• Title/Summary/Keyword: Planned Maintenance System

Search Result 73, Processing Time 0.028 seconds

ISO Coordination of Generator Maintenance Scheduling in Competitive Electricity Markets using Simulated Annealing

  • Han, Seok-Man;Chung, Koo-Hyung;Kim, Balho-H.
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.4
    • /
    • pp.431-438
    • /
    • 2011
  • To ensure that equipment outages do not directly impact the reliability of the ISO-controlled grid, market participants request permission and receive approval for planned outages from the independent system operator (ISO) in competitive electricity markets. In the face of major generation outages, the ISO will make a critical decision as regards the scheduling of the essential maintenance for myriads of generating units over a fixed planning horizon in accordance with security and adequacy assessments. Mainly, we are concerned with a fundamental framework for ISO's maintenance coordination in order to determine precedence of conflicting outages. Simulated annealing, a powerful, general-purpose optimization methodology suitable for real combinatorial search problems, is used. Generally, the ISO will put forward its best effort to adjust individual generator maintenance schedules according to the time preferences of each power generator (GENCO) by taking advantage of several factors such as installed capacity and relative weightings assigned to the GENCOs. Thus, computer testing on a four-GENCO model is conducted to demonstrate the effectiveness of the proposed method and the applicability of the solution scheme to large-scale maintenance scheduling coordination problems.

Generator's Maintenance Scheduling to Improve Supply Reliability (공급신뢰도 개선을 위한 발전기 보수계획)

  • 차준민
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 1998
  • Maintenance scheduling of generators plays an important role in evaluating supply reliability of power systems. Since generators must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance, size of the units, elapsed time from last maintenance, and availability of maintenance crew. This paper proposes a new maintenance scheduling algorithm for the alternatives of long-term generation expansion planning by using LOLP levelization method which is known as an effective method for the generator's maintenance scheduling. To get the best supply reliability of power systems, we change the maintenance period to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the better reliability results are obtained.

  • PDF

Management System for Saemangeum Gate Bridge (배수갑문 교량의 노후도 감시시스템)

  • Lee, Joon-Gu;Cho, Young-Kwon;Kim, Han-Joung;Kim, Kwan-Ho;Kim, Myung-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05b
    • /
    • pp.241-244
    • /
    • 2006
  • The basic prediction model was constructed to obtain optimal maintenance method for concrete structure under marine environment by exploring the mechanism of mono and combined deterioration in lab. This model was planned to be upgraded with data acquired from several exposure specimens under same environment as structures. The computer program developed to give useful guidance observer would be improved. Several repair materials and repair construction methods applied to exposure specimens will be tested for its performance of prohibit salt attack and freezing & thawing action during experimental period about ten years. All of these data could be available to complete the prediction system. The manager will be able to use the system for optimal maintenance of marine concrete structures.

  • PDF

Prediction System of Deterioration Ratio for Marine Concrete Structures (해양콘크리트 구조물의 노후도 예측시스템 개발 연구)

  • Lee, Joon-Gu;Park, Kwang-Su;Cho, Young-Kwon;Lee, Chang-Su;Kim, Han-Joung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.531-534
    • /
    • 2005
  • The basic prediction model was constructed to obtain optimal maintenance method for concrete structure under marine environment by exploring the mechanism of mono and combined deterioration in lab. This model was planned to be upgraded with data acquired from several exposure specimens under same environment as structures. The computer program developed to give useful guidance observer would be improved. Several repair materials and repair construction methods applied to exposure specimens will be tested for its performance of prohibit salt attack and freezing & thawing action during experimental period about ten years. All of these data could be available to complete the prediction system. The manager will be able to use the system for optimal maintenance of marine concrete structures.

  • PDF

The Analysis For Reliability In Multi-dividing Multi-connecting High Power Distribution System (배전계통 연계에 따른 신뢰도 향상 분석)

  • Cho, Nam-Hun;Ha, Bok-Nam;Kang, Moon-Ho;Lee, Heung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.316-318
    • /
    • 2001
  • Occasionally, equipment in a distribution system fails due to damage from weather, vandalism, or other causes. In addition, it is recommended practice to have some way in which maintenance or replacement of every element in a system can be performed without causing lengthy interruption of electrical service to the customers it feeds. Thus, alternate sources, paths, and configurations of service must be planned so that both failures and maintenance do not affect customer service beyond a reasonable amount. In some cases, planning for alternate routes of service during equipment outages or emergencies -- will be the major aspect influencing selection of a feeder's capacity, type of route, or layout. We want to know the relationship between molt-dividing multi-connection and distribution reliability for contingency support considerations.

