• 제목/요약/키워드: Power Flow problem

검색결과 422건 처리시간 0.035초

Leak flow prediction during loss of coolant accidents using deep fuzzy neural networks

  • Park, Ji Hun;An, Ye Ji;Yoo, Kwae Hwan;Na, Man Gyun
    • Nuclear Engineering and Technology
    • /
    • 제53권8호
    • /
    • pp.2547-2555
    • /
    • 2021
  • The frequency of reactor coolant leakage is expected to increase over the lifetime of a nuclear power plant owing to degradation mechanisms, such as flow-acceleration corrosion and stress corrosion cracking. When loss of coolant accidents (LOCAs) occur, several parameters change rapidly depending on the size and location of the cracks. In this study, leak flow during LOCAs is predicted using a deep fuzzy neural network (DFNN) model. The DFNN model is based on fuzzy neural network (FNN) modules and has a structure where the FNN modules are sequentially connected. Because the DFNN model is based on the FNN modules, the performance factors are the number of FNN modules and the parameters of the FNN module. These parameters are determined by a least-squares method combined with a genetic algorithm; the number of FNN modules is determined automatically by cross checking a fitness function using the verification dataset output to prevent an overfitting problem. To acquire the data of LOCAs, an optimized power reactor-1000 was simulated using a modular accident analysis program code. The predicted results of the DFNN model are found to be superior to those predicted in previous works. The leak flow prediction results obtained in this study will be useful to check the core integrity in nuclear power plant during LOCAs. This information is also expected to reduce the workload of the operators.

Maximization of Transmission System Loadability with Optimal FACTS Installation Strategy

  • Chang, Ya-Chin;Chang, Rung-Fang
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권5호
    • /
    • pp.991-1001
    • /
    • 2013
  • Instead of building new substations or transmission lines, proper installation of flexible AC transmission systems (FACTS) devices can make the transmission networks accommodate more power transfers with less expansion cost. In this paper, the problem to maximize power system loadability by optimally installing two types of FACTS devices, namely static var compensator (SVC) and thyristor controlled series compensator (TCSC), is formulated as a mixed discrete-continuous nonlinear optimization problem (MDCP). To reduce the complexity of the problem, the locations suitable for SVC and TCSC installations are first investigated with tangent vector technique and real power flow performance index (PI) sensitivity factor and, with the specified locations for SVC and TCSC installations, a set of schemes is formed. For each scheme with the specific locations for SVC and TCSC installations, the MDCP is reduced to a continuous nonlinear optimization problem and the computing efficiency can be largely improved. Finally, to cope with the technical and economic concerns simultaneously, the scheme with the biggest utilization index value is recommended. The IEEE-14 bus system and a practical power system are used to validate the proposed method.

발전소용 Y형 체크밸브에 관한 수치해석 연구 (Numerical Analysis of Y-shaped Check Valve for Power Plant)

  • 이재훈;김시범;전락원;이근호
    • 한국기계가공학회지
    • /
    • 제15권1호
    • /
    • pp.129-135
    • /
    • 2016
  • Various type of valves are manufactured for different industrial uses. Among them, check valves are used to allow fluid to flow in one direction but not in the opposite direction. There are many different types of check valves, but Y-shaped check valves are widely used these days. Not many studies have been carried out on Y-shaped check valves and the flow coefficients obtained through numerical analysis have the problem of low reliability. In order to solve this problem, this study performed flow analysis, flow-structure coupled analysis, and flow coefficient measurement experimentally, and through these analyses derived and verified the flow coefficients and assessed the structural safety based on numerical analysis.

원자력 발전소 배관계 글로브 밸브의 고주파 진동 원인 분석 및 해결 사례 (A Case Study of Root Cause Analyses and Remedies for High frequency Vibration of Globe Valve in Nuclear Power Plant Piping System)

  • 최병화;박수일;전창빈
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2005년도 추계학술대회논문집
    • /
    • pp.394-399
    • /
    • 2005
  • A case history is presented pertaining to high frequency piping vibration and noise caused by globe valve in the spent fuel pool cooling system of nuclear power plant. Frequency analyses were performed on the system to diagnose the problem and develop a solution to reduce the piping vibration and noise. The source of the high frequency and noise energy was traced to the globe valve located immediately downstream of the centrifugal pump by performing valve throttling test. Measurements of vibration and noise are presented to show that the high frequency vibration and noise amplitude was dependent upon the valve disc position and flow rate. Strouhal vortex shedding frequencies were generated at the exit of the globe valve which exited structural resonance of valve disc and amplified the high frequency vibration and noise. The problem was identified as an interaction between the flow inside globe valve and the valve disc structure. Attempts to reduce the vibration and noise amplitudes of the piping system were successfully achieved by the modification of guide-disc diameter and disc-edge figure The valve disc was replaced by an alternative to eliminate the source of the harmful high frequency vibration and noise.

  • PDF

Power Flow Calculation Method of DC Distribution Network for Actual Power System

  • Kim, Juyong;Cho, Jintae;Kim, Hongjoo;Cho, Youngpyo;Lee, Hansang
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제6권4호
    • /
    • pp.419-425
    • /
    • 2020
  • DC distribution system has been evaluated as an excellent one in comparison with existing AC distribution network because it needs fewer power conversion stages and the full capacity of the equipment can be used without consideration for power factor. Recently, research and development on the implementation of DC distribution networks have been progressed globally based on the rapid advancement in power-electronics technology, and the technological developments from the viewpoint of infrastructure are also in progress. However, to configure a distribution network which is a distribution line for DC, more accurate and rapid introduction of analysis technology is needed for the monitoring, control and operation of the system, which ensure the system run flexible and efficiently. However, in case of a bipolar DC distribution network, there are two buses acting as slack buses, so the Jacobian matrix cannot be configured. Without solving this problem, DC distribution network cannot be operated when the network is unbalanced. Therefore, this paper presented a comprehensive method of analysis with consideration of operating elements which are directly connected between neutral electric potential caused by the unbalanced of load in DC distribution network with bipolar structure.

