• Title/Summary/Keyword: Operational plan

Search Result 475, Processing Time 0.028 seconds

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

A Study on the Optimum Disaster Mitigation Activity to Establish the Early Counter System on the Industrial Accidents (산업체재난 조기 대응체계 구축을 위한 최적 재해경감활동 방안 연구)

  • Lee, Keun-Jae;Yoon, Myong-O;Lee, Won-Ho
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.9-20
    • /
    • 2010
  • This study indicates direction on establishment of the operational plan for disaster mitigation and its implementation for maintaining business continuity of the local company of the first step, and seeks plans for maintaining their continuity through the establishment of early counter system constructed for achieving lasting safe at the any disaster. For achieving it, we investigated the standard of disaster management selected by the government called "Incident Preparedness and Operational Continuity Plan" Guideline, and investigated a guideline to be easily applied to domestic companies. And, we also studied on how to build the operational plan of disaster mitigation and apply IT techniques to A corporation. Especially, this study indicates the models of establishment of risk assessment, impact analysis, prevention and mitigation plan, response management plan for the establishment of plan among 5 main steps on "Incident Preparedness and Operational Continuity Management" Guideline. We devised the plan to activate the disaster mitigation activity throughout the country. It shows the skills to be prepared to upgrade the level of disaster response in this study.

Evaluation of Train Capacity Pattern Considering Customer Demands (고객수요를 고려한 열차용량패턴에 관한 연구)

  • Kim Dong-Hee;Kim Seong-Ho;Hong Sun-Heum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.507-513
    • /
    • 2004
  • In the railway system, transportation plan corresponds to a m aster plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the railway operation company, and it includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In these sub- planning processes, train can be con side red as a product for providing customer services, and customer demands and operational advantages must be considered. In this paper, we present an effect estimation system for the train capacity pattern in a train schedule, and the effect of capacity pattern can be expressed as minimum spilled demand, minimum train service cost, and maximum train revenue or profit.

  • PDF

Competing for the Responsibility of the Operational Meteorological Satellite Program: After the Launch of TIROS in 1960 (현업용 기상위성에 대한 주도권 다툼: 1960년 TIROS 발사 이후)

  • Ahn, Myoung-Hwan
    • Atmosphere
    • /
    • v.24 no.2
    • /
    • pp.265-281
    • /
    • 2014
  • Currently, Korea is developing a Cheollian follow-on satellite program, named as Geostationary Korea Multipurpose Satellite 2 (GK-2), which consists of two satellites. One satellite (GK-2A) is dedicated to the meterological mission, while the second one (GK-2B) hosts two main payloads for the ocean and environmental application. As GK-2A is dedicated to the meteorological mission unlike Cheollian, there have been discussions on the possibility of transferring the responsibilities of the GK-2A program to the Korea Meteorological Administration. To help resolve any consumptive disputes or to find an efficient way for the GK-2A program, the events happened after the successful launch of the first meteorological satellite TIROS-1 in the U.S. in April 1960 are investigated. With the successful demonstration of usefulness of TIROS-1 for the meteorological applications, organizations such as the Weather Bureau and the Department of Defense, responsible for the real time application of the TIROS 1 data, strongly requested for an operational meteorological satellite program which resulted in the plan for the National Operational Meteorological Satellite System (NOMSS). The plan was strongly supported by Kennedy Adminstration and was put forwarded for the new program under the responsibility of Weather Bureau to the Congress. However, the responsible Committee on Science and Aeronautics sided with NASA and requested major revision of the responsibility. Due to many unfavorable conditions, Weather Bureau accepted the requests and signed with NASA on the agreement for the operational meteorological satellite. However, with the delay of Nimbus satellite which is planned to be used for the prototype of the operational satellite and changes of the unfavorable situations, the Weather Bureau could draw a second agreement with NASA. The new agreement reflected most propositions requested by the Weather Bureau for the NOMSS plan. Until now the second agreement is regarded as the basic principles for the operational meteorological satellite program in the U.S. This study investigates the backgrounds and processes of the second agreement and its implications for the GK-2 program.

Comprehensive Crisis Management System of Operational Continuity Management (운영연속성관리(OCM)관점에서 위기관리통합시스템 구축)

  • Kang, Heau-Jo
    • Journal of Advanced Navigation Technology
    • /
    • v.14 no.1
    • /
    • pp.127-133
    • /
    • 2010
  • The process for establishment of Operational Continuity Management Plan is organized repeatedly of Business Risk Assessment, Crisis Analysis, Business Impact Analysis, Establishing Business Recovery Strategies, Detailed Planning, Plan Execution, Test and Maintenance(Including Monitoring). Therefore, in this paper in response to global environmental change and the construction and operation of social security systems to maximize operational continuity management, crisis management and crisis management systems, building integrated systems for building technology in general and operational continuity management within an organization to understand developed to provide a framework for implementing operational continuity management in terms of crisis management has proposed to build an integrated system.

Profitability Evaluation System for Railway Transportation Plan (철도수송계획의 수익성 평가체계)

  • Kim, Dong-Hui;Hong, Sun-Heum
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.211-214
    • /
    • 2004
  • In railway system, the transportation plan corresponds to master plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the operation company, and includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In this paper, we present profitability evaluation system for current transportation plan. The proposed system can be used for evaluating profitability by estimating train service revenue considering customer demands.

  • PDF

A study on profitability of train schedule planning (열차공급계획의 수익성 분석에 관한 연구)

  • Woo Hee-Moon;Jang Seong-Yong;Kim Dong-hee
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1538-1545
    • /
    • 2004
  • In the train schedule plan corresponds to a master plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the operation company, and it includes several sub-planning activities such as train operation frequency plan, train schedule plan, train capacity assignment plan, and rolling stock requirement plan. In this paper, we present profitability evaluation system for the current train schedule plan. The proposed system can be used for evaluating profitability by estimating train service revenue considering customer demands.

  • PDF

Optimum multi-objective modified step-stress accelerated life test plan for the Burr type-XII distribution

  • Srivastava, P.W.;Mittal, N.
    • International Journal of Reliability and Applications
    • /
    • v.15 no.1
    • /
    • pp.23-50
    • /
    • 2014
  • This paper deals with formulation of optimum multi-objective modified step-stress accelerated life test (ALT) plan for Burr type-XII distribution under type-I censoring. Since it is impractical to estimate only one objective parameter after conducting costly ALT tests; also, it is not desirable to assume instantaneous changes in stress levels because of limited capacity of test equipments and the presence of undesirable failure modes, therefore, an optimum multi-objective modified step-stress ALT plan has been designed. The optimal test plan consists in determining the optimum low stress level and optimal time at which stress starts linearly increasing from low stress by minimizing the weighted sum of the asymptotic variances of the maximum likelihood estimator of quantile lifetimes at design constant stress. The method developed has been illustrated using an example. Sensitivity analysis has been carried out. Comparative study has also been done to highlight the merits of the proposed model.

  • PDF

A Study on The Operational Activation of the Facilities in the Rural Development Project - A Focus on the IPA on The Project Selection Factor and The Operation of a Business - (농촌지역개발사업 조성 시설물의 운영 활성화 방안 연구 - 사업선정요소에 대한 IPA분석 및 사업운영을 중심으로 -)

  • Kim, Hae-Young;Na, seung-hwa;Shin, Yong-Gyu;Cho, Joong-Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.1
    • /
    • pp.89-97
    • /
    • 2019
  • This study aims to make a revitalizing plan for managing and maintaining of facilities which were installed after the rural development projects. The survey was conducted to examine some issues of operating facilities from the developing plan. There were some factors that should be considered in the establishment stage of the project plan when promoting rural development projects. Among them, the preservation and maintenance of rurality, consistency with business plans, connectivity with local resources, and ease of maintenance were less reflective than its importance. And for each facility, systematic consulting on appropriate scale and operational management plans and detailed planning is needed.. It's also necessary to plan action so that the local community can lead. The current or future rural development project will be succeeded when local governments support to strengthening their local groups or people's abilities.

A Study on a To-Be System Design for the Operational Information System of Postal Service (우편 물류 정보화 목표 시스템 설계에 관한 연구)

  • Yee, Soung Ryong;Sun, Ji Ung;Lee, Kyungsik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.3
    • /
    • pp.302-318
    • /
    • 2002
  • As facing the challenges from many competitors, the Office of Korea Postal Service has issued the fundamental plan of business renovation which includes the master plan of the information systems. In this paper we discuss the design of a to-be information system for postal service, which will be provided for the completion of the master plan. After briefly discussing the issues on developing information system and the current situation, we provide the design concept and the framework of the to-be system based on the bench marking and gap analysis with advanced systems. The to-be system consists of eight subsystems which can be grouped into three categories; intelligent systems, operational systems, and platforms. We develop detailed specification of each subsystem and provide an operational scenario. We also explain how the to-be system compatibly fits into an integrated information system, which will include the postal, banking, and management functions, to perform its ultimate role for the efficient postal service.