Acknowledgement
이 연구는 국토교통부/국토교통과학기술진흥원이 시행하고 한국도로공사가 총괄하는 "스마트건설기술개발 국가R&D사업(과제번호: 23SMIP-A156227-04)"의 지원으로 수행하였습니다.
References
- Cha, Y.C., Lee, G.S., Lee, J.H., and Wie, D.Y. (2014). "Optimization of the Distribution Plan and Multi-production Capacity using Genetic Algorithm." Journal of Digital Convergence, 12(6), pp. 125-134. https://doi.org/10.14400/JDC.2014.12.6.125
- Hussein, M., Eltoukhy, A.E.-E., Darko, A., and Eltawil, A. (2021). "Simulation Optimization for the Planning of Off Site Construction Projects: A Comparative Study of Recent Swarm Intelligence Metaheuristics." Sustainability, MDPI, 13(24), p. 13551.
- Roh, S., Lee, H.S., Park, M.S., and Ryu, H.G. (2006). "Scheduling Method by Using Genetic Algorithms to Solve Time-Cost Trade-Off Problems." Journal of the Architectural Institute of Korea Structure & Construction, JAIK, 22(6), pp. 157-164.
- Shin, Y.S., Kim, J.Y., Seo, D.S., and Kang, K.I. (2004). "A Study on the Model for Time-Cost Trade-off by Using Genetic Algorithms." Architectural Institute Of Korea, 20(8), pp. 91-98.
- So, W.S., and Jung, J.H. (2006). "Development of Production Scheduling Management Program using Genetic Algorithm for Polymer Production." Korean Chemical Engineering Research, 44(2), pp. 149-159.
- Kim, M.J., Park, M.S., Lee, H.S., Lee, J.H., and Lee, K.P. (2015). "Development of manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm." Korean Journal of Construction Engineering and Management, KICEM, 16(5), pp. 54-64. https://doi.org/10.6106/KJCEM.2015.16.5.054
- Kwon, O.B., Lee, S.H., and Son, J.H. (2015). "Advanced Time-Cost Trade-Off Model Using Mixed Integer Programming." Korean Journal of Construction Engineering and Management, KICEM, 16(6), pp. 53-62. https://doi.org/10.6106/KJCEM.2015.16.6.053
- Kwon, H.J., Jeon, S.W., Lee, J.I., and Jeong, K.C. (2021). "Development of a Simulation Model for Supply Chain Management of Precast Concrete." Korean Journal of Construction Engineering and Management, KICEM, 22(5), pp. 86-98.
- Liu, D.H., Li, X., Chen, J., and Jin, R. (2020). "Real-Time Optimization of Precast Concrete Component Transportation and Storage." Advances in civil engineering, Hindawi, 2020, pp. 1-18.
- Oh, S.H., Kim, S.K., Kim, Y.H., and Choi, H.S. (2016). "PSC Trapezoidal Girder with Precast Prestressed Concrete Web Joined by Socket Joints (Nodular Girder)." Magazine of the Korea Concrete Institute, 28(3), pp. 40-45.
- Shi, N.R., Kim, Y.S., Han, S.W., and Yeom, D.J. (2016). "Development of a Decision Support System for Production Scheduling of Precast Concrete Members." Journal of the Architectural Institute of Korea, 32(2), pp. 31-40.
- Son, J.U., and Lee, J.S. (2019). "Off-Site Construction: Innovation in the Construction Production System." Korean Journal of Construction Engineering and Management, KICEM, 19(1), pp. 43-53.
- Stastny, J., Skorpil, V., Balogh, Z., and Klein, R. (2021). "Job Shop Scheduling Problem Optimization by Means of Graph-Based Algorithm." Applied sciences , MDPI, 11(4), doi.org/10.3390/ app11041921.
- Xie L., Chen, Y., and Chang, R. (2021). "Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm." Applied Sciences , MDPI, 11(12), 5531; doi.org/ 10.3390/app11125531.
- Yu, I.H. (2019). "[Discussion] Construction automation using modular and the future of specialized construction industry." Korea Research Institute for Construction Policy, RICON, 34, pp. 9-16.