• Title/Summary/Keyword: Power Plant Park

Search Result 1,384, Processing Time 0.028 seconds

Research on the Maintenance Method to Improve the Reliability of Control System in Thermal Power Plant (화력발전소 제어시스템 신뢰도 향상을 위한 전자카드 운영 방법 연구)

  • Shin, Young-Jin;Park, Doo-Yong;Kim, Ho-Yol
    • Proceedings of the KIEE Conference
    • /
    • 2006.04a
    • /
    • pp.240-242
    • /
    • 2006
  • The inspection method, which is used to inspect the electronic system for the control system of the fossil-powered thermal power plant, has the technical restrictions based on its primary application area, whereas the reliability is requested more and more by the plant operators to minimize the shutdown of a plant. This paper reviews the inspection methods currently used by the thermal power plant and how to adopt the condition based maintenance to increase the availability of power plant.

  • PDF

Development of Start·Stop Control System at Water Turbine Generator for Tidal Power Plant (조력발전소를 위한 수차발전기의 기동·정지 제어시스템 개발)

  • Cho, Byong-Og;Park, Chul-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.106-112
    • /
    • 2014
  • Recently, tidal power generation has gained much attention. South Korea's tidal power generation systems were imported from abroad by turnkey type and have being operated. Therefore, for efficient operation and technological independence of a tidal power system, development of core technology is required. This paper deals with the start stop control system of water turbine generator in the tidal power plant, as one of our development project results. Using the SCADA system, the status and operations of water turbine generator in the tidal power plant, as well as simulation for calculation of maximum power were carried out. A small model type of start stop control device was also developed. In addition, the control system in Sihwa tidal power plant was modeled, and the results obtained by the dynamic simulation were given in graphics by 2D simulator.

Study on the Multi-measuring Method for Evaluation of Internal Leak of Power Plant Valve (발전용 밸브누설 평가를 위한 다중계측 연구)

  • Lee, S.G.;Park, S.K.;Park, J.H.;Kim, K.H.;Kim, Y.B.
    • Journal of Power System Engineering
    • /
    • v.11 no.3
    • /
    • pp.35-40
    • /
    • 2007
  • Leak would happen because of the damage of high temperature and high-pressure valve in nuclear power plant. condition based prevention maintenance is essential by using the suitable method based on local condition. Energy loss prevention can prevent from an accurate test, Local actually and ability. The methods of test for high energy fluid leak at present are analysis of ${\Delta}T$, AE(Acoustic Emission) analysis, and thermal image. The result for test of secondary system in nuclear power plant Unit reveals that the AE occurred clearly in leakage situation, but thermal image didn't occur. It is identified that leak is occurred when the orifice located front and back of valve operates. It shows that making a impatient judgment by using the single method if it is leakage is containing uncertainty. So we think that using the Multi-Measuring method is more sound judgment than single-measuring method.

  • PDF

Indoor Localization System for Field Robot System of Power Plant Facilities Surveillance (발전 설비 감시 점검용 로봇 시스템을 위한 실내 위치 인식 시스템 설계)

  • Jeong, Chang-Ki;Lee, Jae-Kyung;Park, Joon-Young;Cho, Byung-Hak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2308-2312
    • /
    • 2008
  • As power plant facilities are being deteriorated, their safety is getting more important, and more routine surveillance is being required. For this purpose, this paper presents an indoor localization system for field robot system which performs the surveillance of power plant facilities instead of human workers from the viewpoint of the workers' safety and work efficiency.

Boiler Performance Characteristics Change by UC Contents Increase for Coal Fired Power Plant (석탄연소 화력발전소에서 미연탄소분 농도 증가가 보일러 성능에 미치는 영향에 관한 연구)

  • Kim, Taehyung;Park, Byungchul
    • 한국연소학회:학술대회논문집
    • /
    • 2015.12a
    • /
    • pp.99-102
    • /
    • 2015
  • To operate coal fired power plant efficiently is considered unburned carbon as important factor. But, unburned carbon contents change does not have an impact on Boiler performance simultaneously. we evaluated that unburned carbon contents change had an little influence on unburned carbon loss change for performance side at a real power plant.

