• Title/Summary/Keyword: Preliminary Construction Cost

Search Result 125, Processing Time 0.023 seconds

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.

A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway (실적공사비에 의한 지하철 공사비 예측모형에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae;Park, Hong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2013
  • This study proposed cost prediction equation model by considering duration, construction, size, actual cost with the subway construction started by the actual cost system which was introduced since 2004. Costs - scale exponent n(confidence range: 0.5 to 0.7) for cost prediction of subway construction was drawn total cost(0.713), net cost(0.77) in point of the 11 subway construction data. The cost prediction equation model of the subway construction which was presented in this study is able to effectively apply to business planning, preliminary investigation, feasibility study, basic design stage to estimate the approximate cost in the future.

A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market (공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구)

  • Kim Min-Kee;Shin Sung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.265-270
    • /
    • 2002
  • Frequent design changes or unnecessary project executions due to illogical practice, lack of feasibility study and, hasty drive have raised problems of budget waste in Korean construction projects. Since the MOCT (Ministry of Construction & Transportation) published Master Plan for budget efficiency for government projects, there have been a lot of policy efforts for budget saving. However, it has been pointed out that cost management at the pre-construction phase, which greatly influences the cost still remains imperfect. The target cost for government clients is not being estimated reasonably, and cost controlling at the pre-construction phase is not yet being carried out properly for keeping the budget. Therefore, improved construction cost management at the pre-construction phase was proposed in this paper. The cost management systems of advanced countries were investigated for it, and the issues were drawn from the cost management systems of these countries. On the basis of the issues, the present conditions and problems of domestic construction cost management at the pre-construction phase were analyzed for suggestion.

  • PDF

Analysis of Factors Increasing Construction Cost for the Curtain-wall Accompanied by the Installation of a Guide Rail for High-rise Building Maintenance (초고층 외벽 유지관리용 Guide Rail 설치에 따른 커튼월 공사비 증가요인 분석)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.97-98
    • /
    • 2011
  • The number of high-rise buildings has increased year after year, with there currently being 5 projects in progress to construct buildings higher than 100 stories in Seoul alone. The construction cost for such high-rise buildings is significantly higher than the cost for a conventional low-rise building, while maintenance costs are expected to be two to three times higher. To reduce the maintenance cost of a high-rise building, there is the need for a guide rail to be used for maintenance, which is why there is the need for research on the guide rail system. For this reason, as preliminary research to develop a guide rail, this study aims to derive the factors increasing construction cost by taking the installation of a guide rail into account. This is expected to lay the groundwork for the design and construction of guide rails for high-rise building maintenance.

  • PDF

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

Development of the Preliminary Cost Estimate Method for the Free-Form Building Facade Trade in Conjunction with the Panel Optimization Algorithm Process (곡면 최적화 알고리즘을 활용한 비정형 건축물 외장공사비 개산견적에 관한 연구)

  • Lim, Jang Sik;Ock, Jong Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.95-106
    • /
    • 2014
  • The outer surfaces of free form buildings contain panels with two-directional curvatures. To construct these panels, complex geometric surfaces should be divided into forms and sizes that can be manufactured and constructed efficiently. Because the bigger the curvatures of these panel, the more expensive the construction costs, these complex curvatures should go through optimal process of reinterpretation to minimize the curved surfaces with complex two-directional curvatures, which is called panel optimization. Small construction and design companies have trouble in calculating even rough estimate and cannot adjust expected construction cost of the panels based on comparison of design alternatives in conjunction with panel optimization process due to lack of knowledge and experience. This study conducts the research that can support designers' cost decision-making in the design stage of the free form buildings with respect to the panel optimization process. A 3D commercial application specialized to modeling free form shapes is used for the purpose.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF