• 제목/요약/키워드: Periodic Inspection

검색결과 178건 처리시간 0.028초

가스절연개폐장치용 감시시스템 적용에 관한 연구 (A study on the Application of a Monitoring System for Gas Insulaterd Switchgear)

  • 김정배;김민수;송원표;김덕수;전찬석;길경석
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제51권1호
    • /
    • pp.22-30
    • /
    • 2002
  • ln this paper, it was reported the developed results of the monitoring unit for 72.5kY GIS which it is one part of the monitoring system for the substation that Korea Railway Company is promoting. In order to monitor the operational status of GIS, four parameters were chosen: the number of times of the circuit breaker switching, tightness of the gas-sealed units (circuit breaker / disconnecting switch / earthing switch), the number of times of the lightning arrestor operating and the leakage current of the lighting arrester. We constructed the monitoring system that can be judged the operating condition of the GIS from the signal of the suitable sensor for the purpose. Therefore, it is possible to on line monitoring for the condition of the GlS without efforts of the Periodic inspection.

교량의 피로강도를 고려한 맞대기용접부 불안전용입 한계결함 결정에 관한 연구 (An Experimental Study on Allowable Size of Incomplete Penetration in Butt Joint Bridge Weld Considering Fatigue Strength)

  • 백영남;장영권
    • Journal of Welding and Joining
    • /
    • 제18권3호
    • /
    • pp.68-75
    • /
    • 2000
  • The incomplete penetration(IP) discontinuity in butt joint weld, which is detected during safety analysis of the steel bridge by nondestructive evaluation(NDE) method, is classified as unacceptable defect according to the NDE codes and standards. In fact, there are a little allowance in butt joint weld in the view point of design criterion, and also detected IP discontinuity should be classified and evaluated for the fatigue strength and residual life estimation. In this study, we performed fatigue test to evaluate the fatigue strength of high strength steel(SWS490A) containing IP discontinuities in various size, the results compared and classified according to the bridge construction standard specification which published by korea administration of construction and traffic. Experimental results could be used to evaluate and estimate the IP discontinuities considering different stress range in butt joint bridge weld during periodic safety inspection.

  • PDF

발전소 보호계통 주기적 점검 알고리즘에 관한 연구 (A Study on the Periodic Surveillance Algorithm for the Nuclear Power Plant Protection System)

  • 박종범;조황
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 합동 추계학술대회 논문집 정보 및 제어부문
    • /
    • pp.201-203
    • /
    • 2001
  • Safety is emphasized in nuclear power plant system for its characteristic. One of the most important systems to guarantee the safety of nuclear power plant is the PPS(Power protection system). The measurement control system includes PPS, which is similar to the human nervous system, is very important factor not only for the safety but also for the operation. Therefore, developing a technology to level up the performance of measurement system and reliability of the plant will bring cost-effective and safe generation of nuclear power. In this study, I researched composition of digitized PPS and algorithm for cyclic inspection.

  • PDF

강박판 및 탄소섬유판으로 전단보강된 철근 콘크리트 보의 거동에 관한 실험적 연구 (An Experimental Study on the Behaviors of RC Beams Strengthened in Shear by Thin Steel Plate and Carbon Fiber Sheet)

  • 최종수;이대형;손창호;정영수
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1995년도 가을 학술발표회 논문집
    • /
    • pp.219-223
    • /
    • 1995
  • Since the mid of 1970's, the construction of infrastructure has been booming and accelerating to keep up with rapid economic growth. Fast achievement of most construction activities has caused unfavorable effects of civil petitions associated with damages and nuisances due to last hasty works. it is well known that the falling down of Sungsoo bridge and the collapse of Sampoong department and other structures have occurred because of the construction not conforming with the specification, and thereby incurred enormous loss of life and property. Now a days. a periodic inspection and maintenance have been strongly interested on aged RC structures, of repair and reinforcement technique in the country, most repairing and reinforcing works have been performed on the basis of the guidance of few experienced local company in this field.

  • PDF

공항철도 신호시스템의 고장관리 체계 (Failure Management System for AREX's Signalling System)

  • 송미옥;임성수;이창환;김인규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.676-682
    • /
    • 2007
  • In this paper we introduce the Failure Management System for AREX's Signalling System which is applied by RAMS management. The corrective action report is classified into 3 group, scheduled maintenance, non-scheduled maintenance and the reported failure maintenance. The scheduled maintenance is for the failure detected by periodic inspection and it is concerned as the Preventive Maintenance. The reported failure maintenance is for the failure reported by non-maintenance staff and non-scheduled maintenance includes all corrective action except the works of the previous 2 group. RAMS analysis is based on the FRACAS data connected with the corrective action reports. AREX computerize the all process by the Facility Management System of Integrated Information System.

