• Title/Summary/Keyword: Planned Maintenance System

Search Result 73, Processing Time 0.029 seconds

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

Research and Application of Fault Prediction Method for High-speed EMU Based on PHM Technology (PHM 기술을 이용한 고속 EMU의 고장 예측 방법 연구 및 적용)

  • Wang, Haitao;Min, Byung-Won
    • Journal of Internet of Things and Convergence
    • /
    • v.8 no.6
    • /
    • pp.55-63
    • /
    • 2022
  • In recent years, with the rapid development of large and medium-sized urban rail transit in China, the total operating mileage of high-speed railway and the total number of EMUs(Electric Multiple Units) are rising. The system complexity of high-speed EMU is constantly increasing, which puts forward higher requirements for the safety of equipment and the efficiency of maintenance.At present, the maintenance mode of high-speed EMU in China still adopts the post maintenance method based on planned maintenance and fault maintenance, which leads to insufficient or excessive maintenance, reduces the efficiency of equipment fault handling, and increases the maintenance cost. Based on the intelligent operation and maintenance technology of PHM(prognostics and health management). This thesis builds an integrated PHM platform of "vehicle system-communication system-ground system" by integrating multi-source heterogeneous data of different scenarios of high-speed EMU, and combines the equipment fault mechanism with artificial intelligence algorithms to build a fault prediction model for traction motors of high-speed EMU.Reliable fault prediction and accurate maintenance shall be carried out in advance to ensure safe and efficient operation of high-speed EMU.

Justification on engine information in maritime service portfolio for effective implementation of e-Navigation

  • Lee, Young-Chan;Sim, Myeong-Bo;Hong, Woo-Ram;Lee, Jae-Yeong;Jung, Byung-Gun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.10
    • /
    • pp.1049-1053
    • /
    • 2015
  • This paper proposes to include engine information in Maritime Service Portfolio (MSP) for effective implementation of e-Navigation. Even though engine information is one of most important element to e-Navigation, MSP consists of mainly about navigation and communication information not included engine information. Furthermore, in reality, engine information sent from ship side such as mainly noon report and Planned Maintenance System (PMS) is too limited to make e-Navigation possibly. Therefore, Remote diagnostic structure receiving and sending data of engine information must be included in MSP for implementation of e-Navigation. Also, it has to be designed, and developed by Software Quality Assurance (SQA).

A Study on the Rational Planning of Water Supply and Sewage System for Rural Village Development Projects (농촌마을종합개발사업에서 상하수도시설의 합리적 계획방향에 관한 기초적 연구)

  • Kim, Hwan-Yong
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.8 no.2
    • /
    • pp.62-71
    • /
    • 2006
  • This study on the rational planning of water supply and sewage system for rural village development projects. Present, when establishment and standard about maintenance of water supply and sewage system were not presented in rural village synthesis development projects, it is real condition that service industry is depending on presenting simple plan in basis planning phase and business enforcement step. This study wishes to present basic data so that can be planned more rationally and enforce and contribute in rural village synthesis development projects water supply and sewage system that is enforced as part of rural village synthesis development projects.

  • PDF

A Case Study on Improvement of Records Management Reference Table by Reorganizing BRM : The case of Reorganization of Seoul's BRM and Records Management Reference Table (BRM 정비를 통한 기록관리기준표 개선사례 서울시 BRM 및 기록관리기준표 정비사례를 중심으로)

  • Lee, Se-Jin;Kim, Hwa-Kyoung
    • The Korean Journal of Archival Studies
    • /
    • no.50
    • /
    • pp.273-309
    • /
    • 2016
  • Unlike other government agencies, the city of Seoul experienced a three-year gap between the establishment of a function classification system and the introduction of a business management system. As a result, the city has been unable to manage the current status of the function classification system, and this impeded the establishment of standards for records management. In September 2012, the Seoul Metropolitan Government integrated the department in charge of the standard sheet for record management with the department of function classification system into a new department: "Information Disclosure Policy Division." This new department is mainly responsible for record management and information disclosure, and taking this as an opportunity, the city government has pushed ahead with the maintenance project on BRM and Standards for Record Management (hereby "BRM maintenance project") over the past two years, from 2013 to 2014. The study was thus conducted to introduce the case for the improvement of standards for record management through the BRM maintenance project by mainly exploring the case of Seoul. During the BRM maintenance project, Seoul established a unique methodology to minimize the gap between the operation of a business management system and the burden of the person in charge of the BRM maintenance project. Furthermore, after the introduction of the business management system, the city government developed its own processes and applied the maintenance result to the system in close cooperation with the related departments, despite the lack of precedence on the maintenance of the classification system. In addition, training for the BRM managers of the department has taken place twice -before and after the maintenance-for the successful performance of the BRM maintenance project and the stable operation of the project in the future. During the period of maintenance, newsletters were distributed to all employees in an effort to induce their active participation and increase the importance of records management. To keep the performance of the maintenance project and to systematically manage BRM in the future, the city government has mapped out several plans for improvement: to apply the "BRM classification system of each purpose" to the service of the "Seoul Open Data Plaza"; to reinforce the function for task management in the business management system; and to develop the function of a records management system for the unit tasks. As such, the researchers hope that this study would serve as a helpful reference so that the organizations-which had planned to introduce BRM or to perform the maintenance project on classification system-experience fewer trials and errors.

