• 제목/요약/키워드: Post-Evaluation

검색결과 2,301건 처리시간 0.037초

외상성 뇌손상이후 발생하는 외상후 스트레스장애와 급성스트레스 장애의 평가 및 치료 (The Evaluation and Treatment of Post-Traumatic Stress Disorder and Acute Stress Disorder After Traumatic Brain Injury)

  • 박기창
    • 생물정신의학
    • /
    • 제2권2호
    • /
    • pp.193-204
    • /
    • 1995
  • Traumatic brain injury(TBI) used to be developed after a severe traumatic event. Therefore TBI usually induces acute or chronic stress reaction. I reviewed the concept, epidemiology, biological or psychosocial etiology, diagnosis and treatment of post-traumatic stress disorder (PTSD), and discussed about PTSD or stress reaction after TBI. Early evaluation and management of stress reaction after TBI are important.

  • PDF

구매의사결정 단계와 재구매 의도 관계에서 고객 만족의 매개효과 분석 - 아웃도어 웨어를 대상으로 - (Mediation of Consumer Satisfaction in the Relationship between Outdoor Wear Purchase Decision-Making Process and Repurchase Intention)

  • 유화숙
    • 한국의류산업학회지
    • /
    • 제19권1호
    • /
    • pp.19-29
    • /
    • 2017
  • This study identified the purchase decision-making process of outdoor wear consumers and examined the hypothesis that consumer satisfaction mediates the relationship between purchase decision-making process and repurchase intention. Data were acquired from a survey and analyzed with descriptive, factor analysis, reliability analysis and multiple regression analysis. Respondents were 454 adults who have purchased outdoor wear. The results are as follows. First, the purchase decision-making processes of outdoor wear consumers consisted of a series of steps: need recognition & passive information search, active information search, evaluation of alternatives with practical attributes, evaluation of alternatives with unpractical attributes, purchase decision, and post-purchase evaluation. Second, four purchase decision-making processes (except for need recognition & passive information search and active information search) had significantly positive effects on consumer satisfaction. Third, the need recognition & passive information search, the evaluation of alternatives with unpractical attributes and post-purchase evaluation had significantly positive effects on repurchase intention. Lastly, the partial mediation of consumer satisfaction in the relationship between two purchase decision-making processes (evaluation of alternatives with unpractical attributes and post-purchase evaluation) and repurchase intention were indicated. This academic study will help to understand the purchase decision-making processes of outdoor wear and allow companies to obtain information (from the industrial aspect) about which process to invest in and how to manage the process.

일반농산어촌개발사업 사후평가체계 정립을 통한 우선 지원마을 선정 방법 - 태안군 일반농산어촌개발사업을 중심으로 - (A Method of Selecting Priority Support Villages by Establishing an Post Evaluation System for Rural Development Projects - In the Case of Rural Development Projects of Taean-gun -)

  • 양지은;노윤진;이재호
    • 농촌계획
    • /
    • 제27권4호
    • /
    • pp.71-82
    • /
    • 2021
  • A diverse rural development projects are continuously increasing. However, in most villages, the business run by residents is not being operated normally. Followed by these problems, a follow-up management evaluation system has been created and utilized, but the existing evaluation system is only administratively approached and not suitable for application in reality. This research emphasizes that the perspective of community and re-startup support should be added to the evaluation system as these are projects that are carried out to improve the quality of life of local residents and enhance the rehabilitation of villages. Based on the evaluation system proposed in this study, field surveys and interview surveys were conducted targeting 10 villages in Taean-gun, Chungcheongnam-do in South Korea. As a result of the study, various types that have not been activated were derived, and they were presented by categoriz ing them. The purpose of this study is to help the rehabilitation of common rural villages by providing a updated post evaluation system and items that can be applied not only to Taean-gun but also to numerous villages in the entire villages in South Korea.

건설공사 사후평가시스템의 개선방안에 관한 연구 (A study on the Improvement of the Construction Post-evaluation System in Public Construction Projects)

  • 옥현;김진욱;양성훈
    • 한국컴퓨터정보학회:학술대회논문집
    • /
    • 한국컴퓨터정보학회 2015년도 제52차 하계학술대회논문집 23권2호
    • /
    • pp.305-308
    • /
    • 2015
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.

  • PDF

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

수산자원조성사업의 합리적인 평가체계 도입 방안에 관한 연구 (A Study on Establishing the Evaluation System of the Stock Enhancement Program)

  • 김대영;류정곤;이정삼
    • 수산경영론집
    • /
    • 제41권1호
    • /
    • pp.1-24
    • /
    • 2010
  • The main goal of the study is to propose an objective and standardized evaluation system of stock enhancement programs. In order to achieve this goal, the study first suggested the need for stock enhancement program evaluation system through the review of current status and problems. Second, the study identified possible problems of the existing stock enhancement program evaluation by reviewing domestic and foreign evaluation systems. Finally the study proposed a new evaluation system and implementation plan of it. This study also classified the program evaluation criteria into ex-ante evaluation and ex-post evaluation according to the evaluation point in time, and applied the economic, political and technical feasibility tests into the evaluation of the stock enhancement program in order to solve the current problems of the evaluation. The evaluation process of the stock enhancement program is composed of an evaluation system design, estimation of weights using the analytical hierarchy process, design of estimation standard, conversion of scores and final summary of the evaluation. The central government takes the lead in the evaluation of the regional (metropolitan city or province) projects and the regional government is in charge of the evaluation of the local (city or county) projects. For the implementation of the ex-ante evaluation, either the regional or local governments ask for the evaluation and then submit an evaluation plan and other necessary documents to the upper level governments. The ex-post evaluation is then carried out by the upper level governments.

친환경건축물인증제도의 평가지표 분석에 관한 연구 - 서울시 학교시설의 사후평가를 중심으로 - (A Study on Evaluation Indicator Analysis of the Green Building Certification - Focused on Post Evaluation of the Education Facilities case in Seoul -)

  • 문선기;신은경;김세용
    • 교육시설 논문지
    • /
    • 제20권3호
    • /
    • pp.41-52
    • /
    • 2013
  • In the current condition of seeking eco-friendly development, Green Building Certification Criteria can reduce environment burden that is able to be arose in life cycles of buildings. Moreover, it is a great help to induce to constructing pleasant environment. The ripple effect that also improves saving of energy and resources of the whole country, and green-house gases reduction effect and environment friendliness of other buildings can be expected by promoting eco-friendly education facilities which accounts for a great part of public buildings in comparison with other buildings. In this study, analysis of old and new indicators' contrast and contents in Green Building Certification, and post evaluation of education facilities and interviews on authorities were proceeded for improving evaluation indicator of each item in Green Building Certification Criteria. As a result, it analyzed problems in terms of institution and operations management, and drew implications accordingly. In addition, it has a significance in that it proposes improvements of substantively applicable indicators with high applicability.

An analysis of ex-post assessment on Korea-Chile Free Trade Agreement with respect to the agricultural sector

  • Han, Suk-Ho
    • 농업과학연구
    • /
    • 제43권3호
    • /
    • pp.468-480
    • /
    • 2016
  • As the existing FTAs' implementations are being accelerated, ex-post assessments, such as tariff schedules and agricultural trade analyses results, have been emerging as important national issues for the agricultural sector. Korea-Chile FTA is the first FTA in Korea, and more than ten years have passed since April 2004. It will be necessary to measure the impacts of the agreement on the domestic agricultural industry by analyzing concessions made on traded items of farm products on prices, agricultural trade, and so on. The purpose of this study is to prepare for the request for ex-post assessments on the agricultural sector by trade negotiation procedural law. Additionally, by providing policy direction for agricultural policy segments requiring amendments and supplements through an ex-post assessment, we can more objectively evaluate the conflicting arguments between the agricultural and non-agricultural sectors. Current evaluation methods about ex-post impact assessment of FTA are generally comparison analysis on the change of trade balance before and after FTA implementation. However, this simple comparison analysis cannot be said to pure FTA effects and objective, tightening economic impact assessment of the FTA because of all combined situations such as effects of exchange rates, international macroeconomic changes, climate change, and the occurrence of pests. This research attempts to use dynamic analysis as its ex-post assessment methodology and is expected to contribute to future policy evaluation.

