Investigating the Impacts of the Quality of Project Management Information System on Project Performance and User Satisfaction (프로젝트 관리 정보시스템 품질이 프로젝트 성과와 사용자 만족도에 미치는 영향)

  • Park, So-Hyun;Lee, Taewon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.50-60
    • /
    • 2018
  • The use of Project Management Information System (PMIS) is increasing in project management industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project performance. However, how much and which parts of project management performance are affected by PMIS still need to be studied further. The purpose of this study is to investigate the impact of PMIS quality on project management performance. We collected data from various project based industries such as construction, defense, manufacturing, software development and telecommunication by using survey questionnaire. PMIS quality was measured in three dimensions. They are system quality, information quality and service quality. Project management performance was measured in nine variables such as time reduction, work accuracy, cost management, etc. Statistical analyses such as multiple regression were used to analyze the data. The results showed that PMIS quality had significant impacts on the project management performance and user satisfaction. It was notable that only two dimensions out of the three PMIS quality dimensions, system quality and information quality, affected the project management performance. Also, it was found that PM performance played a mediating role between PMIS and user satisfaction, and between PMIS and reuse intention. The contribution of this research is that it helps to clarify what aspects of PMIS affect the project management performance and user satisfaction.

Examining the PMIS Impacts on the Project Performance, User Satisfaction and Reuse Intention among the Project based Industries (프로젝트 성과, 사용자 만족도 및 재사용의도에 미치는 PMIS의 산업별 영향 비교)

  • Park, So-Hyun;Lee, Ayeon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.276-287
    • /
    • 2021
  • Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

The Establishing of the Self-regulation System for Quality and Safety Management (현장(現場) 자율(自律) 품질안전관리(品質安全管理) 시스템 구축(構築))

  • Baik, In-Whee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.81-87
    • /
    • 2007
  • PMIS (Project Management Information System) has been applied in the R4-PROJECT This construction project has been controlled and managed by PMIS for the whole process of project. Moreover, this PMIS is updated to the Self-regulation System for Quality and Safety Management which is integrated and developed from PMIS in R4-PROJECT. So, The Self-regulation System for Quality and Safety Management has been delivering effective communication and information distribution with various stakeholders related to project and also brought the achievement of efficient construction management. As the system is successfully utilize, the satisfaction of costumer request and the performance of no accident for 550 million hours could be attained.

  • PDF

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.

A Study of iPMIS(Intelligent Program Management Information System) Information Inference an Searching System Based on Ontologies (온톨로지 기반 정보 검색 시스템을 이용한 iPMIS (지능형 종합사업관리시스템) 정보 추론에 관한 연구)

  • Ahn, Hyoung-Jun;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.175-179
    • /
    • 2009
  • Researches of current PMIS(Project Management Information System) information searching focus on providing personalized results as well as matching needed queries in an enormous amount of information. This paper aim at discovering hidden knowledge to provide personalized and inferred search results based on the ontology with categorized concepts and relations among construction data. The current PMIS searching occasionally presents too much redundant information or offers no matching results from large volumes of data. In this paper, we propose a service searching system, which becomes aware of users device using iPMIS(Intelligent Program Management Information System). And we design and plant the ontology-based iPMIS, which is aware of the context in its environment.

  • PDF

The Effect of PMIS Quality on Project Management Success (PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석)

  • Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2010
  • As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. This is because PMIS is an information system that gathers, integrates, and disseminates the output of project management processes among project participants, and is used to support all aspects of a project, from initiation through closing. This paper aims to identify the CSFs(Critical Success Factor) of Project Management and quality associated with Project Management Information System (PMIS) in construction projects, to analyze the Effect of PMIS quality on Project Management Success. The CSFs of Project Management and the quality components for PMIS are identified through a review of the literature, and consolidated through interviews with professionals in the construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor), and 253 completed questionnaires were retrieved. To increase the applicability of the results, the respondents consisted of workers spread across various parts of the construction site. Using SPSS 12.0, the data was used to analyze the relationship between PMIS Quality and Project Management Success through multiple regression analysis. These findings help to clarify what the highly prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

A Study on the Development of Project Management Information System for Mega Project (대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System (모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안)

  • Lee, Jong-Ho;Eom, Shin-Jo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF