• Title/Summary/Keyword: Optimal construction cost

Search Result 368, Processing Time 0.029 seconds

Optimal design methodology of district metered area utilizing Geographic Information System (GIS를 이용한 상수관망 소블록 최적설계기법 개발)

  • Kim, Kyoung-Pil;Park, Yong-Gyun;Koo, Ja-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.2
    • /
    • pp.223-231
    • /
    • 2015
  • District Metered Area (DMA) construction is one of the most cost effective alternatives for management of water loss (i.e., water leakage) and energy consumption (i.e., water pressure) in water distribution systems. Therefore, it's being implemented to numerous new and existing water distribution systems worldwide. However, due to the complexity of water distribution systems, especially large-scale and highly looped systems, it is still very difficult to define the optimal boundary of DMAs considering all the aspects of water distribution system management requirements. In this study, a DMA design methodology (or a DMA design model) was developed with Geographic Information Systems (GIS) and hydraulic distribution system model to determine the optimal DMA boundary.

Optimal Design of Noise Barrier Using Simulated Annealing Algorithm (Simulated Annealing 알고리즘을 이용한 방음벽의 최적 설계)

  • 김병희;김진형;조대승;박일권
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.1020-1025
    • /
    • 2003
  • A successful design approach for noise barriers should be multidisciplinary because noise reduction goals influence both acoustical and non-acoustical considerations, such as maintenance, safety, physical construction, cost and visual impact These various barrier design options are closely related with barrier dimensions. In this study, we have proposed an optimal design method of noise barriers using simulated annealing algorithm, providing a barrier having the smallest dimension and achieving the specified noise reduction at a receiver region exposed to the industry and infrastructures, to help a successful barrier design.

  • PDF

A Study on the Optimum Design of Three Span Continuous Preflex Composite Girder Bridge (3경간 연속 Preflex 합성형교의 최적설계에 관한 연구)

  • Koo, Min Se;Chang, Suong Su;Jeong, Jin Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.1 s.34
    • /
    • pp.125-135
    • /
    • 1998
  • This study presents a design method for three-span continuous preflex composite girder bridges (3S-PCB) which imposes prestresses in the negative moment region by lifting or lowering interior supports and the design method is automated by a computer program which incorporates optimal design procedure. The objective function for the design of 3S-PCB minimizes the cost of construction materials and the constraint functions represent the limited dimensions of the design section and the allowable stress for each structural member as given in the specifications. Optimal design procedure used in this study is a modification of existing sequential unconstrained minimization technique (SUMT), a numerical analyses procedure for two-span continuous preflex composite bridges. The optimized design sections determined for each span length are compared with those of simple preflex composite beams (SPCB) and the optimal girder depth is determined by defining the relationship between girder depth and construction material costs.

  • PDF

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.24 no.1
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.

Energy Performance and Cost Assessment for Implementing GroundSource Heat Pump System in Military Building (군사시설 내 지열 히트펌프 시스템 적용에 따른 에너지 성능과 비용 절감 효과 평가)

  • Byonghu Sohn;Kyung Joo Cho;Dong Woo Cho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.18 no.4
    • /
    • pp.45-57
    • /
    • 2022
  • The Ministry of National Defense of the Republic of Korea is showing a lot of interest in net zero-energy buildings (NZEBs) to reduce energy consumption of military facilities and to promote green growth policy in military sector. The application of building passive technologies and renewable energies is essential to achieving NZEBs. This paper analyzed energy performance and energy cost on the conventional heating and cooling system (baseline scenario) and three different alternative scenarios (ALT 1, ALT 2 and ALT 3) applied in a hypothetical military building. A building modeling and simulation software (DesignBuilder V6.1) with EnergyPlus calculation engine was used to calculate the energy consumption for each scenario. Overall, when the GSHPs are applied to both space airconditioning and domestic hot water (DHW) production, Alt-2 and Alt-3, the amount of energy consumption for target building can be greatly reduced. In addition, when the building envelope performance is increased like Alt-3, the energy consumption can be further reduced. The annual energy cost analysis showed that the baseline was approximately 161 million KRW, while Alt-3 was approximately 33 million KRW. Therefore, it was analyzed that the initial construction cost increase could be recovered within about 6.7 years for ALT 3. The results of this study can help decision-makers to determine the optimal strategy for implementing GSHP systems in military buildings through energy performance and initial construction cost assessment.

