A Study On a Method of Improvement From Domestic NATM Case

NATM 시공 사고 사례에 의한 개선방안 연구

  • 이상웅 ((사) 한국 건설안전기술협회 대리)
  • Published : 1995.09.01

Abstract

NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly, we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data. Poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for setting technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites having occured accidents is badly geological survey, nonconfirmationi of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are Summarised as follows : 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre0boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel . 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring management, should be posted at field.

Keywords