A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

A Study on the Optimal Setting of Large Uncharged Hole Boring Machine for Reducing Blast-induced Vibration Using Deep Learning (터널 발파 진동 저감을 위한 대구경 무장약공 천공 장비의 최적 세팅조건 산정을 위한 딥러닝 적용에 관한 연구)

  • Kim, Min-Seong;Lee, Je-Kyum;Choi, Yo-Hyun;Kim, Seon-Hong;Jeong, Keon-Woong;Kim, Ki-Lim;Lee, Sean Seungwon
    • Explosives and Blasting
    • /
    • v.38 no.4
    • /
    • pp.16-25
    • /
    • 2020
  • Multi-setting smart-investigation of the ground and large uncharged hole boring (MSP) method to reduce the blast-induced vibration in a tunnel excavation is carried out over 50m of long-distance boring in a horizontal direction and thus has been accompanied by deviations in boring alignment because of the heavy and one-directional rotation of the rod. Therefore, the deviation has been adjusted through the boring machine's variable setting rely on the previous construction records and expert's experience. However, the geological characteristics, machine conditions, and inexperienced workers have caused significant deviation from the target alignment. The excessive deviation from the boring target may cause a delay in the construction schedule and economic losses. A deep learning-based prediction model has been developed to discover an ideal initial setting of the MSP machine. Dropout, early stopping, pre-training techniques have been employed to prevent overfitting in the training phase and, significantly improved the prediction results. These results showed the high possibility of developing the model to suggest the boring machine's optimum initial setting. We expect that optimized setting guidelines can be further developed through the continuous addition of the data and the additional consideration of the other factors.

Comparison of the RMR Ratings by Tunnel Face Mappings and Horizontal Pre-borings at the Fault Zone in a Tunnel (터널 단층대에서 수평시추와 막장관찰에 의한 RMR값의 비교 분석)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.39-46
    • /
    • 2005
  • The RMR ratings, one by horizontal pre-boring in a tunnel and another by tunnel face mapping, are compared at the fault zone in a tunnel. Generally. the horizontal pre-borings were so effective as to forecast reasonably the supporting patterns after tunnel excavation. But the maximum difference in RMR ratings estimated by two methods was about 50 at a certain section of a tunnel. The differences were analyzed on each parameter of the RMR system: the rating differences were 24 in the condition of discontinuities, 15 in the RQD and 13 in the uniaxial compressive strength of rock. To minimize the gap between RMR by pre-borings and by face mappings, it is necessary to select the horizontal pre-boring location where tunnel stability could be critical and to evaluate in detail the sub-parameters of the condition of discontinuities.

Downward Method of H-PILE Alternative Materials of Percusion Rotary Drill (PRD시공시 H-PILE 대체 자재로 원가절감 할수 있는 공법 사례)

  • Lee, Wang-Hee;Lee, Il-Jae;Iim, Si-Nae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.199-202
    • /
    • 2014
  • In recent years the downtown, Top-down method has been applied in a major method to solve the complaints due to noise, vibration, dust and safety issues such as cracking due to settlement when the excavation close to the building. Until it is installed underground permanent foundation, the Pre-founded Column is a pile foundation as well as a column to bear the upper construction load. The Pre-founded Column is constructed by PRD method generally. The EnP(Enlarging Pile) method can be expanded locally boring diameter of the embedment zone as compared to the PRD method existing general. Since the bearing capacity is increased by the boring diameter is expanded, the embedment length is reduced, the construction cost is reduced.

  • PDF

Sedimentary profile of Youngjong-North tidal flat (영종북 갯벌의 퇴적 단면 구조)

  • Lee, Yun-Hwa
    • The Korean Journal of Quaternary Research
    • /
    • v.20 no.1 s.26
    • /
    • pp.1-8
    • /
    • 2006
  • Many boring investigations were achieved in Youngjong-North tidal flat to construct the Incheon International Airport Expressway. Vertical sedimentary profile of this tidal flat has been studied by analyzing these boring data. The deposits of Youngjong-North tidal flat are about 30 meters thick, and the sedimentary layers consist of basal gravel, lower mud, middle silt, middle mud, and upper silt layers in ascending order. Semi-consolidated and oxidized belt with yellowish brown color, which appears above or within middle mud layer, exists in $-3{\sim}-5$ meters altitude. There are some stratigraphical problems to admit the top surface of this oxidized belt as the unconformity surface between Holocene and Pre-Holocene tidal flat deposit.

