Recently, a number of large-scale photovoltaic(PV) power generation system has been installed all over the world. Thus, in order to improve the system efficiency, the optimal design of the large-scale PV systems has become an important issue. DC cable loss of PV array is one of the design factors related to the system efficiency. This paper introduces the array design method of a 500kW Photovoltaic power plant. Three types of the PV array are suggested. Also, string cables, sub-array cables and array cables are designed within 1% of voltage drop in the line, and the DC cable losses are analyzed. The results of this paper show that the DC cable loss of large-scale PV array can be reduced by adopting a proper sub-array design method.
Since large and small scale photovoltaic(PV) systems have been commercialized in many countries, it is necessary to assess the effects of PV systems on the electric power system. For this, the development of accurate simulation model of PV arrays is very important. PSCAD/EMTDC, a widely used simulation tool for analyzing the transient behavior of electrical apparatus and networks, does not have a standard model of a PV array. Therefore in order to simulate the PV array, users have to develop their own simulation model. However, the block-diagram-based model is very complicated, and it is hard to modify the model parameters. In this study, we develop the user-defined model of a PV array by using the Design Editor, which is provided by PSCAD program. The mathematical model of a PV array and the method to determine the parameters of nonlinear I-V equation are implemented in a Fortran code. The graphical user interface provides the users with easy and simple way to modify the PV array parameters and simulation conditions. In order to help the users, this model also provides the parameters of 10 commercial PV arrays.
본 논문에서는 먼저 10k(Wp)의 PV 어레이를 설계하는 방법을 제시하고, 설계한 10k(Wp)의 PV 어레이는 최저 및 최고 온도를 고려하여 어레이 시스템을 설계하는 방식으로 인버터의 효율적인 운전이 가능하며 부정합에 의한 손실은 3(%)$\sim$5(%)정도 줄일 수 있다.
So, Jung-Hun;Lee, Bong-Seob;Yoo, Jin-Su;Hwang, Hye-Mi;Yu, Gwon-Jong
Journal of the Korean Solar Energy Society
/
v.30
no.6
/
pp.95-101
/
2010
This paper presents performance estimation approach of grid-connected photovoltaic(PV) system to predict energy yield from irradiance to PV system using normalized yield model for changing meteorological conditions. The accuracy and validity of proposed performance estimation method is identified by compared measured with estimated yield using monitored data. These results will indicate that it is useful to estimate various loss factors causing the system performance obstruction and enhance the lifetime yield of PV system.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.1
/
pp.162-168
/
2009
This thesis is based on the research and experiment of the optimal efficiency generation of electric power. The research and experiment were conducted to search the optimal generation of electric power from a specific amount of solar energy from Photovoltaic Power System with a solar position tracker were used. The changes in the array angles and spacing of the PV Module were also taken into account as well. Here are the findings and the conclusions. First of all, based on experiment using the various anglers, the efficiency generation of electric power increased to a maximum of approximately $12{\sim}17$[%] more at the PV module inclination angle of 30[$^{\circ}$] than at the inclination angles of 20[$^{\circ}$] and 40[$^{\circ}$]. As a result, we have found that installing the PV module inclination at the angle of 30[$^{\circ}$] brought about the most efficient conversion effect of the Photovoltaic Power System. But, when the solar cell is installed on a roof or rooftop where snow builds up, it is the most appropriate to install the solar energy at an 35[$^{\circ}$] angle so that snow slides down and not build up on the module.
As the installation of photovoltaic systems increases, fire accidents of PV system grow every year. Most of PV system fires have been reported to be caused by electrical components. The majority of fire accidents occurred in combiner box, which is presumed to be short-circuit accidents due to dustproof and waterproof failures or heat deterioration of blocking diode. For this reason, the blocking diode installation became optional by revised PV combiner regulation. In this paper, according to the revised regulation, reverse current that generated by voltage mismatch was measured and analyzed in PV array without a blocking diode. The factors that cause voltage mismatch in array are assumed to be shaded PV module and short circuit failure of bypass diode. As the result of experiment, there is no reverse current to flow under shading condition in module, but reverse current flows on the failure of bypass diode in module. According to the module's I-V characteristic curve analysis, open voltage was slightly reduced due to operation of bypass diode in shading. However, it showed that open circuit voltage has decreased significantly in the failure of bypass diode. This indicates that the difference in open voltage reduction of voltage mismatch factor causes reverse current to flow.