건설공사 사후평가 용역대가기준 개선방안 (A Study on Improving Pricing Criteria for Post-Construction Evaluation)

  • 김석;이두헌;박재우
    • 한국콘텐츠학회논문지
    • /
    • 제16권8호
    • /
    • pp.661-670
    • /
    • 2016
  • 건설공사 사후평가는 공공건설사업을 대상으로 수요 공사비 공사기간 기대효과 및 사업관리 내용 등을 준공 이후에 재평가하고, 차후 유사사업 추진 시 그 평가결과를 참고하여 발주청의 시행착오를 줄이기 위한 목적으로 2000년부터 도입되었다. 하지만 용역대가 산정기준이 마련되지 않아 사후평가 용역의 질적 저하 및 분쟁발생의 원인이 되고 있다. 본 연구에서는 사후평가 용역데이터를 기반으로 공사비요율방식 및 실비정액가산방식의 용역대가 산정기준을 제시하였다. 용역대가 분석을 위해 기존의 사후평가 용역비와 공사비를 조사하고 공사비요율방식 및 실비정액가산방식을 통해 산출된 용역비를 비교분석하였다. 분석결과 실비정액가산방식을 통해 산출한 용역비가 공사비요율방식에 비해 더 정확함을 확인하였다. 실비 정액가산방식은 시설물별 사업특성을 반영할 수 있도록 거리보정계수, 면적보정계수, 통합보정계수 등 다양한 보정계수가 적용되었으며, 선형공사(도로, 철도), 비선형공사 I(주택 산업단지), 비선형공사 II(공항, 항만, 댐, 상하수도), 기타공사로 시설물 구분을 세분화하여 산정기준을 제시하였다.

한국의 무상원조 평가 동향 연구: KOICA 사후평가 보고서 분석을 중심으로 (1998-2016) (Analyzing the Trends of Development Evaluation in South Korea : Focusing on the Ex-Post Evaluation Reports of KOICA (1998-2016))

  • 손혁상;이진영;이일청
    • 국제지역연구
    • /
    • 제22권1호
    • /
    • pp.161-202
    • /
    • 2018
  • 본 연구의 목적은 한국의 무상원조 평가 동향을 분석하는 것이다. 이를 위해서 한국국제협력단(KOICA)에서 발행한 평가보고서를 OECD DAC 평가기준을 중심으로 검토하였다. 또한 유 무상 원조기관의 평가 역사와 발전과정을 설명한다. 연구질문은 두 가지로 요약할 수 있다. 첫째, 한국 무상원조의 평가기준과 접근방법론은 OECD DAC 가입을 전후로 어떻게 변화되었는가, 둘째, OECD DAC의 평가기준은 KOICA 사후평가 보고서에 어떻게 반영되어 있는가이다. 연구 분석 자료는 1998년부터 2016년까지 KOICA 홈페이지에 게시된 개별 사업평가보고서이다. 약 28여년간 발행된 KOICA의 사업평가 보고서에 대한 개략적인 분석, 그리고 사후평가 보고서를 중심으로 '평가결과'와 '제언' 부분을 내용분석(content analysis)하였다. 주요 분석결과는 세 가지로 요약할 수 있다. 첫째, OECD DAC의 5대 평가기준인 적절성, 효율성, 효과성, 영향력, 지속가능성에 대한 언급 빈도가 높아지고, 평가기법에 있어 정량평가기법 활용이 증가하고 있다. 둘째, OECD DAC 가입을 전후로 한국 기업진출, 한국의 국가위상 제고에 대한 내용 보다는 수원국의 소득증대, 경제성장 등의 논의가 확대되고 있음을 확인했다. 셋째, 2011년 부터 발행된 사후평가 보고서에는 사업설계매트릭스(PDM), 기초선조사(baseline data) 등 평가지표, 성과 등과 관련된 단어들이 기하급수적으로 증가하였다. 본 연구는 한국의 무상원조사업 사후평가 방식이 최근 국제사회의 기준을 적극적으로 수용하고 있으며, 보고서의 양적, 질적 변화를 위해 다양한 평가방법을 활용하고 있음을 확인하였다.