• 제목/요약/키워드: Power/ground

검색결과 1,880건 처리시간 0.03초

Analysis of Split Power/Ground Plane Structures for Radiated EMI Reduction (EMI 저감을 위해 분할된 전원/접지 평판 구조에서의 방사성 방출 분석)

  • Lee, Jang-Hoon;Lee, Pil-Soo;Lee, Tae-Heon;Kim, Chang-Gyun;Song, In-Chae;Wee, Jae-Kyung
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • 제47권6호
    • /
    • pp.43-50
    • /
    • 2010
  • In this paper, we analyzed radiated emission generated by the split power/ground plane structures in order to reduce EMI in system modules. The magnetic fields and electric fields were simulated and measured on the test boards under various conditions. In order to reduce radiated emission, we have to determine spacing and location of the split ground gap so that input signal frequency does not coincide with the resonance frequency of the split power/ground plane structure and the phase of reflection coefficient is close to $0^{\circ}$ at input signal frequency. Moreover, we found that inserting a stitching capacitor could reduce the radiated emission. Low magnitude of reflection coefficient and the phase close to $0^{\circ}$ are required to reduce radiated emission. It is necessary to properly decide value and location of a stitching capacitor to fulfil those requirements.

Identifying significant earthquake intensity measures for evaluating seismic damage and fragility of nuclear power plant structures

  • Nguyen, Duy-Duan;Thusa, Bidhek;Han, Tong-Seok;Lee, Tae-Hyung
    • Nuclear Engineering and Technology
    • /
    • 제52권1호
    • /
    • pp.192-205
    • /
    • 2020
  • Seismic design practices and seismic response analyses of civil structures and nuclear power plants (NPPs) have conventionally used the peak ground acceleration (PGA) or spectral acceleration (Sa) as an intensity measure (IM) of an earthquake. However, there are many other earthquake IMs that were proposed by various researchers. The aim of this study is to investigate the correlation between seismic responses of NPP components and 23 earthquake IMs and identify the best IMs for correlating with damage of NPP structures. Particularly, low- and high-frequency ground motion records are separately accounted in correlation analyses. An advanced power reactor NPP in Korea, APR1400, is selected for numerical analyses where containment and auxiliary buildings are modeled using SAP2000. Floor displacements and accelerations are monitored for the non- and base-isolated NPP structures while shear deformations of the base isolator are additionally monitored for the base-isolated NPP. A series of Pearson's correlation coefficients are calculated to recognize the correlation between each of the 23 earthquake IMs and responses of NPP structures. The numerical results demonstrate that there is a significant difference in the correlation between earthquake IMs and seismic responses of non-isolated NPP structures considering low- and high-frequency ground motion groups. Meanwhile, a trivial discrepancy of the correlation is observed in the case of the base-isolated NPP subjected to the two groups of ground motions. Moreover, a selection of PGA or Sa for seismic response analyses of NPP structures in the high-frequency seismic regions may not be the best option. Additionally, a set of fragility curves are thereafter developed for the base-isolated NPP based on the shear deformation of lead rubber bearing (LRB) with respect to the strongly correlated IMs. The results reveal that the probability of damage to the structure is higher for low-frequency earthquakes compared with that of high-frequency ground motions.

Power Control and Ground Fault Simulations for a Distribution System with a Fuel Cell Power Plant

  • Hwang, Jin-Kwon;Choi, Tae-Il
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • 제24권7호
    • /
    • pp.9-19
    • /
    • 2010
  • Fuel cell (FC) distributed generation (DG) is gradually becoming more attractive to mainstream electricity users as capacity improves and costs decrease. New technologies including inverters are becoming available to provide a uniform standard interconnection of DGs with an electric power system. Some of the operating conflicts and the effect of DG on power quality are addressed and investigated through simulations on a real distribution network with an FC power plant. The results of these simulations have proved load tracking capability following the real and reactive power change of the load and have shown the flow of overcurrent from an FC power plant during the ground fault of a distribution line.

Transfer Characteristic for Various Noise Source Positions and Power Bus Noise Reduction Method using Elevated Ground Island in High Speed PCBs (고속 인쇄회로기판에서 잡음원 위치에 따른 전도 잡음 특성 분석 및 부양된 접지 아일랜드를 이용한 전원부 잡음 감소 방법)

  • 이신영;권덕규;이해영
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • 제14권3호
    • /
    • pp.226-232
    • /
    • 2003
  • In this paper, design rule of power island is studied. Power island have a defect that increase transfer noise when each power bus structure is resonant. So, in this paper, resonances are suppressed for various noise source positions and in order to improve noise characteristics, it is suggested EGI in order to improve noise characteristic. At the simulation result, the least resonance is showed for various noise source position and transfer impedance with power bus resonance is reduced about 11 $\Omega$ by EGI.