Construction Ergonomic Intervention to Reduce Musculoskeletal Disorders in Aluminum Formworkers

  • Kim, Dae Young;Yi, Hak;Lee, Sang Ryong;Kim, Bubryur;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.465-472
    • /
    • 2022
  • Manual material handling is the one of the leading causes for musculoskeletal disorders (MSDs) and lower back discomfort. According to a study, construction formworkers suffer greater rates of muscular injuries and related illness due to manual activities. However, there is still a paucity of information on MSD, preventive posture issues, and corresponding solutions for construction aluminum formworkers. As a result, MSD and disregard of worker health and safety continue to exist at construction sites. Although preventive measures and strategies have been studied in previous research, we believe it is imperative to shed light on this problem through this study. This study aims to 1) implement a simple and cost-effective elevated bench to reduce MSDs, and 2) determine the rapid upper limbs assessment (RULA) and Ovako working posture analyzing system (OWAS) action catagory of workers in different postures to assess their MSD conditions and obtain an optimal position and posture using the Jack human modeling software and simulation tool. The study findings reveal a considerable reduction in MSD discomfort and which posture is acceptable in post-intervention instances.Thus results provide inexpensive and simple ergonomic interventions with favorable RULA and OWAS ratings that can be applied at construction sites. This study demonstrates workstation ergonomic intervention cases that can aid in understanding the urgency of applying existing research strategies into practice.

  • PDF

Optimum Structural Design of Tankers Using Multi-objective Optimization Technique (다목적함수 최적화기법을 이용한 유조선의 최적구조설계)

  • 신상훈;장창두;송하철
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.15 no.4
    • /
    • pp.591-598
    • /
    • 2002
  • In the ship structural design, the material cost of hull weight and the overall cost of construction processes should be minimized considering safety and reliability. In the past, minimum weight design has been mainly focused on reducing material cost and increasing dead weight reflect the interests of a ship's owner. But, in the past experience, the minimum weight design has been inevitably lead to increasing the construction cost. Therefore, it is necessary that the designer of ship structure should consider both structural weight and construction cost. In this point of view, multi-objective optimization technique is proposed to design the ship structure in this study. According to the proposed algorithm, the results of optimization were compared to the structural design of actual VLCC(Very Large Crude Oil Carrier). Objective functions were weight cost and construction cost of VLCC, and ES(Evolution Strategies), one of the stochastic search methods, was used as an optimization solver. For the scantlings of members and the estimations of objectives, classification rule was adopted for the longitudinal members, and the direct calculation method, GSDM(Generalized Slope Deflection Method), lot the transverse members. To choose the most economical design point among the results of Pareto optimal set, RFR(Required Freight Rate) was evaluated for each Pareto point, and compared to actual ship.

Optimal Repair Method Selection through Neutralization Prediction and LCC Evaluation of a Concrete Structure (콘크리트 구조물의 중성화 및 LCC예측을 통한 최적보수공법 선정)

  • Kang In Seok;Lee Han Seung;Jeong Hae Moon;An Tae Song
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.511-514
    • /
    • 2005
  • In this study, LCC(Life Cycle Cost) evaluation technique is used for the purpose of accumulation of basic data required for such integrative system construction. We predicted the degradation time of concrete and repair material by neutralization through FEM analysis, and utilized the result for LCC evaluation It turned out that the repair method of construction in the most economical initial measure against degradation and a durable period can be chosen through the LCC evaluation in consideration of the degradation prediction using FEM analysis and the initial construction expense in a durable period and repair expense, and the number of repair times.

  • PDF