paper, we proposed a method to use a fixed-point DSP and a procedure for developing a real-time speech codec using DSPs and finally developed a G.723.l speech codec for ADSP-2181.

  • PDF

A Simple Volume Tracking Method For Compressible Two-Phase Flow

  • SHYUE KEH-MING
    • Journal of The Korean Astronomical Society
    • /
    • v.34 no.4
    • /
    • pp.237-241
    • /
    • 2001
  • Our goal is to present a simple volume-of-fluid type interface-tracking algorithm to compressible two-phase flow in two space dimensions. The algorithm uses a uniform underlying Cartesian grid with some cells cut by the tracked interfaces into two subcells. A volume-moving procedure that consists of two basic steps: (1) the update of volume fractions in each grid cell at the end of the time step, and (2) the reconstruction of interfaces from discrete set of volume fractions, is employed to follow the dynamical behavior of the interface motion. As in the previous work with a surface-tracking procedure for general front tracking (LeVeque & Shyue 1995, 1996), a high resolution finite volume method is then applied on the resulting slightly nonuniform grid to update all the cell values, while the stability of the method is maintained by using a large time step wave propagation approach even in the presence of small cells and the use of a time step with respect to the uniform grid cells. A sample preliminary numerical result for an underwater explosion problem is shown to demonstrate the feasibility of the algorithm for practical problems.

  • PDF

An Analysis of Viscoelastic Problems by Boundary Element Method (경계요소법에 의한 선형 점탄성체의 해석)

  • 이상순;조덕상;손용수
    • Computational Structural Engineering
    • /
    • v.7 no.2
    • /
    • pp.69-75
    • /
    • 1994
  • The procedure for the stress and displacement analysis of realistic viscoelastic materials by time domain boundary element method(BEM) has been discussed. The fundamental solutions and stress kernels have been obtained using the elastic-viscoelastic correspondence principle. The relaxation function is expanded in a sum of exponentials and the transformed fundamental solutions and stress kernels are inverted numerically into real time space. The proposed procedure requires a small computational effort and it is applicable in time domain boundary element analysis of realistic viscoelastic problems. Numerical results of example problem show the effectiveness and applicability of the proposed method.

  • PDF

A Study for Time Standard Estimation with Activity Sampling Method (가동샘플링기법에 의한 표준시간추정에 관한 연구)

  • 이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.9
    • /
    • pp.1-5
    • /
    • 1983
  • This study takes over the application of survey sampling theory to activity sampling and the application of activity sampling to time standard estimation. Cluster, stratified, and multistage sampling are studied in conjunction with random and systematic sampling. Estimation procedures that will maximize the information obtained per cost expended on the study and specification of the procedure to be used to estimate the accuracy of the estimates for the adopted procedure are considered. The use of multiple regression md linear programming to estimate standard element performance time from typical job lot production data is also considered.

  • PDF

Output LC Filter Design of Voltage Source Inverter Considering the Performance of Controller (제어기 성능을 고려한 전압형 인버터의 출력 LC필터 설계)

  • Min, Wan-Ki;Kim, Jae-Sig;Cho, Jae-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.10a
    • /
    • pp.206-211
    • /
    • 2005
  • The LC filter design procedure of the inverter output filter is described. The transfer function of the filter output voltage to the load current is described with the capacitor value and the system time constant considering the system controller. By using the closed form of the relation between the filter capacitor value and the system time constant, the capacitor value can be calculated with the given system time constant and vice versa. It is more practical for the implementation of power and control circuit of inverter. And as the effect of the load current to the voltage distortion can be calculated from the closed form, it is possible to analyze the system how much the voltage waveform is distorted in case of the nonlinear load. All the proposed design procedure is verified with the simulation and experimental results.

  • PDF

Characteristics of local events occured in and around the Korean Peninsula in 2002 (한반도 일원에서 발생한 Event 특성)

  • 전정수;제일영;지헌철;박윤경
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.03a
    • /
    • pp.12-15
    • /
    • 2003
  • Korea Institute of Geoscience and Mineral Resources(KIGAM) is operating Wonju Korea Seismic Research Station(KSRS), 29 regional seismic research stations and 5 Korea-China joint seismic stations in China. Also KIGAM is operating Korea Earthquake Monitoring System (KEMS) to archive the real-time data stream and to determine event parameters (epicenter, origin time, and magnitude) by the automatic processing and analyst review. To do this, KEMS used KIGAM's regional seismic network and other institute's network in a near real-time base. From Dec. 1, 2001 to Nov. 30, 2002, 3,827 seismic events were analyzed in a automatic processing procedure and finally 3,437 events were analyzed by analyst and archived. But problem is this event catalog includes not only natural earthquake, but also artificial events produced by the blast. More than 80 % events were concentrated in daytime and many events were concentrated in the confirmed blast sites, Pyeongyang, Pocheon, Yeongjong-do, Donghae city, etc. Because these artificial events are a major potential cause of error when estimating the seismicity of a specific region, discrimination procedure has to be developed in the first place.

