• Title/Summary/Keyword: Plant planning

Search Result 641, Processing Time 0.039 seconds

금형공장의 공정관리를 위한 Modular Software System

  • 강무진;김영기
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1992.04a
    • /
    • pp.301-305
    • /
    • 1992
  • A mold plant is characterized by complex processes, frequent schedule changes, and lots of troubles. In order to control the production in mold plant efficiently, huge amount of informations are to be managed in the appropriate way. In this paper, a modular software system for production control is described, which is located between a higher level production planning system and a process control system. It contains the functions such as order processing, operations scheduling and control, tool managemant, NC program managememt including DNC functions, production data acquisition and progress control and statistics.

Correlation Between Environmental Factors and Plant Species - Example of Tributaries of the Han River and Nakdong River (하천의 자연환경과 식물출현과의 상관성 - 한강 및 낙동강 지류하천의 사례 -)

  • Kim, Hyea-Ju;Shin, Beom-Kyun;Kim, Chang-Wan
    • Korean Journal of Environment and Ecology
    • /
    • v.22 no.1
    • /
    • pp.43-58
    • /
    • 2008
  • For this study, which was conducted in the summer from $2004\sim2007$, 10 small and medium sized streams in Korea were selected(Munsan and Gokreung Stream in the Han River watershed, Mi, Ssanggye and Nam Stream in the Nakdong River watershed, Gapeong and Jojong Stream in the Bukhan River watershed, Cheongmi, Yanghwa and Bokha Stream in the Namhan River watershed), and plant surveys were performed using the belt transect method on the most natural 1km sections of each stream in order to clarify the natural environment condition of the plants in each stream. In the results of the plant survey, the total number of plant species recorded was 296. After selecting 121 species of those surveyed plant in order of frequency, an RDA(Redundancy Analysis) and a Pearson Correlation Analysis were performed to determine the correlation between the selected plant species and environmental factors( such as distance from channel, size of bed material, number of bars, altitude, bed slope, width of channel, and measured data of water quality) of the study sites. There was no significant correlation between the 121 plant species and altitude, bed slope, and number of bars at the research sites, but the correlation of plant species with size of bed material, width of channel, electrical conductivity, and phosphate$(PO_4-P)$ concentration was from very high to moderate. Also, the spectrum of these plant species reflects the actual environmental conditions so the method used in the study seems to be correct, but owing to the range of diversity, the results of the study seem to be difficult to extend to other streams. Nevertheless, it is expected that this data can be used as a basic material for researching plants by stream characteristics or in selecting plant species for streams.

Local path-planning of a 8-dof redundant robot for the nozzle dam installation/detachment of the nuclear power plants

  • Park, Ki C.;Chang, Pyung H.;Kim, Seung H.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10a
    • /
    • pp.133-136
    • /
    • 1996
  • The nozzle dam task is essentially needed to maintain and repair nuclear power plants. For this task, an 8-dof redundant robot is studied with a local path-planning method[l] which is effective to find the optimal joint path in the constrained environment. In this paper, the method[l] is improved practically with the weight matrix and efficient algorithm to find working set. The effectiveness of the proposed method is demonstrated by simulation and animation.

  • PDF

A Study on the Optimal Capacity of Pumped Storage Power Plant in the 3rd Basic Plan for Long-Term Electricity Supply and Demand (제3차 전력수급기본계획에서의 적정 양수발전기 규모 검토)

  • Park, Marn-Geun;Yang, Sung-Bae;Ryu, Heon-Su
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.231-233
    • /
    • 2007
  • 구조개편 이후 전력수급계획 수립여건이 한전의 독점적 계책에서 사업자 건설의향으로 전환됨에 따라 신규설비 건설계획은 수익성 위주로 전환되었다. 이에 따라 본 논문에서는 기저선비(원자력, 석탄화력) 운전효율성 항상 차원에서 건설되던 양수설비의 적정 설비규모를 계통 공급신뢰도 측면, 에너지 이응 효율성 향상 측면, 전력시장에서의 경제성 측면에서 검토하여 최적전원구성(Best Fuel Mix) 유도론 위한 정책적 방향을 제시하였다.

  • PDF

Transmission Network Expansion Planning Using Risk Level Improvement Index (위험도 개선 지수를 이용한 송전계통 계획 수립에 관한 연구)

  • Kim, Sung-Yul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.752-757
    • /
    • 2014
  • This paper attempts to evaluate the impact of power plant penetration on constraints of a transmission network and proposes a methodology based on risk level, which can evaluate the condition of the network and facilities intuitionally. Furthermore, based on this methodology, RLII(Risk Level Improvement Index) is proposed in order to establish comprehensive TNEP(Transmission Network Expansion Planning) from a viewpoint of ISO(Independent System Operator). In order to verify the proposed methods in this paper, real power systems in Incheon and Shiheung areas, south Korea are applied to the case study.

