• Title/Summary/Keyword: Plant Projects

Search Result 329, Processing Time 0.05 seconds

Comparative Study of Strength and Weakness of System Form in High-rise Building Project (초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구)

  • Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

Application of 275kV XLPE Power Cables for Overseas Protect (275kV XLPE절연 전력케이블의 해외프로젝트 적용)

  • Kwon, B.I.;Seong, J.K.;Han, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1736-1738
    • /
    • 2002
  • Oil-filled power cables and XLPE power cables have been globally applied for extra-high-voltage underground power transmission lines. The application of XLPE cables for the transmission lines have been largely increased at the domestic and overseas projects because of some issues. O.F cables have some week points, related with the issues of the environmental pollution and the needed maintenance work, even though they have been applied for several ten years and their reliability has been proven. Meanwhile, the demands on XLPE power cables increase as their manufacturing technologies have been improved and their simplicity of installations has been focused on. In Korea, for the first time, the 275kV XLPE cable is to be applied at an overseas power plant project. This paper introduces the project profile, the design of the XLPE cable and its accessories, the cable system design and the installation design.

  • PDF

Geological Safety Evaluation and Monitoring of Nuclear Facility Sites in South Korea

  • Lee, Hyunwoo;Woo, Hyeon Dong;Chun, Hyun Ju;Im, Chang-Bock
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.609-613
    • /
    • 2014
  • The Korean Peninsula, located at the southeastern tip of the Eurasian Plate, is known to be tectonically stable, and no critical evidence has yet been found that would override the safety design of nuclear facilities in South Korea. Because a nuclear power plant, like other major social overhead capital facilities, could cause great damage to both the environment and society through an unexpected tectonic event, even one of extremely low probability, like the Fukushima accident, a defense-in-depth safety approach is required in geological and geotechnical site safety evaluation for nuclear projects. This paper introduces the regulatory procedures that are in place to confirm nuclear site safety and site monitoring (e.g., earthquakes and groundwater) systems applied to nuclear facilities in order to reduce inherent uncertainties within the site safety review of geological and seismological issues related with a NPP project.

Use of Remotely-Sensed Data in Cotton Growth Model

  • Ko, Jong-Han;Maas, Stephan J.
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.52 no.4
    • /
    • pp.393-402
    • /
    • 2007
  • Remote sensing data can be integrated into crop models, making simulation improved. A crop model that uses remote sensing data was evaluated for its capability, which was performed through comparing three different methods of canopy measurement for cotton(Gossypium hirsutum L.). The measurement methods used were leaf area index(LAI), hand-held remotely sensed perpendicular vegetation index(PVI), and satellite remotely sensed PVI. Simulated values of cotton growth and lint yield showed reasonable agreement with the corresponding measurements when canopy measurements of LAI and hand-held remotely sensed PVI were used for model calibration. Meanwhile, simulated lint yields involving the satellite remotely sensed PVI were in rough agreement with the measured lint yields. We believe this matter could be improved by using remote sensing data obtained from finer resolution sensors. The model not only has simple input requirements but also is easy to use. It promises to expand its applicability to other regions for crop production, and to be applicable to regional crop growth monitoring and yield mapping projects.

Challenges in Green Innovation Policy after the Fukushima Nuclear Accident

  • Wada, Tomoaki
    • STI Policy Review
    • /
    • v.4 no.1
    • /
    • pp.135-161
    • /
    • 2013
  • This paper examines Japan's Science and Technology (S&T) Basic Plans in accordance with its S&T Basic Law. The Basic Plans promote two major innovation (Green Innovation and Life Innovation) towards the creation of new markets and jobs, specifically under the Fourth S&T Basic Plan enacted on August 2011. Successful smart community demonstration projects at four urban localities were launched under plans to promote Green Innovation research and development of renewable energy technologies. However, the expectation that renewable energy such as solar or wind power can replace nuclear power is not backed by sufficient evidence. Furthermore, the electricity produced by these sources is expensive and unstable owing to its reliance on weather conditions. The Fukushima nuclear power plant accident on March 2011 has also seriously affected Japan's future energy plans. According to a government estimate, electricity charges would double if nuclear power generation were abandoned, imposing a heavy burden on the Japanese economy. Japan is in need of energy policies designed on the basis of more far-sighted initiatives.

Big data-based piping material analysis framework in offshore structure for contract design

  • Oh, Min-Jae;Roh, Myung-Il;Park, Sung-Woo;Chun, Do-Hyun;Myung, Sehyun
    • Ocean Systems Engineering
    • /
    • v.9 no.1
    • /
    • pp.79-95
    • /
    • 2019
  • The material analysis of an offshore structure is generally conducted in the contract design phase for the price quotation of a new offshore project. This analysis is conducted manually by an engineer, which is time-consuming and can lead to inaccurate results, because the data size from previous projects is too large, and there are so many materials to consider. In this study, the piping materials in an offshore structure are analyzed for contract design using a big data framework. The big data technologies used include HDFS (Hadoop Distributed File System) for data saving, Hive and HBase for the database to handle the saved data, Spark and Kylin for data processing, and Zeppelin for user interface and visualization. The analyzed results show that the proposed big data framework can reduce the efforts put toward contract design in the estimation of the piping material cost.

Water Erosion and Its Combating Measures in Loess Plateau, China (중국 황토고원지구의 물침식과 대책)

  • Chun, Kun-Woo;Lim, Young-Hyup;Oh, Jeong-Soo;Yoon, Taek-Seong;Park, Ki-Hyung
    • Journal of Forest and Environmental Science
    • /
    • v.26 no.3
    • /
    • pp.181-192
    • /
    • 2010
  • Water erosion is progressing in the Loess Plateau, especially in gullies, and the sediment runoff to the Yellow River amounts to 975 million tons every year. Natural factors for water erosion include climate, soil, geological feature, terrain and vegetation. Many development projects due to the increasing population reduced the forest coverage ratio to 10%, and 200 million people in the downstream area are suffering from the damage during intense rainfall. Accordingly, the Chinese government is continuously trying to efficiently prevent the erosion by establishing measures for water erosion, including fish-scale pits, terrace technique, and check dams.

Capability Evaluation for Improving Competitiveness of the Korean Construction Firms

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Son, Bo-sik;Jang, HyounSeung;Kim, Jin-Woo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.746-747
    • /
    • 2015
  • Recently, Korea has achieved accumulated total value of orders of six hundred billion dollars in international construction market, and it is facing a new turning point by entering the overseas construction market. However, according to the statistics on the current internal construction market, the accumulated value of orders has been mainly obtained by plant projects in the Middle-East area. To improve international competitiveness of Korean construction industry, it is required to expand and diversify the target areas and construction business sectors. To expand markets, each construction firm should establish the expansion strategy and assess the capability which includes the strength and weakness of their firm. Therefore, this research aims to evaluate the capability of the Korean construction firms for overseas expansion. Through the research, Korean construction industry is expected to strengthen competitiveness toward the overseas markets. Furthermore, this research contributes to expanding and diversifying markets for domestic construction firms.

  • PDF

Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.