• Title/Summary/Keyword: Operation Set Time

Search Result 536, Processing Time 0.031 seconds

Loss of Coolant Accident Analysis During Shutdown Operation of YGN Units 3/4

  • Bang, Young-Seok;Kim, Kap;Seul, Kwang-Won;Kim, Hho-Jung
    • Nuclear Engineering and Technology
    • /
    • v.31 no.1
    • /
    • pp.17-28
    • /
    • 1999
  • A thermal-hydraulic analysis is conducted on the loss-of-coolant-accident (LOCA) during shutdown operation of YGN Units 3/4. Based on the review of plant-specific characteristics of YGN Units 3/4 in design and operation, a set of analysis cases is determined, and predicted by the RELAP5/MOD3.2 code during LOCA in the hot-standby mode. The evaluated thermal-hydraulic phenomena are blowdown, break flow, inventory distribution, natural circulation, and core thermal response. The difference in thermal-hydraulic behavior of LOCA at shutolown condition from that of LOCA at full power is identified as depressurization rate, the delay in peak natural circulation timing and the loop seal clearing (LSC) timing. In addition, the effect of high pressure safety injection (HPSI) on plant response is also evaluated. The break spectrum analysis shows that the critical break size can be between 1% to 2% of cold leg area, and that the available operator action time for the Sl actuation and the margin in the peak clad temperature (PCT) could be reduced when considering uncertainties of the present RELAP5 calculation.

  • PDF

Data Processing Method of Radar Processor Unit Test Equipment (레이다처리장치 시험장비의 데이터 처리방안)

  • Lee, Mincheol;Kim, Yong-min
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.6
    • /
    • pp.767-775
    • /
    • 2018
  • To develop and check a Radar Processor Unit, checking the function and performance of the requirement is very important factor in developing Radar. General methods for verifying the Radar is simulation test, environment linkage test and field operation test, firstly, in case of requirement analysis phase, verify Radar algorithm and design by using mathematical method based simulation test method, and secondly, in case of unit test and integrated test phase, Test Equipment is set to simulate radar environment in the lab to verify radar function and performance. Lastly, field operation test phase is carried out to confirm the function and performance after it is mounted on the actual equipment. To successfully develop Radar Processor Unit, using the method of field operation test method after sufficient test cases are tested in radar environmental interlocking method in order to save cost and testing period and because of this reason, development of the Radar Processor Unit Test Equipment is becoming very important factor. In this paper, we introduce the concept of test equipment development and important factors in test equipment, which are target simulation, data processing and device interlocking.

Hot Data Verification Method Considering Continuity and Frequency of Write Requests Using Counting Filter

  • Lee, Seung-Woo;Ryu, Kwan-Woo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.6
    • /
    • pp.1-9
    • /
    • 2019
  • Hard disks, which have long been used as secondary storage in computing systems, are increasingly being replaced by solid state drives (SSDs), due to their relatively fast data input / output speeds and small, light weight. SSDs that use NAND flash memory as a storage medium are significantly different from hard disks in terms of physical operation and internal operation. In particular, there is a feature that data overwrite can not be performed, which causes erase operation before writing. In order to solve this problem, a hot data for frequently updating a data for a specific page is distinguished from a cold data for a relatively non-hot data. Hot data identification helps to improve overall performance by identifying and managing hot data separately. Among the various hot data identification methods known so far, there is a technique of recording consecutive write requests by using a Bloom filter and judging the values by hot data. However, the Bloom filter technique has a problem that a new bit array must be generated every time a set of items is changed. In addition, since it is judged based on a continuous write request, it is possible to make a wrong judgment. In this paper, we propose a method using a counting filter for accurate hot data verification. The proposed method examines consecutive write requests. It also records the number of times consecutive write requests occur. The proposed method enables more accurate hot data verification.

A Study on Message Set of VMS on Express way and Evaluation of Driver's Preference (고속도로 VMS Message Set 연구 및 이용자 선호도 평가)

  • Kim, Nam-Sun;Jee, Dong-Mok;Oh, Young-Tae;Lee, Hwan-Pil;Kim, Sang-Bok
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.8 no.4
    • /
    • pp.1-13
    • /
    • 2009
  • VMS(Variable Message Sign) which makes the traffic flow smooth by providing traffic information to road users in real-time has been being installed or operated on the road as part of the detailed ITS system. However, some problems were found as a result of survey on express way currently. In the part of the phase operation, the message interpretation time wasn't defined so that the phase operation was difficult. In the part of the information service, not considering characteristic of the VMS section caused the confusion to drivers. In the part of the message exposure, font, alignment, conversion and composition of the information were not consistent and use of superfluous words and inconsistent use of word having the same meaning brought about the problem on information communication This study established the detailed exposure method based on instructions relative to VMS operation. The method established by defining the number of appropriate phase and setting required function of each individual VMS installation location. The method is as follow. the font type is the GULIM, the message conversion method is simple conversion method, the alignment method is centering alignment method and the color is defined according to each situation. In this study, the preference survey was performed to review the validity of the proposed improvement through the common driver. The results were similar with the pre-study except for the font type. This study established the detailed exposure method based on instructions relative to VMS operation. The method established by defining the number of appropriate phase and setting required function of individual VMS installation location. For the evaluation of status and improvement, preference survey of ordinary drivers and statistics analysis was carried.