Improving Remodeling Process of Plant Dormitory Based on User Demand (사용자 요구기반 공장기숙사 리모델링 프로세스 개선)

  • Koo, Kyo-Jin;Park, Sang-Hun;Park, Hyung-Jin;Kim, Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.321-322
    • /
    • 2012
  • Since 1980, rapid social and economic development due to increased plant construction has led to a plant dormitory in a short period. In recent years, by the advent of the durability of dormitory remodeling is a critical need. However, user requirements due to the lack of owner's budget do not reflected. As a result, users have complained about the scope of construction, and construction stakeholder in accordance with the budget efficiency of the complaints have decreased. In this study the remodeling requirements in the planning stages is proposed for the remodeling process. In addition work type and element can select a range of construction worksheet are proposal.

  • PDF

Economic Analysis of Plant Utilities Under Environment Factor (환경요소를 고려한 발전설비의 경제성 평가)

  • 정석재;김경섭;박진원
    • Journal of the Korea Society for Simulation
    • /
    • v.13 no.2
    • /
    • pp.35-43
    • /
    • 2004
  • The purpose of this study is an economic analysis of power plant utilities by comparing electricity generating cost including environmental costs. Considering the enormous role of electricity in the national economy, it is very important to study the effect of environmental regulation on the electricity sector. Because power utilities need for large investment during construction, operation and maintenance, and also require much construction lead time. Economic analysis is the important process in the electric system expansion planning. This paper compares the costs of electricity generation including environmental costs between a coal-fired power plant and an LNG combined cycle power plants. With the simulation, this study surveys the sensitivity of fuel prices, interest rate and carbon tax. In each case, this sensitivity can help to decide which utility is economically better in environmental regulation circumstance.

  • PDF

Vegetation Management Planning and Plant Community Structure of Camellia japonica Forest at Hakdong, Kojedo, Hallyo-Haesang National Park (한려해상국립공원 거제도 학동지역 동백나무림 식물군집구조 특성 및 식생관리 계획)

  • 한봉호;조현서;송광섭
    • Korean Journal of Environment and Ecology
    • /
    • v.12 no.4
    • /
    • pp.345-360
    • /
    • 1999
  • The purpose of this study was to suggest vegetation management Planning and plant community structure of Camellia Japonica forest at Hakdong, Kojedo, Hallyo-Haesang National Park. Forty-six plots(l00$\m^2$/plot) were established in Camellia japonica forest and surveyed. By DCA ordination technique and mean importance value analysis, the plant communities were classified into four community types, which were Camellia japonica community, Camellia japonica-Eurya japonica community, Camellia japonica-Neolitsea sericea community, Chumaecyparis obtusa-Camellia japonica community. It was supposed that Camellia japonica-Neolitsea sericeu community succeeded to Neolitsea sericea community. The others would not be replaced by another woody species. The vegetation management for successional controls in long-term basis were suggested; for the short-term basis, the species of Chamaecyparis obtusa, Neolitsea sericea and Eurya japonica should be removed. The species of Quercus serrata, Prunus sargentii, Meliosma myriantha, Machilus thunbergii and Litsea japonica. must be controlled under the long-term management of vegetation.

  • PDF

A Comparative Case Study of 2016 Gyeongju and 2011 Virginia Earthquakes (2016년 경주지진과 2011년 미국 버지니아지진에 대한 비교 연구 및 사례 분석)

  • Kang, Thomas H.K.;Jeong, Seung Yong;Kim, Sanghee;Hong, Seongwon;Choi, Byong Jeon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.20 no.7_spc
    • /
    • pp.443-451
    • /
    • 2016
  • A Gyeongju earthquake in the magnitude of 5.8 on the Richter scale (the moment magnitude of 5.4), which was recorded as the strongest earthquake in Korea, occurred in September 12, 2016. Compared with the 2011 Virginia earthquake, the moment magnitude was slightly smaller and its duration was 3 seconds, much shorter than 10 seconds of the Virginia earthquake, resulting in relatively minor damage. But the two earthquakes are quite similar in terms of the overall scale, unexpectedness, and social situation. The North Anna Nuclear Power Plant, which is a nuclear power plant located at 18 km away from the epicenter of the Virginia earthquake, had no damage to nuclear reactors because the reactors were automatically shut down as the design basis earthquake value was exceeded. Ground accelerations of the 2016 Gyeongju earthquake did not exceed the threshold value but the manual shutdown was carried out so that Wolsong Nuclear Power Site was not damaged. Damaged historic homestead house and masonry structures due to the Virginia earthquake have been repaired, reinforced, and rebuilt based on a long-term earthquake recovery project. Likewise, it will be necessary to carefully carry out an earthquake recovery planning program to improve overall seismic performance and to reconstruct the historic buildings and structures damaged as a result of the Gyeongju earthquake.