Optimal Power Flow with Discontinous Fuel Cost Functions Using Decomposed GA Coordinated with Shunt FACTS

  • Mahdad, Belkacem;Srairi, K.;Bouktir, T.;Benbouzid, M.EL.
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권4호
    • /
    • pp.457-466
    • /
    • 2009
  • This paper presents efficient parallel genetic algorithm (EPGA) based decomposed network for optimal power flow with various kinds of objective functions such as those including prohibited zones, multiple fuels, and multiple areas. Two coordinated sub problems are proposed: the first sub problem is an active power dispatch (APD) based parallel GA; a global database generated containing the best partitioned network: the second subproblem is an optimal setting of control variables such as generators voltages, tap position of tap changing transformers, and the dynamic reactive power of SVC Controllers installed at a critical buses. The proposed approach tested on IEEE 6-bus, IEEE 30-bus and to 15 generating units and compared with global optimization methods (GA, DE, FGA, PSO, MDE, ICA-PSO). The results show that the proposed approach can converge to the near solution and obtain a competitive solution with a reasonable time.

케비테이션 제트 유동을 이용한 발전 시스템 (A Power-Generation System using Cavitation jet flow)

  • 나정수;이강주;이봉렬;주남식
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.162.1-162.1
    • /
    • 2010
  • Cavitation phenomenon has long been a difficult problem that regarded as negative event to fluid machines or industrial facilities. In the latest, however, some engineers became to understand the power of cavitation and use it to cleaning wall after developing cavitation nozzle. In this paper, we introduce new concept for power-generation system using cavitation jet flow maid by nozzle and impulse turbine in vacuum condition. The vacuum needed to make cavitation is generated naturally by Torricelli's vacuum, 10.23m effective head drop without additional power. We analyzed water's boiling and the steam's mean free path according to vacuum purity levels for nozzles and turbine blades. The nozzles make water accelerate in the neck and boil in expansion section of the nozzles. The shape of the impulse turbine is designed for absorption of the molecule's kinetic energy of the steam.

  • PDF

입찰함수에 의한 전력거래에서의 최적조류 계산에 의한 혼잡비용 처리연구 (A Study on the Congestion Management by OPF in the Electricity Power Market with the Bidding Function)

  • 김광호;정재옥
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권8호
    • /
    • pp.374-379
    • /
    • 2000
  • The nodal marginal cost and the congestion charge are used as the econimic signals for the electricity price and new invetments in deregulated power systems. In this paper, the nodal marginal cost and the congestion charge are calculated by using the shadow prices resulted from the calculation of Optimal Power Flow(OPF). Linearization of inequality constraints and piecewise linear cost functions make an OPF problem LP-based forms. In order to use the shadow price, the Interior Point(IP) algorithm is applied as a solution technique to the formulation. This paper proposes an algorithm to determine efficients initial points which are guaranteed to be interior points.

  • PDF

계통손실 감소를 위한 전력용 콘덴서의 適正 再配置에 대한 연구 (A Study on the System Loss Minimizing Algorithm by Optimal Re-location of Static Condenser Using System Power Loss Sensitivity)

  • 이상중;김건중;정태호;김원겸;김용배
    • 대한전기학회논문지
    • /
    • 제44권1호
    • /
    • pp.21-24
    • /
    • 1995
  • The larger and the more complicated the system size and configuration grow, the more serious the system loss problem becomes. Exessive system loss causes severs system voltage depression, which even may result in system voltage collapse. This paper proposes an effective tool for minimizing the system power loss by optimal re-location of the static condenser based on the system loss sensitivity index .lambda.$_{Q}$. It is possible to determine the optimal location and amount of VAR investment for minimizing the system loss by priority of .lambda.$_{Q}$ index given for each bus. Several computational techniques for avoiding divergency of the load flow solution are proposed. The loss sensitivity index .lambda.$_{Q}$ uses information of normal power flow equations and their Jacobians. Two case studies proved the effectiveness of the algorithm proposed.posed.

  • PDF

석탄화력발전소 보일러 튜브 마모 문제에 관한 저온공기 속도 측정법 적용 및 검증 (Application and Verification of Cold Air Velocity Technique for Solving Tube Ash Erosion Problem in PC Boilers)

  • 유기수;정권석
    • 대한기계학회논문집B
    • /
    • 제36권6호
    • /
    • pp.663-668
    • /
    • 2012
  • 비산회에 의한 보일러 튜브 마모 문제는 석탄화력 보일러 튜브 파손에 주요한 요인이 된다. 때문에 튜브 보호막이나 다공판 등이 마모 문제 완화를 위하여 사용되고 있다. 그러나 비산회에 의한 튜브마모 문제는 이런 방법을 통하여 완전히 해결될 수 없는데 이는 보일러 마다 유동 조건이 다를 뿐만아니라 예상치 못한 위치에서 국부적으로 마모가 심화될 수 있기 때문이다. 문제는 보일러 내부 비대칭 유동과 국부적 유속 증가에서 기인함으로 튜브 마모 문제의 해결에 있어서 보일러 내부 유동을 명확히 파악하는 것이 무엇 보다 중요하다 하겠다. 본 연구에서는 튜브 마모 문제에 해결을 위해 사용되는 Cold Air Velocity Technique(CAVT)에 대하여 고찰하고 하동화력 2호기 보일러에 대하여 CAVT를 실제 적용함으로써 석탄화력 보일러에 있어서 CAVT 적용 가능성을 검증하였다.