• Title/Summary/Keyword: Power Facility

Search Result 1,293, Processing Time 0.032 seconds

Design of Wideband Facility Power-line EMI filter (광대역 설비용 전원선 EMI 필터의 설계)

  • Chung, Se-Kyo;Lim, Jeong-Gyu;Kim, Mu-Hyun;Kang, Byoung-Kuk
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.14 no.6
    • /
    • pp.440-448
    • /
    • 2009
  • Facility power-line electromagnetic interference (EMI) filters are used to provide radio frequency(RF) isolation between dedicated power distribution services and noise sensitive local power distribution systems. This type of EMI filters generally needs a high current capacity and, in some special applications, a high insertion loss of a minimum 100dB from 14kHz through 10GHz per MIL-STD 220 is required. This paper deals with an analysis and design of a wideband facility power-line EMI filter with the above requirements. The characteristics of the inductor and capacitor at high frequencies are investigated. The characteristics and design method of the facility EMI filter with a high order LC network are also presented. The prototype filter is finally implemented and its performance is verified from the experimental results.

UV Detecting according to Corona Discharge Intensity using UV Sensor (자외선 센서를 이용한 코로나 방전 강도에 따른 자외선 검출)

  • Kwag, Dong-Soon;Kim, Young-Seok
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.78-83
    • /
    • 2014
  • To minimize the financial loss due to power facility malfunction, on-line diagnostic techniques are required to grasp any abnormal state of facilities in the live line as well as devices to diagnose abnormal states of power facility in an easy and prompt manner. This study aims to develop a portable UV detecting system by means of UV sensors for easier and efficient inspection of the degradation state of power facility in a long distance. Accordingly, it includes a simulation of corona discharges that may occur due to degradation of power facility and detection of ultraviolet pulse generation depending on the corona discharge intensity and measuring distance in application of UV sensors. Additionally, the optimal algorithm is determined for its application to the system's degradation diagnosis program based on the measured experiment data.

A Study on the Optimization of Power Transformer in Apartment Housing (아파트의 동력변압기 용량 최적화 연구)

  • 이기홍;성세진
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.1
    • /
    • pp.78-83
    • /
    • 2001
  • To establish the optimized capacity of power transformer, this paper proposed the total demand factor of power supply facility. For this purpose, it was measured and analysed the operating pattern of power supply acility Installed in the apartment. As a result, it is found that the demand factor of each facility is following that : i) In case of [Xlwer water suwly facility ; 47[%], ii) In case of waste water facility ; 44[%]. Also, it was analysed that the optimized total demand factor of power load is proper 42[%1 than 52[%] to lead the efficiency operation.ration.

  • PDF

Field measurements of natural periods of vibration and structural damping of wind-excited tall residential buildings

  • Campbell, S.;Kwok, K.C.S.;Hitchcock, P.A.;Tse, K.T.;Leung, H.Y.
    • Wind and Structures
    • /
    • v.10 no.5
    • /
    • pp.401-420
    • /
    • 2007
  • Field measurements of the wind-induced response of two residential reinforced concrete buildings, among the tallest in the world, have been performed during two typhoons. Natural periods and damping values have been determined and compared with other field measurements and empirical predictors. Suitable and common empirical predictors of natural period and structural damping have been obtained that describe the trend of tall, reinforced concrete buildings whose structural vibrations have been measured in the collection of studies in Hong Kong compiled by the authors. This data is especially important as the amount of information known about the dynamic parameters of buildings of these heights is limited. Effects of the variation of the natural period and damping values on the alongwind response of a tall building for serviceability-level wind conditions have been profiled using the gust response factor approach. When using this approach on these two buildings, the often overestimated natural periods and structural damping values suggested by empirical predictors tended to offset each other. Gust response factors calculated using the natural periods and structural damping values measured in the field were smaller than if calculated using design-stage values.

UsN based Soundness Monitoring Diagnosis System of Power Transmission Steel Tower (UsN 기반의 송전철탑 건전성 감시진단시스템 기본설계)

  • Lee, Dong-Cheol;Bae, Ul-Lok;Kim, Woo-Jung;Min, Bung-Yun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.56 no.1
    • /
    • pp.56-62
    • /
    • 2007
  • In this paper, design method for power tower hazard diagnosis/predition system based on UsN was proposed. The proposed method used multi-hybrid sensors to measure rotation, displacement, and inclination state of power tower, and made decision/prediction of hazard of power tower. System design was made with requirement analysis of monitoring for transmission power facility and use of MEMS and optic fiber sensors. For hazard decision, analysis of correlation was made using sensor output. LN based on IEC61850,international standard for digital substation, was also proposed. For transmission facility monitoring, digital substation and power tower were considered as parts of power facility networks.