  • PDF

Determination of Resetting Time to the Process Mean Shift with Failure (고장을 고려한 공정평균 이동에 대한 조정시기 결정)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.145-152
    • /
    • 2019
  • All machines deteriorate in performance over time. The phenomenon that causes such performance degradation is called deterioration. Due to the deterioration, the process mean of the machine shifts, process variance increases due to the expansion of separate interval, and the failure rate of the machine increases. The maintenance model is a matter of determining the timing of preventive maintenance that minimizes the total cost per wear between the relation to the increasing production cost and the decreasing maintenance cost. The essential requirement of this model is that the preventive maintenance cost is less than the failure maintenance cost. In the process mean shift model, determining the resetting timing due to increasing production costs is the same as the maintenance model. In determining the timing of machine adjustments, there are two differences between the models. First, the process mean shift model excludes failure from the model. This model is limited to the period during the operation of the machine. Second, in the maintenance model, the production cost is set as a general function of the operating time. But in the process mean shift model, the production cost is set as a probability functions associated with the product. In the production system, the maintenance cost of the equipment and the production cost due to the non-confirming items and the quality loss cost are always occurring simultaneously. So it is reasonable that the failure and process mean shift should be dealt with at the same time in determining the maintenance time. This study proposes a model that integrates both of them. In order to reflect the actual production system more accurately, this integrated model includes the items of process variance function and the loss function according to wear level.

A Study on the High-Speed Multiplier Architecture Using RNS (RNS에 의한 고속 곱셈기 구성에 관한 연구)

  • 김선영;김재공
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.20 no.5
    • /
    • pp.43-49
    • /
    • 1983
  • In this paper, an architecture for high-speed RNS multiplier were proposed by using com-binational logic circuit. The optimum conditions of moduli set which could be saved hardware and operation time were also considered. In the case of RRNS multiplier, output translation could be achieved effectively by means of the modified CRT with magnitude index. It is shown that the estimated multiplication time is about 31.7 ns in NRNS, whereas 47.95 ns in RRNS, respectively.

  • PDF

Vector Control System for Induction Motor using ANFIS Controller (ANFIS Controller틀 이용한 유도전동기 벡터제어 시스템)

  • Lee, Hak-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1051-1052
    • /
    • 2006
  • This paper deals with mathmatical of an induction motor, considering non-linearity in the torque balance equation under closed loop operation with a reference speed. A controller based on Adaptive Nuro-Fuzzy Inference System (ANFIS) is developed to minimize overshoot and settling time following sudden changes in load torque. The overall system is modeled and simulated using the Matlab/simulink and Fuzzy Logic Toolbox. The advantages of fuzzy logic and neural network based fuzzy logic controller. Required training data the ANFIS controller is generated by simulation of the anti-windup PI controller is eliminated using the ANFIS controller. The transient deviation of the response from the set reference following variation in load torque is found to be negligibly samll along with a desirable reduction in settling time for the ANFIS controller.

  • PDF

A Load Balancing Problem in a Parallel Machine Shop Considering Operator Sharing (작업자 공유가 가능한 병렬기계작업장에서 작업자 부하 균형을 고려한 작업할당문제)

  • Moon, Dug-Hee;Kim, Dae-Kyoung
    • IE interfaces
    • /
    • v.12 no.2
    • /
    • pp.166-173
    • /
    • 1999
  • In this paper, a load balancing problem among operators is considered, when one or more identical machines can be assigned to an operator. The operations of a job are separated into three categories : machine-controlled elements, operator-controlled elements and machine/operator-controlled elements. Machining or forming operations are included into the first category. The second category includes inspection and moving to another machine, and the last category includes setup and loading/unloading operation. The objective is to balance the workloads among operators under the constraints of available machine-time and operator-time. A hierarchical heuristic solution procedure is suggested for allocating jobs to each machine and allocating machines to each operator. The performance of the algorithm is evaluated with various data set.

  • PDF

Design Using Finite Element Analysis of a Switched Reluctance Motor for Electric Vehicle

  • Ohyama Kazuhiro;Nashed Maged Naguib F.;Aso Kenichi;Fujii Hiroaki;Uehara Hitoshi
    • Journal of Power Electronics
    • /
    • v.6 no.2
    • /
    • pp.163-171
    • /
    • 2006
  • In this paper, a Switched Reluctance Motor (SRM) employed in an electric vehicle (EV) is designed using the finite element method (FEM). The static torque of the SRM is estimated through magnetic field analysis. The SRM temperature rise over operation time is estimated through heat transfer analysis. First, static torque and temperature rise over the time of 600W SRM is included in the experiment set, and are compared with the calculated results using the FEM under the same conditions. The validity of the magnetic field analysis and heat transfer analysis is verified by the comparisons. In addition, a 60 [kW] SRM employed in an EV, whose output characteristics are equal to a 1500 [cc] gasoline engine, is designed under magnetic field analysis and heat transfer analysis.

A JIT Production Scheduling in Multi-Level Parallel Machine Flow Shops (다단계 병렬기계(多段階 竝列機械) 흐름생산에서 JIT 일정계획)

  • Yoo, Chul-Soo;Lee, Young-Woo;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.171-180
    • /
    • 1994
  • Defined is a Multi-level Parallel Machine Flow-Shop (MPMFS) which reflects some real world manufacturing situations. Just-In-Time (JIT) philosophy is applied to the MPMFS scheduling in order to achieve lowering work-in-process inventory level as well as meeting due dates. A schedule generating simulator is developed. The latest start time of each operation is determined by a backward simulation followed by another forward simulation to analyze the schedule feasibility and actual inventory level. Reasonable schedules are available through adjusting some parameters for allowance factors such as set-up times of machines and other environmental changes. The SLAMSYSTEM under Window is employed for this processing with some input/output data handling processes devised under DOS.

  • PDF