• Title/Summary/Keyword: Plant market

Search Result 581, Processing Time 0.026 seconds

A Domestic Power Companies' Strategy to Enter Asian Thermal Power Plant Market (국내 발전기업의 아시아 화력발전플랜트 시장 진출전략)

  • Park, Chang-Hyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.58-66
    • /
    • 2011
  • The power plant companies reached the culmination for growth in the domestic market. Besides, we have faced many challenges such as an electricity opening market trend for overseas, banning the use of coal due to the United nations framework convention on climate change, and the meticulous attention regarding the government's electricity charge plan. On the other hand, the overseas business has been a critical issue since China and many other developing countries expanded their projects abroad. Another factor is that power plant industry is being privatized, and it made the market regulation a bit loose. Thus, the market environment became favorable toward those companies which planned many overseas businesses. In this research, the power plant company's current condition for construction and operation as well as its technical competitiveness were analyzed, and an alternative plan using SWOT analysis for entering an oversea market was made. It dealt with both internal and external factors. Also, examined was the current situation under the power plant industry dealing with restructure for electric industry, lack of fossil fuel, and the United nations framework convention on climate change. From the research, it was suggested that many successful strategies to enter the overseas business by using the market trend I researched.

  • PDF

A Study on Development of Plant Educational Contents For Training the Plant Experts in the Abroad Construction Market (해외건설시장의 플랜트 전문가 육성을 위한 교육 컨텐츠 개발 연구)

  • Park, Eun-Soo;Jang, Kyung-Soo;Koh, Sung-Won;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.695-698
    • /
    • 2007
  • As the world plant market extends, the number of the domestic construction company expansion to the abroad plant market is increasing. However, there is a lack of plant experts for opening domestic and abroad plant market; call in plant experts from abroad. Moreover, domestic plant education programs are not well constructed. And the education programs are not characterized by field, environment, and position. Thus, we should develop contents and establish the foundation for the plant education programs to train appropriate plant experts who will lead the world plant market. The purpose of the study is to develope educational contents for plant experts to be compatible in the abroad plant market. The contents developed by this study may practically used as the fundamental material for the future educational program.

  • PDF

Development of System Dynamics model for Electric Power Plant Construction in a Competitive Market (경쟁체제 하에서의 발전소 건설 시스템 다이내믹스 모델 개발)

  • 안남성
    • Korean System Dynamics Review
    • /
    • v.2 no.2
    • /
    • pp.25-40
    • /
    • 2001
  • This paper describes the forecast of power plant construction in a competitive korean electricity market. In Korea, KEPCO (Korea Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company in Korea at present time. Fossil power companies are scheduled to be sold to private companies including foreign investors. Nuclear power company is owned and controlled by government. The competition in generation market will start from 2003. ISO (Independence System Operator will purchase the electricity from the power exchange market. The market price is determined by the SMP(System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners such as government are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies such as nuclear and coal plants. Large unclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT(Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investors behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investors behavior can be applied to the new investments for the power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate production. A computer model was developed to sturdy the possibility that construction will appear in waves of boom and bust in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester(MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford(Energy Policy, 1999). This model was designed based on the Energy Policy results(Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach. Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as unclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investment by investors in the market. This model may be used to learn if government investment in new unclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of unclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market.

  • PDF

Penetration of Korean EPC Companies into International Market for Nuclear Power Plant (플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안)

  • Cho, Chan-Hyoung;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

A Study on the Participation of Virtual Power Plant Based Technology Utilizing Distributed Generation Resources in Electricity Market (분산발전자원을 활용한 가상발전소 기반 기술의 전력시장 참여 방안에 대한 연구)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.2
    • /
    • pp.94-100
    • /
    • 2016
  • A virtual power plant (VPP) technology is a cluster of distributed generation installations. VPP system is that integrates several types of distributed generation sources, so as to give a reliable overall power supply. Virtual power plant systems play a key role in the smart grids concept and the move towards alternative sources of energy. They ensure improved integration of the renewable energy generation into the grids and the electricity market. VPPs not only deal with the supply side, but also help manage demand and ensure reliability of grid functions through demand response (DR) and other load shifting approaches in real time. In this paper, utilizing a variety of distributed generation resources(such as emergency generator, commercial generator, energy storage device), activation scheme of the virtual power plant technology. In addition, through the analysis of the domestic electricity market, it describes a scheme that can be a virtual power plant to participate in electricity market. It attempts to derive the policy support recommendation in order to obtain the basics to the prepared in position of power generation companies for the commercialization of virtual power plant.