A Simulation Analysis of R.O.K Navy's Inventory Management Model for Repairable Parts (시뮬레이션을 통한 해군의 복구성 수리부속 재고관리 모형 개발에 관한 연구)

  • Kim, Sungpil;Park, Sunju;Chung, Yerim
    • Journal of the Korea Society for Simulation
    • /
    • v.22 no.1
    • /
    • pp.31-40
    • /
    • 2013
  • Recent development in science and technology has modernized the weapon systems of ROKN (Republic Of Korea Navy). Although the cost of purchasing, operating, and maintaining the cutting-edge weapon systems has been increased significantly, the national defense expenditure is under a tight budget constraint. In order to maintain the availability of ships with low cost, we need an efficient and scientific method for managing repairable parts. In this study, we propose a simulation model that computes the availability of ship's repairable parts. Our model is based on the METRIC (Multi Echelon Technique Repairable Item Control) model and extends to five sub-models to reflect the realistic situations that arise in the navy, such as planned maintenance, condemnation, lateral transshipment, and cannibalization. We have performed simulations to compute the availability of repairable parts while setting the part-level consistent throughout the five models and carried out two sensitivity analyses. The simulation results show the differences in the part availability in different models. The experiments confirm our claim that ROKN needs an inventory management system that captures the operational characteristics of the navy.

A Case study for minimizing scale of LRT stations constructed underground (지하 경량전철의 정거장 규모조정에 관한 사례연구 (우이~신설 경량전철 중심으로))

  • Jin, Jae-Seop;Lee, Seung-Seok;O, Tae-Sang;Sin, Han-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1743-1753
    • /
    • 2011
  • Seoul Metropolitan Government has performed alternative transit system, light rail transit(LRT), for settling the problems of urban public transit system based on conventional bus service and heavy rail transit(HRT). LRT projects of total 8 lines(about 73.6km), including Ui-Sinseol line, have been planned as Build-Transfer-Operate(BTO) projects. For the first LRT, Ui-Sinseol line, however, design of structure had met standard for design of HRT, because of no domestic design code for LRT when participates of Ui-Sinseol project submitted the design proposal. This case study reports a successful example of LRT design minimizing the scale of stations designed in base of HRT code. The problems, like oversized structures compared with LRT vehicles, excessive costs for construction, had been resolved through negotiations with the participates of Ui-Sinseol line. Result suggests that present and future costs for construction and maintenance of the LRT projects in Seoul be considerably reduced in advance.

  • PDF

A Study on the Radio-Based Operation Procedures of Switch and Crossing at Branch Line (지선구간의 선로전환기 및 건널목 무선제어 운영절차 연구)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1269-1274
    • /
    • 2011
  • To cut down the maintenance expenses at branch lines, the foreign developed countries have developed the low-cost signalling on low-density lines. These examples are FFB(FunkFahrBetrieb) Radio based train operation by German railways(Deutsche Bahn AG), ERTMS REGIONAL by Europe and LOCOPROL system using a GPS. Also, Korea is developing Information and Communication Technology based low-cost signalling on low-density lines. The characteristics of this system are directly controled switch and crossing by driver. For the purpose of this paper, we reviewed the business process for switch and crossing control. Specially, we compared and analysed both methods whether the driver takes control over the operation procedures of switch or the control message is carried by the command of the controller. And by utilizing the instrument of UML, I planned the switch according to the control authority and the operation procedures needed for the control of crossing.

  • PDF

Approximate and Three-Dimensional Modeling of Brightness Levels in Interior Spaces by Using Artificial Neural Networks

  • Sahin, Mustafa;Oguz, Yuksel;Buyuktumturk, Fuat
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.4
    • /
    • pp.1822-1829
    • /
    • 2015
  • In this study, artificial neural networks were used to determine the intensity of brightness in interior spaces. The illumination elements to illuminate indoor spaces were considered, not individually, but as a system. So, during the planned maintenance periods of an illumination system, after its design and installation, simple brightness level measurements must be taken. For a three-dimensional evaluation of the brightness level in indoor spaces in a speedy and accurate manner, the obtained brightness level measurement results and artificial neural network model were used. Upon estimation of the most suitable brightness level for indoor spaces by using the artificial neutral network model, the energy demands required by the illumination elements decreased. Consequently, in this study, with estimations of brightness levels, the extent to which the artificial neutral networks become successful was observed and more correct results have been obtained in terms of both economy and usage.

Stochastic FMECA Assessment for Combustion-Turbine Generating Unit in Order to RCM Schedule (복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가)

  • Joo, Jae-Myung;Lee, Seung-Hyuk;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.351-353
    • /
    • 2006
  • Preventive maintenance can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. so, it is necessary to perform reliability analysis on the systems in which reliability is essential. In this paper, FMECA assessment adopted using real historical failure data in Korean power plants for apply RCM analytical method. The stochastic FMECA is an engineering analysis and a core activity performed by reliability engineers to review the effects of probable failure modes of generating unit and assemblies of the power system on system performance. Optimal RCM schedule which is considered the severity level of each generating unit and failure probability from failure prediction of generating unit can be planned using proposed FMECA with IOE index.

  • PDF