  • PDF

안티몬 이온주입시 Sb2O3 빔튜닝 방법 및 모니터링 연구 (A Study on Sb2O3 Beam Tuning and Monitoring in Antimony Implantation -)

  • 김상용;최민호;김남훈;정헌상;장의구
    • 한국전기전자재료학회논문지
    • /
    • 제17권5호
    • /
    • pp.476-480
    • /
    • 2004
  • The characteristics of antimony implants are relatively well-known. Antimony has lower diffusion coefficient, shorter implantation range, and smaller scattering as compared with conventional dopants such as phosphorous and arsenic. It has been commonly used in the doping of buried layer in Bi-CMOS process. In this paper, characteristics and appropriate condition of monitoring in antimony implant beam tuning using Sb$_2$O$_3$were investigated to get a reliable process. TW(Thema Wave) and R$_{s}$(Sheet Resistance) test were carried out to set up condition of monitoring for stable operation through the periodic inspection of instruction condition. The monitoring was progressed at the point that the slant of R$_{s}$ varied significantly to Investigate the variation of instruction accurately.

원전 주요기기의 확률론적 평가 기법 (Probabilistic Evaluation Methodology for Nuclear Components)

  • 이준성;곽상록;김영진;박윤원
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집A
    • /
    • pp.459-464
    • /
    • 2001
  • For major nuclear power plant components periodic inspections and integrity assessments are needed for the safety. But many flaws are undetectable due to sampling inspection. Probabilistic integrity assessment is applied to take into consideration of uncertainty and variance of input parameters arise due to material properties, applied load and undetectable flaws. This paper describes a Probabilistic Fracture Mechanics(PFM) analysis based on Monte Carlo(MC) algorithms. Taking important parameters as probabilistic variables such as fracture toughness, crack growth rate and flaw shape, failure probability of major nuclear power plant components is archived as a results of MC simulation. For the verification of these analysis, a comparison study of the PFM analysis using other commercial code, mathematical method is carried out and a good agreement was observed between those results.

  • PDF

신호처리기법을 이용한 단순겹치기 접착이음의 비파괴적 강도평가 (Nondestructive Strength Evaluation of Adhesive-Bonded Single-Lap Joints by Signal Processing Method)

  • 정일화;오승규;황영택;장철섭;정의섭;이원
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집A
    • /
    • pp.541-546
    • /
    • 2001
  • Application of bonding by adhesives can be found in many industries, particularly in advanced technological domains such as the aeronautical and space industries, automobile manufacture, and electronics. Periodic inspection with conventional ultrasonic NDE techniques is capable of indicating the presence and possible location of crack. Continuous ultrasonic attenuation monitoring has potential to supply information. This study used adhesive-bonded single-lap joints specimen to evaluate such possibility by ultrasonic signal processing method.

  • PDF

시특법 개정을 위한 서비스 성능 지표 설정 및 평가 방법 연구 (Research on serviceability indicators and evaluation method for the revision of Special Act on Safety and maintenance of facilities)

  • 박태일;박원영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.312-313
    • /
    • 2018
  • As global climate change leaded to extensive natural disaster and radical deterioration of infrastructures, there was increased attentions for the evaluation of infrastructures. After the collapse of Seongsu Bridge in 1994, Korea has enacted the "Special act on safety and maintenance of facilities" and secured the safety of facilities using systematic and periodic safety inspections. However, current facility inspections are mainly performed by the physical defect and structural analysis, and do not properly consider the serviceability of infrastructure such as capacity of facility and user's satisfaction. Thus, the purpose of the study is to develop an evaluation criteria for serviceability of infrastructures and finally leading to the revision of "Special Act on safety and maintenance of facilities in rational manner.

  • PDF

안전성 확보를 위한 전기안전관리기준의 재설정에 관한 연구 (A Study on the Reconfiguration in the Regulation of Electric Safety Management for the Guarantee of Safety)

  • 정재희
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.45-49
    • /
    • 2009
  • This study is to prepare a reasonable basis for the improvement of the electrical safety management regulation. The standards in domestic and foreign countries for the application of new and renewable energy facilities and other devices are analyzed. Other regulations excluding the electrical safety fields and wide surveys are also carried out. Consequently, it is asked that the classification between normal and self electrical facilities should be clear and deregulation for small businesses has to be followed. This study is showed that standards investigates of receiving equipment below 600V above 75kW, eletrical safety manager employment of manufacturing industry and Mid-night electric power. And, it is showed that consignment permission and Consignment inspection periodic relaxation about wind development equipment below 1,000kW, consignment of Technical Development equipment for new and renewable energy below 250kW.