International conference on construction engineering and project management
/
2011.02a
/
pp.38-45
/
2011
Studies have shown that infrastructure projects have continued to experience significant delays and cost overrun over an extended period of time and no evidence of learning ever have happened [1] [2]. Various causes contribute to the bias towards overrun [3]. This study contributes to literature by developing and subsequently validating a set of hypothesized relationships between project complexity and project performance. The results show that project complexity is associated with both the magnitude and variance of overrun. Further, the extent and magnitude of the positive bias towards overrun are moderated by project complexity.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.105-116
/
2017
In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.
Korean Journal of Construction Engineering and Management
/
v.25
no.3
/
pp.27-36
/
2024
The effective control of cost overrun is a crucial issue for construction companies to secure profitability. Especially in situations where cost pressures are significant due to factors such as rising raw material prices and increased financial costs due to high-interest rate policies, cost overruns resulting from project failures have a highly detrimental impact on the profitability of construction firms. The objective of this study is to analyze the current status of cost overrun control measures adopted by construction companies using the IPA technique and provide key characteristics and implications. The IPA analysis results showed that practitioners in general contractors exhibit a high level of interest and effort regarding cost overrun while the performance level is relatively low. Nevertheless, the measures considered important to control cost overruns generally show a high tendency for execution as well. Cost overrun control measures that show high importance but low execution are primarily related to collaboration and communication sectors. To effectively control cost overruns, enhancing collaboration and communication with construction supervisors/CM, headquarters, and regulatory authorities emerged as the most urgent need. Through this study, the current status and areas for improvement regarding cost overrun control measures in general contractors can be identified. This can be valuable for deriving directions and enhancements for future cost overrun control strategy development.
We present a simple and effective method to reduce loop-related false alarms raised by buffer-overrun static program analyzer. Interval domain buffer-overrun analyzer raise many false alarms in analyzing programs that frequently use loops and arrays. Firstly, we classified patterns of loop-related false alarms for loop-intensive programs, such as embedded programs or mathematical libraries. After that we designed a simple and effective false alarm refiner, specialized for the loop-related false alarms we classified. After the normal analysis of program in which alarms considered as false. We implemented this method on our buffer-overrun analyzer with the result that our refinement method decreased the number of false alarms by 32% of total amount the analyzer reported.
Journal of Construction Engineering and Project Management
/
v.4
no.1
/
pp.29-36
/
2014
Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.
The characteristics of ice cream, such as type-keeping viscosity, turbidity and stability of emulsion, were studied with the different composition of fatty acid of monoglyceride. The effect of saturated fatty acid of monoglycerides such as monolaurin, monomyristin, monopalmitin and monostearin on the characteristics of ice cream did not show any difference. The unsaturated fatty acid of monoglycerides, however, such as monocaprin and monoolein, was drastically enhanced the viscosity and easily happened the overrun of ice cream mixture which were resulted in the condensation of the fat droplet. Also the condensed fat droplet had the sterical network-structure. When the ratio of monostearin and monoolein becomed about 30:70, especially, it was confirmed the curdling of fat sphere increase to a maximun so that type-keeping and heat stability of ice cream were improved.
Korean Journal of Computational Design and Engineering
/
v.8
no.4
/
pp.212-221
/
2003
In order to reduce the lead-time and cost, the technology of rapid prototyping (RP) has been widely used. A new rapid prototyping process, transfer-type variable lamination manufacturing process by using expandable polystyrene foam (VLM-ST), has been developed to reduce building time, apparatus cost and additional post-processing. At the same time, VLM Slicer, the CAD/CAM software for VLM-ST has been developed. In this study, algorithms for accuracy improvement of VLM-ST, which include offset and overrun of a cutting path and generation of a reference shape are developed. Offset algorithm improves cutting accuracy, overrun algorithm enables the VLM-ST process to make a shape of sharp edge and reference shape generation algorithm adds additional shape which makes off-line lamination easier. In addition, proposed algorithms are applied to practical CAD models for verification.
International conference on construction engineering and project management
/
2005.10a
/
pp.929-934
/
2005
The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.
We present our experience of combining, in a realistic setting, a static analyzer with a statistical analysis. This combination is in order to reduce the inevitable false alarms from a domain-unaware static analyzer. Our analyzer named Airac(Array Index Range Analyzer for C) collects all the true buffer-overrun points in ANSI C programs. The soundness is maintained, and the analysis' cost-accuracy improvement is achieved by techniques that static analysis community has long accumulated. For still inevitable false alarms (e.g. Airac raised 970 buffer-overrun alarms in commercial C programs of 5.3 million lines and 737 among the 970 alarms were false), which are always apt for particular C programs, we use a statistical post analysis. The statistical analysis, given the analysis results (alarms), sifts out probable false alarms and prioritizes true alarms. It estimates the probability of each alarm being true. The probabilities are used in two ways: 1) only the alarms that have true-alarm probabilities higher than a threshold are reported to the user; 2) the alarms are sorted by the probability before reporting, so that the user can check highly probable errors first. In our experiments with Linux kernel sources, if we set the risk of missing true error is about 3 times greater than false alarming, 74.83% of false alarms could be filtered; only 15.17% of false alarms were mixed up until the user observes 50% of the true alarms.
Soft real-time applications such as multimedia feature highly variable processor requirements and probabilistic guarantees on deadline misses, meaning that each task in the application meets its deadline with a given probability. Thus, for such soft real-time applications, a system designer may want to improve the system utilization by allocating to each task a processor time less than its worst-case requirement, as long as the imposed probabilistic timing constraint is met. In this case, however, we have to address how to schedule jobs of a task that require more than (or, overrun) the allocated processor time to the task. In this paper, to address the overrun problem, we propose an overrun control method, which probabilistically controls the execution of overrunning jobs. The proposed overrun control method probabilistically allows overrunning jobs to complete for better system utilization, and also probabilistically prevents the overrunning jobs from completing so that the required probabilistic timing constraint for each task can be met. In the paper, we show that the proposed method outperforms previous methods proposed in the literature in terms of the overall deadline miss ratio, and that it is possible to synthesize the scheduling parameters of our method so that all tasks can meet the given probabilistic timing constraints.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.