Selection and Strategies of New Leading Businesses in International Construction Market (해외건설시장의 신성장동력 공종선정 및 진출전략 도출)

  • Choi, Seok-Jin;Lee, Kang-Wook;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.25-36
    • /
    • 2012
  • As the international construction market is rapidly expanding, Korean contractors have the need for having new leading businesses for their sustainable growth and high performance. Thus, this research tried to explore new leading businesses with two questions: 'What can be the new leading businesses?' and 'How can Korean contractors implement new leading businesses?' To this end, based on Porter's five forces framework and the resource-based view (RBV), we first derive three evaluation criteria (possibility of market entry, possibility of profit earning, and possibility of value-added earning). Next, we developed a framework for business evaluation which considers external market condition, internal competitiveness, and spin-off effects toward domestic market. Based on the framework, we defined green-energy plant, environmental plant, desalination plant, nuclear power plant, new urban development, and high-rise building as new leading business. Then, we selected green energy plant, environmental plant, and new urban development for the purpose of prior occupation of the market, consolidation of the competitiveness, and expansion of the ripple effect, respectively. Finally, we deduced market entry strategies for each business by investigating experts' opinions.

A Study on plans for improving localization of process pumps for petrochemical plants (석유화학 플랜트용 프로세스 펌프의 국산화율 제고 방안에 관한 연구)

  • Cho, Won-Bae;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.50-58
    • /
    • 2009
  • In this paper, the present condition for localization of process pumps and the enhancement method of the localization ratio of process pumps for refinery and chemical plant market were studied. The market of plant industry in the world has grown rapidly since 2000. However, the profit of domestic plant EPC compaies cound not have been increased as much as the market scale because they procured most of equipment from overseas. To make remarkable profit of plant EPC companies in the petrochemical industry, localization of equipments is required. Suitable equipment for localization is process pump applied API 610 standard. An purchased amount of pumps from overseas by domestic plant EPC companies in the last two years were 230 billion won. If process pumps are localized then an profit of plant EPC project will increase.

  • PDF

Status of Overseas Construction Market and Domestic R&D Case for Plant Projects (해외 플랜트시장 현황 및 국내 연구개발 사례)

  • An, Sung-Hoon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.129-134
    • /
    • 2008
  • Global construction market has grown rapidly since 2000. Even though developing countries grew into an economic, the most of oil-producing countries of continuous high oil prices due to an increase in plant construction orders is to present a lot of influence. According to the growth of global construction market, the domestic construction companies in the overseas market share have recorded 3% of the performance of the top 10 world records. However, current performance has analyzed the expansion of the market rather than competitiveness development of domestic construction companies. Therefore, to improve competitiveness in the global construction orders for the domestic construction companies in terms of long term, the government in Korea has ordered various research projects related to the plant since 2005. This paper presents not only global plant market trends and plant project in domestic but also introduction of completed research standardization recently.

  • PDF

Assessment and Management System for Various Risks in Plant Projects (플랜트 프로젝트 리스크의 평가 및 관리시스템에 관한 연구)

  • An, Seung Kyoo;Cho, Dong-Hwan;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.56-63
    • /
    • 2010
  • While the local plant market is reducing its volume, the plant market over the world since 2000s is rapidly expanding. The nation's construction companies, aggressively dedicated in launching out overseas plant market, increase the volume of orders in that sector, but there also are much difficulty in the project management as those projects ordered are gradually large scaled with more cutting-edge high-tech requirements along with comparatively higher risk. Though the local construction companies have developed their own types of measures to analyze the risk evaluation putting into practice, the specialized decision-making model for the overseas plant market or the risk measure understandable easily and applicable practically is not yet shown. This paper aims at providing the methodology to evaluate the risk by way of constructing the risk evaluation process in order to induce risk measuring elements through appropriate indexing system. Furthermore, through studying the risk management system, it aims to seek for a thorough risk management method from beginning of the project to the end.

  • PDF

Market Power in the Korea Wholesale Electricity Market (우리나라 전력시장에서의 시장지배력 행사)

  • Kim, Hyun-Shil;Ahn, Nam-Sung
    • Korean System Dynamics Review
    • /
    • v.6 no.1
    • /
    • pp.99-123
    • /
    • 2005
  • Although the generation market is competitive, the power market is easily exercised the market power by one generator due to its special futures such as a limited supplier, large investment cost, transmission constraints and loss. Specially, as Korea Electric industry restructuring is similar US competitive wholesale electricity market structure which discovered the several evidences of market power abuse, when restructuring is completed the possibility that market power will be exercised is big. Market power interferes with market competitions and efficiency of system. The goal of this study is to investigate the market price effects of the potential market power and the proposed market power mitigation strategy in Korean market using the forecasting wholesale electricity market model. This modeling is developed based on the system dynamics approach. it can analyze the dynamic behaviors of wholesale prices in Korean market. And then it is expanded to include the effect of market condition changed by 'strategic behavior' and 'real time pricing.' This model can generate the overall insights regarding the dynamic impact of output withholding by old gas fire power plant bon as a marginal plant in Korean market at the macro level. Also it will give the energy planner the opportunity to create different scenarios for the future for deregulated wholesales market in Korea.

  • PDF