• 제목/요약/키워드: Power Generator

검색결과 3,837건 처리시간 0.024초

화학 플랜트에서의 비상발전기 용량선정 방안(PG3)에 관한 연구 (Study on Emergency Generator Capacity Selection(PG3) in the Chemical Plant)

  • 이승재;조만영;김세용;김은태;강병욱;박한민;김재철
    • 조명전기설비학회논문지
    • /
    • 제29권12호
    • /
    • pp.55-60
    • /
    • 2015
  • PG and RG methods are widely known method for calculating the capacity of the emergency generator in construction electrical installation. PG and RG methods are mainly used as a saving a life, fire protection, fire fighting in construction. Because no long distance between the emergency generator and electric motor feeder, the relatively small motor power in construction electrical installation, the capacity of generator in PG and RG methods are little problem of voltage and reactive power of generator. However in many cases the application of the PG and RG method is difficult in the Chemical Plant because it is long distance between the generator and the motor Feeder and motor capacity is very large. Motor starting power factor is about 0.2 lagging power factor and motor starting current is about 6times during motor staring. Also Most of the staring current component is a reactive power component. therefore, it is many cases that lack of reactive power and excess of allowable voltage drop limit and After selection of emergency diesel generator, problems happen during motor starting. Therefore, to be selection of effective emergency generator, active generator power, reactive power and the required reactive power during large motor starting should be considered in chemical plant. It is also required of the verification process through simulation because hand calculation is very difficult considering study cases.

Critical Characteristics Estimation of a Large-Scale HTS Wind Turbine Generator Using a Performance Evaluation System

  • Kim, Taewon;Woo, Sang-Kyun;Kim, Changhyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권3호
    • /
    • pp.229-233
    • /
    • 2019
  • Large-scale High Temperature Superconducting (HTS) wind power generators suffer from high electromagnetic force and high torque due to their high current density and low rotational speed. Therefore, the torque and Lorentz force of HTS wind power generators should be carefully investigated. In this paper, we proposed a Performance Evaluation System (PES) to physically test the structural stability of HTS coils with high torque before fabricating the generator. The PES is composed of the part of a pole-pair of the HTS generator for estimating the characteristic of the HTS coil. The 10 MW HTS generator and PES were analyzed using a 3D finite element method software. The performance of the HTS coil was evaluated by comparing the magnetic field distributions, the output power, and torque values of the 10 MW HTS generator and the PES. The magnetic flux densities, output power, and torque values of the HTS coils in the PES were the same as a pole-pair of the 10 MW HTS generator. Therefore, the PES-based evaluation method proposed in this paper can be used to estimate the critical characteristics of the HTS generator under high magnetic field and high torque before manufacturing the HTS wind turbines. These results will be used effectively to research and manufacture large-scale HTS wind turbine generators.

해양 소수력발전용 유도발전기의 최적 무효전력 산정방식에 관한 연구 (A Study on the Optimal Reactive Power Calculation Method of Induction Generator for Marine Small Hydraulic Power)

  • 이원재;오용택
    • 조명전기설비학회논문지
    • /
    • 제27권9호
    • /
    • pp.100-107
    • /
    • 2013
  • Since the West Sea experiences a big difference in tides, the output power of the small marine hydroelectric power plant varies with the tide. When an induction generator is used here for small hydroelectric power, the reactive power capacitor should be installed at the generator main bus to compensate for the changes in power. As such, the sizing method for the power compensation of the induction generator is reviewed and an optimal method for compensation is suggested. The self-excitation minimum capacitor capacity method, which prevents high voltages, and the power factor automatic control method, which retains a power factor of greater than 90% are reviewed. The compensation effect of reactive power is confirmed through a case study.

비상디젤발전기 엔진 상태진단 초음파 탐촉자 개발 (Development of Ultrasonic Sensor for Engine Condition Diagnosis of EDG)

  • 이상국;최광희
    • 동력기계공학회지
    • /
    • 제17권4호
    • /
    • pp.31-35
    • /
    • 2013
  • The emergency AC power supply system of the nuclear power plant is designed to supply the power to the nuclear power plant at the emergency operating condition. The safety function of the diesel generator at the nuclear power plant is to supply AC electric power to the safety system whenever the preferred AC power supply is unavailable. The reliable operation of onsite standby diesel generator should be ensured by a condition monitoring system designed to maintain, monitor and forecast the reliability level of diesel generator. The purpose of this paper is to improve the existing ultrasonic sensor used for condition diagnosis of engine fuel pump and cylinder head for the accurate diagnosis in actual engine condition of emergency diesel generator(EDG). As a result of this study, we could design and develop much more reliable ultrasonic sensor than existing ones.

발전기의 사고 시뮬레이션과 분석 (Fault Simulation and Analysis of Generator)

  • 박철원;오용택
    • 전기학회논문지P
    • /
    • 제62권3호
    • /
    • pp.151-158
    • /
    • 2013
  • Large generator of power plant is very important. In order to protect large generator from faults, digital protective relay or IED is required. However, all protective relays for generators of the domestic power plant are operated by foreign products. And now, for technological independence from foreign and improvement of import substitution effect, IEDs using domestic technology are being developed. To evaluate performance of developing next-generation power devices, the study of the dynamic characteristics of the power plant, generator system modeling, fault simulation and analysis, should be considered. Specially, To obtain IEEE Standards COMTRADE format for relay operation test, generator system modeling and fault simulation using PSCAD/EMTDC tools must be preceded. Until now, a complete modeling of generator internal windings and fault simulation techniques dose not exist. In this paper, for evaluation performance of relay elements of developing IED, the generator system modeling and various faults simulation using PSCAD/EMTDC tools were performed. And then, the various transient phenomena through obtained relaying signal of developed modeling were analyzed.