  • PDF

A Study on Development of PHC pile driving force increase device on soft ground (연약지반상 PHC파일 항타력 증대장치 개발에 관한연구)

  • Kim, Jong-Gil;Lee, Young-Joo
    • Journal of Digital Convergence
    • /
    • v.18 no.10
    • /
    • pp.219-224
    • /
    • 2020
  • The purpose of this study is to develop a device to replace the pre-boring method, which is generally constructed, to prevent pile damage caused by tension cracks that reason from tension waves generated during PHC pile construction on soft ground. Tension cracks are caused by tension waves from the hammer striking during the PHC pile hitting on the soft ground, which in turn leads to faulty construction. In order to prevent the occurrence of tension waves generated during driving, apply separate driving force increasing device to prevent the generation of tension waves, and pile damage as well. Also, it is an eco-friendly construction method that reduces smoke and noise by improving construction speed, reducing construction costs, and able to small equipment when developing equipment. This development equipment is a piece of effective equipment that can pioneer the Saemangeum reclamation area, the South-east Asian construction market, where the Deep soft ground is distributed.

A Study on the Precision Hole Machiningof Pre Hardened Mould Steel (프리하든 금형강의 정밀 홀 가공에 관한 연구)

  • Lee, Seung-Chul;Cho, Gyu-Jae;Park, Jong-Nam
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.11 no.2
    • /
    • pp.98-104
    • /
    • 2012
  • In this paper, precision processing is carried out for the pre hardened steel(HRC 54), which is one of injection mould materials. Processing characteristics are estimated according to the number of tool cutting blade and roundness is observed by the 3-Dimensional measuring machine. The surface roughness affected by the wire electric discharge machining are measured. Cutting component force of STAVOX is the highest in condition of 2F processing because load per a blade of cutting tool is high. Especially, the difference in Fz is over 20N by cutting load. The slower spindle rotation speed and tool feed rate are, the better cutting component force is. The roundness of hole processed in condition of 4F is good because feed rate is able to be fast. When rotation speed is increased, the surface roughness is decreased. The surface roughness acquired in condition of 2F processing is higher about 50% than 4F processing.

Study on the Rational Construction Method Using Analysis of the Case Study of PHC Pile Foundation in Song-Do Area (송도지역 내 PHC 말뚝기초 적용사례분석을 통한 적정 시공방법 연구)

  • Lee, Byengho;Lee, Jonghwi;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.3
    • /
    • pp.55-61
    • /
    • 2011
  • Song-Do international city is the area developed in large-scale land reclamation. Song-Do area consists of reclamation layer, sedimentary layer(loose silt, soft clay and sand alternating) and residual layer from the ground surface. Therefore, using pile foundation is inevitable to build structures safely. In this area, driven PHC piles have been generally constructed in terms of environmental and economic conditions. As a result of analyzing 4 sites in Song-Do district 5 and 7 recently, the method of driving pile has many problems because of existence of rigid soil in sedimentary layer and installation of more than 30m piles. In this case, when installing piles by drive after pre-boring up to appropriate depth, the results of constructability analysis were very good. And in the economic efficiency, although 4% of construction cost rose, it was a very slight increase in comparison with improvement of workability. In the case of the stability, more than 70% compared to the allowable stress of piles was satisfied through the load test. As a result, when PHC piles is installed in Song-Do district, the proper construction method is that piles are located at bearing layer after boring rigid sand layer.

A Study On a Method of Improvement From Domestic NATM Case (NATM 시공 사고 사례에 의한 개선방안 연구)

  • 이상웅
    • Explosives and Blasting
    • /
    • v.13 no.3
    • /
    • pp.19-30
    • /
    • 1995
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly, we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data. Poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for setting technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites having occured accidents is badly geological survey, nonconfirmationi of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are Summarised as follows : 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre0boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel . 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring management, should be posted at field.

  • PDF

A Study on a Method of Improvement from Domestic NATM Case (국내 NATM시공 사고사례에 의한 개선방안 연구)

  • 김무일;이상웅
    • Journal of the Korean Society of Safety
    • /
    • v.9 no.4
    • /
    • pp.92-102
    • /
    • 1994
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data, poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for settling technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites haying occured accidents is badly geological survey, nonconfirmation of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are summarised as follows ; 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre-boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel. 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring managements, should be posted at field.