  • PDF

Development of Uldolmok Tidal Current Energy (울돌목 조류에너지 개발 현황과 전망)

  • Lee Kwang-Soo;Yum Ki-Dai;Park Jin Soon;Kang Sok Kuh;Park Woo-Sun;Han Sang-Hun;Jung Gong-Il;Park Jung Woo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.512-515
    • /
    • 2005
  • The Korean peninsula has a number of coastal sites where the rhythmic rising and lowering of water surface due to tides result in strong tidal current. The kinetic energy of these currents can be efficiently exploited by using tidal current turbines. The pilot tidal current power plant is to be constructed at the Uldolmok between Chindo and Haenam. Extensive coastal engineer ing research works have been carried out. This paper describes some observation results of field campaign, design of the supporting structure of a pilot plant of 1,000kW and a future tidal current power plant and so on.

  • PDF

The Development of Boiler Feedwater Master Control System for Power Plant (발전소 보일러 급수 주제어 시스템의 개발)

  • Lim, Gun-Pyo;Park, Doo-Yong;Kim, Jong-Ahn;Lee, Heung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.3
    • /
    • pp.442-450
    • /
    • 2012
  • Almost domestic power plants are being operated by foreign distributed control system. Many korean power plants are being operated over their lifetime so they need to be retrofitted. So we are developing the distributed control system to solve this problem by our own technique. The simulator was already made to verify the reliability of the algorithms. The unit loop function tests of all algorithms were finished in the actual distributed control system for installation of power plant and their results were satisfactory. The unit loop function tests are for each unit equipment algorithm. So the total operation tests will be made with all algorithms together in the actual distributed control system to be applied to power plant. When the verification through all tests is finished, algorithms with hardware will be scheduled to be installed and operated in the actual power plant. This research result will contribute to the safe operation of the deteriorated power plant and korean electric power supply as well as domestic technical progress. This entire processes and results for the development are written for the example of boiler feedwater master algorithm out of all algorithms in this paper.

Simulation and Data Sampling Modelling for 1000MW Boiler Process (1000MW 보일러 프로세스의 모델링과 데이터 추출 및 시뮬레이션)

  • Park, Doo-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.301-302
    • /
    • 2007
  • Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

  • PDF

Study on The Development of Basic Simulation Network for Operational Transient Analysis of The CANDU Power Plant

  • Park, Jong-Woon;Lim, Jae-cheon;Suh, Jae-seung;Chung, Ji-bum;Kim, Sung-Bae
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.10a
    • /
    • pp.423-428
    • /
    • 1995
  • Simulation models have been developed to predict the overall behavior of the CANDU plant systems during normal operational transients. For real time simulation purpose, simplified thermal hydraulic models are applied with appropriate system control logics, which include primary heat transport system solver with its component models and secondary side system models. The secondary side models are mainly used to provide boundary conditions for primary system calculation and to accomodate plant power control logics. Also, for the effective use of simulation package, hardware oriented basic simulation network has been established with appropriate graphic display system. Through validation with typical plant power maneuvering cases using proven plant performance analysis computer code, the present simulation package shows reasonable capability in the prediction of the dynamic behavior of plant variables during operational transients of CANDU plant, which means that this simulation tool can be utilized as a basic framework for full scope simulation network through further improvements.

  • PDF

A Study on the Application Method of Configuration Baseline for Nuclear Power Plant (원전 형상기준선 적용방안에 관한 연구)

  • Park, You-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.199-200
    • /
    • 2017
  • The Configuration Management(CM) of Nuclear Power Plant(NPP) is an activity that maintains consistency among the design requirement, facility configuration information and physical configuration. It is a systematic approach to performing various engineering tasks such as change management by identifying, documenting the characteristics of plant Structures, Systems and Component(SSC). The first activity that should be performed the configuration baseline setting at the start of project. The configuration baseline of the NPP construction phase is the status of the SSC of the plant at a specified process and time, and the actual configuration changes depending on the condition of plant. In this paper, I have studied the current status of configuration baseline used in the software industry and general plant industry, method of establishment for the configuration baseline which was first applied to the construction of NPP.

  • PDF