본 논문에서는 다양한 아치형 태양광발전(Photovoltaic : PV) 시스템을 시뮬레이션을 통하여 구성하고 그 운전특성을 최적의 경사각을 가지는 일정 경사각 PV 시스템과 비교 분석하였다. 결과 아치형 PV 시스템의 경우 모두 PV 어레이 경사각이 $30^{\circ}$인 일정 경사형 시스템에 비하여 9% 이상의 큰 차이가 남을 알 수 있었으며, 최적의 아치경사각은 $10^{\circ}\sim30^{\circ}$임을 알 수 있었다.
Kim, Hyun-Il;Kang, Gi-Hwan;Park, Kyung-Eun;So, Jung-Hoon;Yu, Gwon-Jong;Suh, Seung-Jik
Journal of the Korean Solar Energy Society
/
v.29
no.1
/
pp.32-37
/
2009
Photovoltaic(PV) permits the on-site production of electricity without concern for fuel supply or environmental adverse effects. The electrical power is produced without noise and little depletion of resources. So BIPV(Building-Integrated Photovoltaic) system have been increased around the world. Hereby the relative installation costs of the system will be relatively low compared to traditional installations of PV in high-rise buildings. This paper examined possibility of building integrated balcony PV system and analyzed both performance and problems of this system. The system is influenced by conditions such as irradiation, module temperature, shade and architectural component etc. If this BIPV system of 1.1kW is possible the natural ventilation in the summer case, the temperature of PV module decrease and then the efficiency of PV system increase generally. By the results, the annual averaged PR of BIPV system of cold facade type is about 74.7%.
Park, Yu-Na;Jang, Gil-Soo;Ko, Suk-Whan;Kang, Gi-Hwan;So, Jung-hun;Jung, Young-Seok;Ju, Young-Chul;Hwang, Hye-Mi;Song, Hyung-Jun
Journal of the Korean Solar Energy Society
/
v.37
no.4
/
pp.23-33
/
2017
A great deal of study for loss reduction of photovoltaic system is conducted currently. It is hard to distinct the fault of photovoltaic system with the naked eye. For that reason, it is essential to repair and maintain the PV system by monitoring the system. The fault of individual modules can cause the huge loss of the entire system because of the mismatch. Therefore, the method of diagnosing the PV array is necessary by measuring the multi-channel arrays simultaneously. In this paper, it is presented the method of measuring I-V curve of multi-channel arrays simultaneously by using the charge and discharge characteristics of capacitor. Generated DC power at PV arrays is charged and discharged at the capacitors in a moment. By measuring the charged voltage and current, it is possible to diagnose of performance of PV arrays.
Yoon, Jeong-Phil;Cha, In-Su;Choi, Jeong-Sik;Kim, Dong-Mook;Park, Jong Bock;Ha, Min Ho;Kim, Won Bae
Current Photovoltaic Research
/
v.2
no.4
/
pp.189-194
/
2014
In this paper, We have simulated the output variation of the PV arrays installation with position & angle change. The existing 3 solar array system are $43^{\circ}$ southeast and each of the mounting angle is $17^{\circ}$. The PV output power is 240 kW. The composite studied systems in this paper arrays altered 2 PV array among 3 PV array system- the output 144kW. We simulated this system using Solar Pro ver.4.1. The simulation conditions are southwest $43^{\circ}/array$, mount angle $27^{\circ}/array$. Because the southeast have shadow effect-higher mountain The purpose of southwest $43^{\circ}$ is reduce the shadow effect. The simulation results of the suggestion design algorithm compared to 1,590 kWh/year output is increased with the southeast.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.