30 kVA 초전도 발전기의 소용량 부하 인가시 운전특성 해석 (Performance Analysis of 30 kVA Super-Conducting Generator under Light Load)

  • 하경덕;황돈하;박도영;김용주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 A
    • /
    • pp.271-273
    • /
    • 1999
  • In this paper 30 kVA Super-Conducting Generator's test and analysis results of OCC and SCC are presented. Also the test and FE analysis results of the generator under 1.2, 2.4, and 3.6[kW] load are described. For FE analysis of the generator's performance, the external circuit is coupled with the FE region. The generator's end winding reactance is obtained based on the design data, actual dimension, preliminary FE analysis, and empirical formulas. The comparison of FE analysis coupled with external circuit to the test results shows a good agreement.

  • PDF

유도발전기 역률 보상 콘덴서와 직렬 리액터의 동작 분석 (Operating Analysis of Power Factor Compensation Condenser and Series Reactor in the Induction Generator)

  • 김종겸;박영진
    • 전기학회논문지
    • /
    • 제66권3호
    • /
    • pp.593-598
    • /
    • 2017
  • Induction generator is always required reactive power in order to generate a rotating magnetic field as an inductive load. The reactive power must be continuously supplied to the induction generator as well as load of distribution system from the power supply side. So the power factor of the power supply side during the induction generation operation is low. Condenser is installed in order to raise the low power factor of the induction generator. Switching transients occurs when the power supply of the capacitor is turned on in order to ensure the low power factor. When using the reactor in series with the capacitor in order to reduce the influence of switching transient, it can affect the reactive power by the condenser voltage rises. In this study, we analyzed the operating characteristics for power and power factor of induction generator in accordance with the presence or absence of the application of the serial reactors for switching transients reduction of the condenser and the condenser for power factor correction.

PC기반 치과 CT용 고전압 펄스 발생장치 개발 (Development of PC based High Voltage Generator for Dental CT)

  • 김학성;오준용;송상훈;원충연
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2008년도 하계학술대회 논문집
    • /
    • pp.580-582
    • /
    • 2008
  • The object of this paper is develope the PC based controlled high voltage power supply and studies 1.2kW(120kV, 10mA) pulse power X-ray generator possible to adapt fluoroscopy of Dental CT X-ray generator and industrial X-ray pulse power equipment. The developed pulse power X-ray generator consisted of mono-block tank include X-ray tube and high voltage X-ray power supply circuit and high voltage control unit with RS232C/422 communication port. The PC control program of pulse power X-ray generator uses LabVIEW, and the size of high voltage transformer and high voltage generator is minimized by high voltage high frequency inverter has 100kHz switching frequency. Also this paper shows result of X-ray tube voltage and tube current correspond to variable load.

  • PDF

Methodology for Determining of Generator Operation Point for Ensuring Voltage Stability Against Generator Faults in Jeju-Haenam HVDC System

  • Kang, Sang-Gyun;Seo, Sang-Soo;Lee, Byong-Jun;Joo, Joon-Young
    • Journal of Electrical Engineering and Technology
    • /
    • 제5권1호
    • /
    • pp.54-60
    • /
    • 2010
  • This paper presents a new algorithm for determining generator operation point for maintaining stability considering generator faults in Jeju-Haenam HVDC system. As the HVDC system consumes reactive power for the transmission of active power substantially, compensation of reactive power is essential. And the HVDC system is operated on frequency control mode. That is to say, the HVDC system almost manages system frequency. Therefore, we recognized that the Jeju system could be unstable if the reactive power consumed by the HVDC is insufficient when out-of-step occurs with large generators. When the solution of power flow analysis does not converge due to the unstable system phenomenon, we have difficulty in establishing countermeasures as the post-fault information is not available. In this paper, for the purpose of overcoming this difficulty in establishing countermeasures, we introduce the CPF(Continuation Power Flow) algorithm. This paper suggests an algorithm for calculating the output limitation of the generator to maintain the stability in case of generator fault in the Jeju system.

대용량유도전동기 기동시의 비상용 디젤발전기 동특성 해석 (Dynamic Analysis of Diesel Generators on Starting Large Induction Motors)

  • 한풍;조성돈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 정기총회 및 창립40주년기념 학술대회 학회본부
    • /
    • pp.139-142
    • /
    • 1987
  • It is important to evaluate the voltage characteristics of diesel generator as an emergency power supply in nuclear power plant. On loss of offsite power sources, emergency safeguard loads required to safely shutdown the reactor should be supplied by diesel generator. This paper presents the dynamic stability program to evaluate diesel generator performance as an emergency power system. The results Indicate the diesel generator ability to start the motors successfully seems to life in its impedances and inertias.

  • PDF