• 제목/요약/키워드: Planning Management

검색결과 6,193건 처리시간 0.037초

통합적인 공정순서와 가공기계 선정을 위한 유전 알고리즘 (Genetic Algorithm for Integrated Process Sequence and Machine Selection)

  • 문치웅;서윤호;이영해;최경현
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.405-408
    • /
    • 2000
  • The objective of this paper is to develop a model to integrate process planning and resource planning through analysis of the machine tool selection and operations sequencing problem. The model is formulated as a travelling salesman problem with precedence relations. To solve our model, we also propose an efficient genetic algorithm based on topological sort concept.

  • PDF

A multi-product multi-facility production planning model with capacity constraints

  • Sung, C.S.
    • 한국경영과학회지
    • /
    • 제10권2호
    • /
    • pp.15-23
    • /
    • 1985
  • A multi-product multi=facility production planning model is in which known demands must be satisfied. The model considers concave production costs and piecewise concave inventory costs in the introduction of production capacity constraints. Backlogging of unsatisfied demand is permitted. The structure of optimal production schedules is characterized and then used to solve an illustrative numerical problem.

  • PDF

Emerging Issues of Urban Management and Planning for Seoul

  • Kwon, Won-Yong
    • 지역연구
    • /
    • 제12권2호
    • /
    • pp.69-78
    • /
    • 1996
  • This paper intends to raise some of urban policy issues of managing and planning Seoul for the twenty first century. As one of the world's most dynamic megacities, Seoul is faced with at least two trends: one is globalization of the economy, and the other is humanization of urban development in relation to people's quality of life. Given this context, there are emerging issues in a time of transition as the following; pedestrianization, decline of city master plan, micro land use control, citizen involvement, metro-wide management, infrastructure provisions and maintenance, sustainable development, urban information sustaniable development, urban information system, and public-private partnership.

  • PDF

경영정책지원 시스템의 실행방안

  • 김연민
    • 경영과학
    • /
    • 제1권
    • /
    • pp.35-45
    • /
    • 1984
  • This paper deals with the case study of the establishment of decision supporting system in shipbuilding industory. Facts or information of shipbuilding, sales, finance, production strategic planning in shipbuilding industry are considered. General transportation model for shipyard production schedule is formulated, and shipbuilding demand forecasting scheme is also introduced. This paper shows the several methods of DSS in shipbuilding industry. But production schedule strategic planning system by OR technique is emphasized. For the realization of DSS in shipbuilding industry, another efforts (data gathering and programming etc.) should be given on the basis of these methods.

  • PDF

A Multiproduct Facility-in-Series Production Planning Model

  • Sung, C.S.
    • 한국경영과학회지
    • /
    • 제9권2호
    • /
    • pp.15-22
    • /
    • 1984
  • A deterministic multiproduct, facility-in series multiperiod production planning model is analyzed, where each period demand for the product of a facility appear in a fixed proportion of that for the product of the immediately following facility. The model considers concave production and inventory costs, which can depend upon the production in different facilities. No backlogging is allowed. It is shown that the model is represented via a single source network, which facilitates development of efficient dynamic programming algorithms for computing the optimal production schedule.

  • PDF

장기 용수 공급계획 수립을 위한 컴퓨터 모의뜨임 모형 (A Simulated Annealing Model for Long Range Water Supply Planning)

  • 김승권;이준열
    • 한국경영과학회지
    • /
    • 제20권2호
    • /
    • pp.77-93
    • /
    • 1995
  • A mathematical model for long-rage water supply planning was formulated as a dynamic plant location problem with network arc capacity expansion, and illustative example was presented. The proposed solution procedure identifies economical construction timings of surface water supply facilities and water conveyence systems and the best water supply operating patterns as well. In this study, we present a heuristic solution procedure using Simulated annealing Method in conjunction with Bertsekas & Tseng's RELAXT-II for the 0-1 integer network problem.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

직장인의 시간관리행동 유형화 연구 (A Typology on Time Management Behaviors of Workers)

  • 채화영;이기영
    • 대한가정학회지
    • /
    • 제43권11호
    • /
    • pp.211-224
    • /
    • 2005
  • The purposes of this study were firstly to reveal the sub-dimensions of time management behaviors and secondly to group workers by time management behaviors. The major findings of this study were as follows. (1)Factor analysis of the 36 items on the time management behaviors instrument revealed three components: factor planning, relations-intention, and urgency. (2)Workers were categorized into four types by the level of those three factors of time management behaviors: 'accomplishment type'($28.31\%$), 'chronic-urgency type'($24.39\%$), 'valuing-job type'($23.73\%$) and 'valuing-human relations type'($23.57\%$). (3)The accomplishment type gained the highest points on the time management satisfaction score, and the level of important${\cdot}$non-urgencies was the highest score, indicating that the accomplishment type had good time management. However, the level of unimportant${\cdot}$urgencies was the highest score. Therefore, this type should try to reduce the level of unimportant${\cdot}$urgencies.

A Study on the National GIS (NGIS I) Project in Korea

  • Oh, Jong-Woo
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2004년도 International Conference on Digital Policy & Management
    • /
    • pp.449-453
    • /
    • 2004
  • GIS can be used on almost entire fields of the world, such as the national land management, environmental management, disaster management, enterprise activities, and general lives. GIS is called as an infrastructure of the knowledge information on the cultural society. For insuring the national power on the periods of the unlimited competition, it is very important to establish the national information infrastructure. Purpose of the NGIS project I is to development on living benefits of peoplethrough an efficiency of policy and rationalism of planning. In order to achievement of this purpose, the NGIS project I has been established using the national geographic information base planning. The NGIS project I consists of the master management part, the geographic information part, the technique development part, the standardization part, and the land Information part. These five GIS project parts are operated by four governmental ministers and related institutions, such as minister of transportation and construction, minister of science and technology, minister of information and communication, minister of administrative and home affaires. The NGIS I project is to establishment of the nation spatial information systems, such as various nationwide digital maps, GIS technique development, GIS education, GIS standardization, and GIS researches.

  • PDF

대단위(大單位) 기계공장(機械工場)의 효율적(效率的) 운영(運營)을 위한 종합(綜合) 생산관리(生産管理) 시스템의 개발(開發) (Development of Logistics Support Systems in a Large Machinery Company)

  • 이기석
    • 대한산업공학회지
    • /
    • 제5권2호
    • /
    • pp.45-56
    • /
    • 1979
  • This report presents the development of an integrated logistics support system for a large-scale machinery manufacturing organization. The system consists of 3 major production management systems and 5 assisting systems. The major systems are: i) production planning and control system, ii) cost control system, and iii) material management system. The assisting systems are: i) personnel management system. ii) technology transfer system, iii) quality assurance system, iv) marketing assisting system, and v) management information system. In addition, other management systems such as planning system, R.&.D. system can be considered according to the organizational need. Several system flow models are developed and presented for the total logistics support system.

  • PDF