• Title/Summary/Keyword: Preliminary Cost Estimation

Search Result 59, Processing Time 0.026 seconds

Comparative studies for the performance of a natural gas steam reforming in a membrane reactor (분리막 반응기를 이용한 천연가스 개질반응의 성능에 관한 비교 분석)

  • Lee, Boreum;Lim, Hankwon
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.6
    • /
    • pp.95-101
    • /
    • 2016
  • For a natural gas steam reforming, comparative studies of the performance in a conventional packed-bed reactor and a membrane reactor, a new conceptual reactor consisting of a reactor with series of hydrogen separation membranes, have been performed. Based on experimental kinetics reported by Xu and Froment, a process simulation model was developed with Aspen $HYSYS^{(R)}$, a commercial process simulator, and effects of various operating conditions like temperature, $H_2$ permeance, and Ar sweep gas flow rate on the performance in a membrane reactor were investigated in terms of reactant conversion and $H_2$ yield enhancement showing improved $H_2$ yield and methane conversion in a membrane reactor. In addition, a preliminary cost estimation focusing on natural gas consumption to supply heat required for the system was carried out and feasibility of possible cost savings in a membrane reactor was assessed with a cost saving of 10.94% in a membrane reactor.

Development of Key Indicators for Nurses Performance Evaluation and Estimation of Their Weights for Management by Objectives (목표관리를 적용한 간호사 성과평가 핵심 지표개발과 가중치 산정)

  • Lee, Eun-Hwa;Ahn, Sung-Hee
    • Journal of Korean Academy of Nursing
    • /
    • v.40 no.1
    • /
    • pp.69-77
    • /
    • 2010
  • This methodological research was designed to develop performance evaluation key indicators (PEKIs) for management by objectives (MBO) and to estimate their weights for hospital nurses. Methods: The PEKIs were developed by selecting preliminary indicators from a literature review, examining content validity and identifying their level of importance. Data were collected from November 14, 2007 to February 18, 2008. Data set for importance of indicators was obtained from 464 nurses and weights of PEKIs domain was from 453 nurses, who worked for at least 2 yr in one of three hospitals. Data were analyzed using $X^2$-test, factor analysis, and the Analytical Hierarchy Process. Results: Based upon Content Validity Index of .8 or above, 61 indicators were selected from the 100 preliminary indicators. Finally, 40 PEKIs were developed from the 61 indicators, and categorized into 10 domains. The highest weight of the 10 domains was customer satisfaction, which was followed by patient education, direct nursing care, profit increase, safety management, improvement of nursing quality, completeness of nursing records, enhancing competence of nurses, indirect nursing care, and cost reduction, in that order. Conclusion: PEKIs and their weights can be utilized for impartial evaluation and MBO for hospital nurses. Further research to verify PEKIs would lead to successful implementation of MBO.

The Comparative Software Development Cost Model Considering the Change in the Shape Parameter of the Erlang Distribution (어랑분포의 형상모수 변화에 따른 소프트웨어 개발 비용모형에 관한 비교 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.9 no.6
    • /
    • pp.566-572
    • /
    • 2016
  • Software Reliability implemented in software development is one of the most important issues. In finite failure NHPP software reliability models for software failure analysis, the hazard function that means a failure rate may have constant independently for failure time, non-increasing or non-decreasing pattern. In this study, software development cost analysis considering the variable shape parameter of Erlang distribution as the failure life distribution in the software product testing process was studied. The software failure model was applied finite failure Non-Homogeneous Poisson Procedure and the parameters approximation using maximum likelihood estimation was accompanied. Thus, this paper was presented comparative analysis by applying a software failure time data to the software, considering the shape parameter of Erlang distribution for development cost model analysis. When compared to the cost curve in accordance with the shape parameter, the model of smaller shape can be seen that the optimal software release time delay and more cost. Through this study, it is thought that it can serve as a preliminary information which can basically help the software developers to search for development cost according to software shape parameters.

Convolutional neural network of age-related trends digital radiographs of medial clavicle in a Thai population: a preliminary study

  • Phisamon Kengkard;Jirachaya Choovuthayakorn;Chollada Mahakkanukrauh;Nadee Chitapanarux;Pittayarat Intasuwan;Yanumart Malatong;Apichat Sinthubua;Patison Palee;Sakarat Na Lampang;Pasuk Mahakkanukrauh
    • Anatomy and Cell Biology
    • /
    • v.56 no.1
    • /
    • pp.86-93
    • /
    • 2023
  • Age at death estimation has always been a crucial yet challenging part of identification process in forensic field. The use of human skeletons have long been explored using the principle of macro and micro-architecture change in correlation with increasing age. The clavicle is recommended as the best candidate for accurate age estimation because of its accessibility, time to maturation and minimal effect from weight. Our study applies pre-trained convolutional neural network in order to achieve the most accurate and cost effective age estimation model using clavicular bone. The total of 988 clavicles of Thai population with known age and sex were radiographed using Kodak 9000 Extra-oral Imaging System. The radiographs then went through preprocessing protocol which include region of interest selection and quality assessment. Additional samples were generated using generative adversarial network. The total clavicular images used in this study were 3,999 which were then separated into training and test set, and the test set were subsequently categorized into 7 age groups. GoogLeNet was modified at two layers and fine tuned the parameters. The highest validation accuracy was 89.02% but the test set achieved only 30% accuracy. Our results show that the use of medial clavicular radiographs has a potential in the field of age at death estimation, thus, further study is recommended.