  • PDF

Handover Scheme Considering for Signaling Time in Mobile Networks (무선 네트워크 망에서 시그널링 시간을 고려한 핸드오버 기법)

  • 김도연;한정안;김병기;박상준;김관중
    • Journal of the Korea Society for Simulation
    • /
    • v.11 no.1
    • /
    • pp.45-58
    • /
    • 2002
  • In the wireless communication systems of the next generation, the hard handover may frequent]y occur between the existing 2G(2nd generation) and the 3(1(3rd generation). When it occurs between the 2G and the 3G, the call setup procedure will be added to MT(Mobile Terminal), the relay bases in 2G and 3G, and the switches. It causes total time to handle the hangover to increase. Therefore, the forced termination probability may be increased since relative time decreases. In this paper, we propose a method to decrease the forced termination. The method execute the handover procedure with speed and direction of the MT preestimated in the inner cell when MT enters the boundary cell.

  • PDF

Shared Protection of Lightpath with Guaranteed Switching Time over DWDM Networks

  • Chen Yen-Wen;Peng I-Hsuan
    • Journal of Communications and Networks
    • /
    • v.8 no.2
    • /
    • pp.228-233
    • /
    • 2006
  • Survivability is a very important requirement for the deployment of broadband networks because out of service links can affect volumes of traffic even if it is a very short time. And the data paths of broadband networks, which are critical for traffic engineering, are always necessary to be well protected. The procedure of protection or restoration for a path is initiated when failure is detected within the working path. In order to minimize the influence on transmission quality caused by the failure of links and to provide a definite time for the recovery from the failure, the protection switching time (PST) should be carefully considered in the path arrangement. Several researches have been devoted to construct the protection and restoration schemes of data paths over dense wavelength division multiplexing (DWDM) networks, however, there was rare research on the design of data paths with guaranteed protection switching time. In this paper, the PST-guaranteed scheme, which is based on the concept of short leap shared protection (SLSP), for the arrangement of data paths in DWDM networks is proposed. The proposed scheme provides an efficient procedure to determine a just-enough PST-guaranteed backup paths for a working path. In addition to selecting the PST-guaranteed path, the network cost is also considered in a heuristic manner. The experimental results demonstrate that the paths arranged by the proposed scheme can fully meet the desired PST and the required cost of the selected path is competitive with which of the shared path scheme.

Change points detection for nonstationary multivariate time series

  • Yeonjoo Park;Hyeongjun Im;Yaeji Lim
    • Communications for Statistical Applications and Methods
    • /
    • v.30 no.4
    • /
    • pp.369-388
    • /
    • 2023
  • In this paper, we develop the two-step procedure that detects and estimates the position of structural changes for multivariate nonstationary time series, either on mean parameters or second-order structures. We first investigate the presence of mean structural change by monitoring data through the aggregated cumulative sum (CUSUM) type statistic, a sequential procedure identifying the likely position of the change point on its trend. If no mean change point is detected, the proposed method proceeds to scan the second-order structural change by modeling the multivariate nonstationary time series with a multivariate locally stationary Wavelet process, allowing the time-localized auto-correlation and cross-dependence. Under this framework, the estimated dynamic spectral matrices derived from the local wavelet periodogram capture the time-evolving scale-specific auto- and cross-dependence features of data. We then monitor the change point from the lower-dimensional approximated space of the spectral matrices over time by applying the dynamic principal component analysis. Different from existing methods requiring prior information on the type of changes between mean and covariance structures as an input for the implementation, the proposed algorithm provides the output indicating the type of change and the estimated location of its occurrence. The performance of the proposed method is demonstrated in simulations and the analysis of two real finance datasets.

Time Domain Fatigue Analysis on the Upper Rolling Chock of IMO Type B Tank (IMO Type B 탱크 상부 Rolling Chock에 대한 시간영역 피로해석)

  • Park, Myong-Jin;Park, Jun-Seok;Won, Sun-Il;Choi, Byung-Ki;Park, Kweong-Won;Paik, Young-Min;Kim, Yooil
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.5
    • /
    • pp.380-387
    • /
    • 2016
  • Present research target to develop the procedure of long-term fatigue analysis of the structural details near the upper rolling chock of IMO type B tank by using the time domain modal analysis technique where both the contact and friction behavior can be accurately simulated. In order to perform the time domain analysis focused on the contact and friction, the entire model of the hull and tank was condensed with DOF reduction technique, which is obtained by transforming the global finite element model into its quasi-static modal coordinate. Modal analysis using the quasi-static deformation modes is chosen as a cost effective time domain simulation method and this is based on the fact that the structural response of the tank is quasi-static. Based on the developed cost effective time domain simulation method, the long-term fatigue analysis procedure for the structural details near the rolling chock and key of independent type tank is targeted to be established. The developed fatigue assessment procedure takes into account, wave induced stress and both contact and friction induced stress without loss of accuracy.