Effective Analsis of GAN based Fake Date for the Deep Learning Model (딥러닝 훈련을 위한 GAN 기반 거짓 영상 분석효과에 대한 연구)

  • Seungmin, Jang;Seungwoo, Son;Bongsuck, Kim
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.137-141
    • /
    • 2022
  • To inspect the power facility faults using artificial intelligence, it need that improve the accuracy of the diagnostic model are required. Data augmentation skill using generative adversarial network (GAN) is one of the best ways to improve deep learning performance. GAN model can create realistic-looking fake images using two competitive learning networks such as discriminator and generator. In this study, we intend to verify the effectiveness of virtual data generation technology by including the fake image of power facility generated through GAN in the deep learning training set. The GAN-based fake image was created for damage of LP insulator, and ResNet based normal and defect classification model was developed to verify the effect. Through this, we analyzed the model accuracy according to the ratio of normal and defective training data.

A Study on the Breaking down of overhead line in the middle of span (가공전선 경간 중간 단선고장 에 관한 연구)

  • Park, Chul-Bae;Joung, Jong-Man;Kim, Dong-Myeong;Kim, Hanl-Hong
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.509-510
    • /
    • 2011
  • 한국전력공사 배전선로의 가공설비(특고압)는 2011.03 현재 약 615,089 km가 설치 운전 중에 있으며 해마다 가공전선 단선 고장이 일어나고 있어, 원인 규명 및 방지대책을 강구하고 있다. 본 연구에서는 가공전선 단선사고의 일반적인 사례 LP 애자 설치개소가 아닌 선로 중간에서 단선 고장난 사고사례에 관한 것으로써 전선피복(절연체)의 두께와 impulse voltage에 따른 Pinhole 형성 그리고 단선 메커니즘에 대해서 기술하였다.

  • PDF

An Extraction Technique of Automatic Recognizing Regions on Power Distribution Facility Map by Partial Extension (부분확장에 의한 배전설비도면의 자동인식 대상영역 추출 방법)

  • Kim, Gye-Young;Lee, Bong-Jae;Cho, Seon-Ku;Woo, Hee-Gon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.10
    • /
    • pp.1349-1355
    • /
    • 1999
  • A power distribution facility map is drawn on cadastral map. Besides, grid lines are added on the map for sectionalization. For automatic recognition of the map, we first extract recognizing regions. In this paper, we propose an extraction method of recognizing regions by partially extending thinned image. The proposed method is consist of three phases, binarization phase, thinning phase and partial extending phase. The first phase generate a binary image using threshold value which is obtained by histogram analysis. The binary image contains many part of recognizing regions, but not all. The second phase generate thinned image which is generated by appling thinning operator to the binary image. And the third phase extends thinned image from terminal point until satisfying termination condition. The proposed method is tested on several power distribution facility maps, and the results are presented.

  • PDF

The fire Prevention measures of the underground transmission line (지중송전케이블의 방화대책)

  • Kwak, Bang-Myung;Tack, Eui-Gyun;Kim, Jae-Seung
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.501-503
    • /
    • 2001
  • Electric power consumption is highly increasing as the social trend requiring comfortable life, the population in a big city and the industrial development. Therefore it has become to be very important to supply the stable high-quality power. As these trend, the underground power transmission facility is highly increasing in the center of a city. As the proportion to increase facility in tunnel, the fire prevention measures of the underground transmission line become very important.

  • PDF

Implementation of Real-time Power Facility Monitoring System Using WSN (무선 센서 네트워크 기술을 이용한 전력 설비 실시간 감시 시스템 구현)

  • Kim, Young-Il;Cho, Seon-Ku;Yi, Bong-Jae;Song, Jae-Ju;Shin, Jin-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.488-490
    • /
    • 2006
  • In the electric power industry, It is important that the supply of energy must always be guaranteed. To satisfy these requirements, various forms of technologies are needed, such as RFID tag, reader, sensor network, middleware and so on. WSN (Wireless Sensor Network) technologies of the electric power industry are in the early stage and there is no clear guideline for developing electric facility management system using WSN. Relevant experience is limited, the challenge will be to derive requirement from business practice and to determine whether it is possible or not. To explore this issue, we focus on researching and field test of prototype system in Korea Electric Power Corporation (KEPCO). In this paper we describe requirement from power industry. And we introduce design and implementation of the power facility monitoring system.

  • PDF