Rock/Soil proportion estimation using image processing technique (광학식 측정방법을 활용한 풍화지반 버럭의 암/토사 구성비율 추정방법)

  • Jin, Kyu-Nam;Jin, Kim-Young;Park, Sung-Wook;Cho, Gye-Choon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1425-1432
    • /
    • 2010
  • In large construction site, although soil conversion factor is so significant to preliminary design, operation design and calculating the cost of construction that it is important to take reasonable estimation and application, the standard of soil conversion factor for weathered ground doesn't clearly suggested yet. So in this study, at first we obtain the image using DSLR - high resolution camera and Laser scanner in the Haeng-Bok city constructin site, then analysis the ratio of soil and rock using various image processing method(Sobel method, Laplace method, Highpass filter, Hue and Saturation analysis). Mutual comparation with the result of image processing analysis and manual segmentation of 5case image in the cad. As a result, best image processing method was different for each case. In case of high propotion of rock, Laplace was best and in case of high propotion of soil, Highpass was best, and mixed case Laplace was best.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Analysis for External Cost of Nuclear Power Focusing on Additional Safety and Accident Risk Costs (추가안전대책비용, 사고위험대응비용의 외부비용을 반영한 원전비용 추정 연구)

  • Kim, Yoon Kyung;Cho, Sung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.22 no.2
    • /
    • pp.367-391
    • /
    • 2013
  • After the Fukushima nuclear accident, the external costs of generating electricity from nuclear power plants such as additional safety compliance costs and possible accident risk action costs have gained increasing attention from the public, policy-makers and politicians. Consequently, estimates of the external costs of nuclear power are very deliberate issue that is at the center of the controversy in Korea. In this paper, we try to calculate the external costs associated with the safety of the nuclear power plants, particularly focusing on additional safety compliance costs and possible accident risk action costs. To estimate the possible accident risk action costs, we adopt the damages expectation approach that is very similar way from the external cost calculation of Japanese government after the Fukushima accident. In addition, to estimate additional safety compliance costs, we apply the levelized cost of generation method. Furthermore, we perform the sensitivity analysis to examine how much these social costs increase the electricity price rate. Estimation results of the additional security measure cost is 0.53Won/kWh ~ 0.80Won/kWh depending on the capacity factor, giving little change on the nuclear power generation cost. The estimates of possible accident risk action costs could be in the wide range depending on the different damages of the nuclear power accident, probability of the severe nuclear power accident and the capacity factor. The preliminary results show that it is 0.0025Won/kWh ~ 26.4188Won/kWh. After including those two external costs on the generation cost of a nuclear power plant, increasing rate of electricity price is 0.001%~10.0563% under the capacity factor from 70% to 90%. This paper tries to examine the external costs of nuclear power plants, so as to include it into the generation cost and the electricity price. This paper suggests one of the methodologies that we might internalize the nuclear power generations' external cost, including it into the internal generation cost.

Estimation of the Benefit from the Campaign to Prevent Drowsy Driving Crashes Using a Contingent Valuation Method (조건부 가치측정법을 이용한 고속도로 졸음운전 교통사고 예방 캠페인 편익 추정)

  • Park, Sangmin;Kim, Kyunghyun;Ko, Hangeom;Jung, Young Sick;Ryu, Jong Deug;Yun, Ilsoo
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.75-82
    • /
    • 2016
  • PURPOSES : This study was initiated to estimate the benefits from the campaign to prevent drowsy driving crashes on expressways. The study was conducted by the Korea Expressway Corporation using a contingent valuation method. METHODS : First, a questionnaire was designed for a preliminary survey. From the survey's results, the initial willingness to pay for the campaign was determined by averaging different amounts of payments chosen under virtual scenarios in the survey. The willingness to pay data was used to find a first bid price for the open-ended method used for the second survey. After that, a primary questionnaire was designed and conducted using a single dichotomous choice question (SDBCQ). Drivers at expressway resting areas were asked their willingness to pay for the campaign. Based on statistical analysis using data collected from the second survey, the mean willingness to pay was estimated using a probability utility function. Finally, the benefit from the campaign was calculated using the estimated willingness to pay and accident data on expressways. CONCLUSIONS : Based on the result from the contingent valuation method, the benefit from the campaign to prevent drowsy driving crashes was estimated to be 170.6 won per expressway trip. The benefit is to be paid as an additional toll. In addition, the traffic crash cost estimate is about 2,209,680,000 won less than the cost during the same period in 2014.

The Study for an Improved Methodology of Rail Investment Rating System (철도투자평가체계 개선방안의 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Jin, Hak-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2192-2204
    • /
    • 2011
  • Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.

  • PDF