  • PDF

Optimal Periodic Replacement Policy Under Discrete Time Frame (이산 시간을 고려한 시스템의 교체와 수리 비용 최적화 연구)

  • Lee, Jinpyo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • Systems such as database and socal network systems have been broadly used, and their unexpected failure, with great losses and sometimes a social confusion, has received attention in recent years. Therefore, it is an important issue to find optimal maintenance plans for such kind of systems from the points of system reliability and maintaining cost. However, it is difficult to maintain a system during its working cycle, since stopping works might incur users some troubles. From the above viewpoint, this paper discusses minimal repair maintenance policy with periodic replacement, while considering the random working cycles. The random working cycle and periodic replacement policies with minimal repair has been discussed in traditional literatures by usually analyzing cases for the nonstopping works. However, maintenance can be more conveniently done at discrete time and even during the working cycle in real applications. So, we propose that periodic replacement is planned at discrete times while considering the random working cycle, and moreover provide a model in which system, with a minimal repair at failures between replacements, is replaced at the minimum of discrete times KT and random cycles Y. The average cost rate model is used to determine the optimal number of periodic replacement.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

Optimal Number of Spare Engines and Modules for Aircraft Types (항공기 유형을 고려한 최적 예비엔진 및 모듈 소요 산출)

  • Jeon, Tae Bo;Sohn, Young Hwan;Kim, Ki Dong
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.35-46
    • /
    • 2017
  • Spare engine plays an important role for securing readiness of military strength during unexpected fault occurrences and field/depot planned maintenances. The purpose of this research is to present an approach towards the optimal number of spare engines/modules for diversity of aircraft types. We first reviewed two representative approaches, METRIC and meta model. We then investigated military aircrafts and categorized them into 5 types with regard to the engine type and number of engines/modules per aircraft. Through rigorous investigation of planned/non-planned maintenance of each type, we drew parameters and variables involved. As known, due to the complexity of the problem, it is impossible to develop a simple mathematical model with a closed form solution. Based on the airbase operation and maintenance logic with parameters/variable drawn, we developed a simulation model using ARENA well representing real field exercises. For the optimal solution, we applied OptQuest. It has shown that the program developed generates reliable results through a set of case examples.

Geodetic Survey Campaigns and Maintenance Plan for KASS Reference Station Antenna Coordinates

  • Hwanho, Jeong;Hyunjin, Jang;Youngsun, Yun;ByungSeok, Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.12 no.1
    • /
    • pp.83-89
    • /
    • 2023
  • The Korea Augmentation Satellite System (KASS) system is a Satellite Based Augmentation System (SBAS) under development to provide APV-I SBAS service in the Republic of Korea. The KASS ground segment generates correction and integrity information for GPS measurements of KASS users using the accurate positions of KASS Reference Station (KRS) antenna phase centers. For this reason, the accuracy of KRS reference points through geodetic survey campaigns is one of the important factors for providing the KASS service in compliance with the required navigation performance. In order to obtain accurate positions, two geodetic survey campaigns were performed at several reference points, such as Mark, Center of Mast at Ground Level (CMGL), and Center of Hole in Top Plate (CHTP), of each KRS site using three different survey methods, the Virtual Reference Station (VRS), Flächen Korrektur Parameter (FKP), and raw data post-processing methods. By comparing and analyzing the results, the computed coordinates of the reference points were verified and Antenna Phase Center (APC) positions were calculated using KRS Antenna Reference Point (ARP) data, and the first KASS Site Acceptance Test (SAT#1) was performed successfully using the verified APC coordinates. After the first site survey activities, the KASS operators should maintain the coordinates with the required performance such that the overall KASS navigation performance commitment is guaranteed during the lifetime of 15 years. Therefore, the maintenance plan for the KRS antenna coordinates should be developed before the commissioning of KASS operation planned after 2023. Therefore, this paper presents a geodetic survey method selected for the maintenance activities and provides the rationale for using this method.

Unifying the operation of Privately Funded Expressways (민자고속도로 통합운영방안 연구)

  • Shin, Yong-Suk
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.4
    • /
    • pp.71-81
    • /
    • 2012
  • The Korean government has actively accepted private investments in building expressways to improve its financial status. As of 2012, 422km of 9 private expressways are under operation, and until 2016 additional 15 are planned to be built with private investments. However, on average, each private expressway is at most 37km long, which works against economies of scale in maintenance and thus leads to inefficiencies such as traffic jams, driver inconveniences, and the increase in operating costs. To resolve these problems, the present study suggested that the maintenance and tolling system should be unified across each private operator. Unifying the operation of private expressways was expected to reduce user travel times and tolls, and save operator maintenance costs. These economic effects were expected to be tantamount to hundreds of billions of dollars. The shared toll collecting system will also reduce user's delays by removing main line tollgates. This can save another hundreds of billions of dollars by ensuring driver's convenience and safety.