The Improvement of NGR for Power Transformer Open Circuit Protection (전력용변압기 단선 보호용 NGR 성능 개선)

  • Kang, Y.W.;Shim, E.B.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전기설비전문위원
    • /
    • pp.83-88
    • /
    • 2004
  • As the electric system is getting larger to meet the increasing demand for electric power, the rating of power apparatus is becoming inevitably higher in its working voltage and larger in its capacity. According to KEPCO reports, power transformers in the KEPCO system have undergone troubles such as winding short insulation breakdowns every year since 1981. the cause of this troubles were high one line grounding fault currents in KEPCO systems that had direct grounding systems. KEPCO has installed the NGR(neutral grounding reactor) to lower this fault current and reduced winding short insulation breakdowns in power transformers. But when a circuit breaker opened a no load bus, some trips of circuit breakers for protecting transformer have occurred by mal-operation of 59GT(overvoltage ground relay) that detect disconnection of NGR. Therefore, in this paper, we analyzed the cause and examined the effect of time delav circuit to prevent wrong operation of 59GT.

  • PDF

An Analysis of Potential Interference Effects in the Vicinity of Ground Rod Depending on Frequency of Ground Currents (접지전류의 주파수에 따른 수직 접지전극 주변에서 전위간섭 영향 분석)

  • Lee, Bok-Hee;Cho, Yong-Seung;Choi, Jong-Hyuk;Yang, Soon-Man
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • 제25권12호
    • /
    • pp.88-93
    • /
    • 2011
  • When the ground current is injected into the adjacent ground electrode, the potential interference is caused between ground electrodes, the ground potential interferences have been largely studied with power frequency fault currents. Many attempts to find the frequency-dependent grounding impedance report that the high frequency grounding impedance is very different with the ground resistance. This paper presents experimental data on the frequency-dependent potential interference effects in the vicinity of ground rod. The ground potential rises around the test ground rod of 4 or 6[m] were measured and discussed. As a result, the ground potential rises and potential interference factor are decreased with decreasing the grounding impedance. It was found that the lowering of grounding impedance is critical to reduce the ground potential interference effects.

A Line-to-ground Cable Fault Location Method for Underground Distribution System (지증 배전계통을 위한 1선지락 고장거리계산 방법)

  • Yang, Xia;Lee, Duck-Su;Choi, Myeon-Song
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.329-331
    • /
    • 2005
  • This paper proposes a line-to-ground cable fault location method for underground distribution system. The researched cable is composed of core and sheath. And underground cabke system has been analyzed using Distributed Parameter Circuit. The effectiveness of proposed algorithm has been verified through EMTDC simulations.

  • PDF

Simulation of Motion and Overturns for Power Tiller-Trailer System (동력경운기(動力耕耘機)-트레일러 시스템의 운동(運動) 및 전도(轉倒) 시뮬레이션)

  • Park, K.J.;Park, U.L.
    • Journal of Biosystems Engineering
    • /
    • 제17권1호
    • /
    • pp.27-36
    • /
    • 1992
  • Computer simulation was carried out to predict the motion and overturns of power tiller-trailer system this system when traveing over an obstacle on inclined planes. To estimate the effects of design factors (mass center of main body and wheel base), ground factors (ground inclination and height of obstacle), and operation factors (traveling velocity) on the sideways overturn, the motion of power tiller-trailer system was simulated as the factors were varied with five different levels.

  • PDF

Computation of Uniform Hazard Spectrum for Wolsong Nuclear Power Plants. (월성 원전 부지의 등재해도 스펙트럼 계산)

  • 신진수
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 한국지진공학회 1998년도 추계 학술발표회 논문집 Proceedings of EESK Conference-Spring 1998
    • /
    • pp.297-303
    • /
    • 1998
  • The uniform hazard spectrum of Wolsong Nuclear Power plant Site is computed in order to estimate probabilistically the characteristics of spectral ground response. The spectral hazard values calculated from the seismic zoning maps proposed by eight seismologist are combined with equal weight to produce a uniform hazard spectrum. The uniform hazardd spectra corresponding to reference probabilities of 1.0 $\times$10-4/year and 1.0$\times$10-5/year are presented, which largely depend on the spectral attenuation relation. The computational results of this study contribute to verify the conservatism of the design ground spectrum of Wolsong Nuclear Power Plant.

  • PDF

Ground Integrated Test for the Hybrid Electric Propulsion System (하이브리드 전기추진 시스템 지상통합시험)

  • Lee, Bo-Hwa;Kim, Young-Mun;Park, Poo-Min;Kim, Keun-Bae;Cha, Bong-Jun
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 한국추진공학회 2011년도 제37회 추계학술대회논문집
    • /
    • pp.772-776
    • /
    • 2011
  • EAV-2, which has a solar cell, fuel cell and battery as its power sources, is under development by KARI. Electric power sources are selected through voltage matching without power converter and controller and tested. The ground integrated test for integrated system is performed during 5 hr. it is confirmed that battery's power response is faster than other power sources at starting and transient condition, fuel cell and solar cell are a major electrical power during cruise condition. It is revealed that the used energy portions of fuel cell, solar cell and battery are 68%, 29%, 2.5% respectively.

  • PDF