• 제목/요약/키워드: Off-Site-Construction

검색결과 124건 처리시간 0.057초

방수시트의 평행접합방법에 따른 인장성능 평가연구 (A Study on the Evaluation of Tensile Performance According to Pareral Jointing Methods of the Sheet Membrane Waterproofing System)

  • 이정윤;오미현;곽규성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술대회지
    • /
    • pp.39-44
    • /
    • 2004
  • A heat and room temperature construction method of asphalt have been mainly applying to rooftop waterproofing in concrete structure, and the rest construction method are sheet, membrane and mortar waterproofing construction method. In particular, joint method in sheet waterproof method is as overlap joint which on being reinforced with fiber and tape, have been applying for job site to mechanical fix using protection disk and anchorage and metal ironwork on the end of sheet. These construction method cause cutting off joint of sheet as behavior of structure according to repairs of sheet itself and thermal conduct, outdoor air environment. In conclusion, we analyzed and examined the application of various sheets and piece ashes about superior 'I' joint which divide from one and the other sheet and progressed about joint construction method of fixing method for overlap.

  • PDF

개방형 슬래브의 압축 성능 실험 (Compression Tests on Opened Slab)

  • 최린;고수진;염경수;전금석;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.29-31
    • /
    • 2007
  • Building construction in downtown is ever increasing with a strong demand. Top-Down Method is one of suitable construction method for its advantage in minimizing disturbance to neighborhood. Along with these reasons construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. Opened Slab is one of these method which resist the horizontal force by slab and it has many merit about construction time and unity. We analyze the compression tests on opened slab for the application.

  • PDF

개방형 슬래브를 이용한 지하 역타공법 (Opened Slab Based on Top-Down Method)

  • 전금석;고수진;염경수;임홍철;최린
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.9-12
    • /
    • 2006
  • In recent years, construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. In the case of underground construction, especially, there are many restrictions and difficulties. Shortening of the construction time in construction of underground, we use top-down method in undergroud wall. A open slab has been designed for the purpose of overcoming a weak point of former top-down method. This study based on open slab on the under ground top-down method, to more improve constructability, to introduce the effect and the performance of top-down method.

  • PDF

폐도로 생태복원을 위한 시험시공지 평가 연구 - 경부선 영동군 황간지역 시험시공지에 대한 시공 후 7년 시점의 추적조사 - (A Study on the Test Bed Evaluation for the Ecological Restoration of Unused Road - Focused on the Experimental Construction Site in Young Dong Province of GyungBu Expressway(Seven years after construction.) -)

  • 전기성
    • 한국환경복원기술학회지
    • /
    • 제19권5호
    • /
    • pp.47-57
    • /
    • 2016
  • In the recent years, the incidence of abandoned concrete roads have been increasing rapidly due to road improvements and facilities route construction, these abandoned expressway and unused roads are scattered throughout the country but the management system is not clear, they does not be an effectively managed because there is no maintenance cost. In response to these social concern and expectation, the Korea Expressway Corporation that is management authority of the expressway is developing policy initiatives and various projects to restore the closed road to ecological for eco-friendly projects of the existing expressway. And as part of these projects, Hwanggan IC unmanaged abandoned concrete roads restoration project was done and it was conducting monitoring for ecological restoration that is not one-off but sustainable. After test construction over seven years at the time, test construction of four ways enforced but the boundaries have become blurred over time. And Pinus koraiensis, Callicarpa dichotoma and Sorbaria stellipilla var. typica planted in the site are dominating, else Amorpha fruticosa and Indigofera pseudotinctoria sowed are dominating. Invasive species is that Robinia pseudoacacia was growing in the colony. Over monitoring result time, the vegetation was taking root and the ecosystem was being restore. But the disturbance of vegetation happens due to planting of tree species that doesn't fit in the restoration area and advent of ecosystem Disturbing Species. The study will be providing a basic data that identify change of plant environment by monitoring of the site and soil environment during June to November 2016 and secure an objective evaluation data by analyzing the effects of ecological restoration for revegetation test bed evaluation for ecological restoration of expressway in ecological restoration construction in later.

파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링 (3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique)

  • 와카스 아샤드 타놀리;하스나인 라자;이승수;박상일;서종원
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

풍화토 및 충적토 지반에 적용된 M.S.G공법의 차수효과 (Effect of water cut-off by M.S.G. method for weathered soil and alluvial soil)

  • 지덕진;우상백;강진기;김태한;박종호
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.85-92
    • /
    • 2003
  • Generally, ordinary portland cement(OPC) is widely used for grouting to reduce permeability of ground under the foundations of structures. But, it is hard to be injected into the microscopic voids, fissures and crevices in soil or rock formation for the OPC material. Therefore new method what is called MSG(Micro Silica Grouting) has been developed recently to improve the weak point of the OPC material. In this case study, in order to verify performance of the MSG's water cut-off, trial injections were performed in rear of CIP(Cast in Place Pile) on the site A(weathered soil) and B(alluvial soil) that are constructed for the subway No. 9 nowadays. To take the proper grouting method of the MSG in the trial injecting, the injections are carried out for grouting types(constant pressure or fixed Quantity) and grouting methods(1.5shot or 2.0shot) and to confirm the effects of water cut-off and the injection range of the MSG, the tests of permeability and indicator(phenolphthalein) response were performed before and after the injection. Through the tests results, we could affirm the effects of water cut-off of the MSG and the injection range for the weathered and alluvial soil layers near the Han River. Finally we could make sure the application of the MSG method in actual construction under the layers.

  • PDF

국내 모듈러 주택의 특성 및 MC 설계를 통한 건축자재 표준화 효과 분석 (An Analysis on Architectural Characteristics of Domestic Modular Housing and Building Material Standardization Effect through MC Design)

  • 이창재;임석호
    • 한국주거학회논문집
    • /
    • 제26권6호
    • /
    • pp.103-113
    • /
    • 2015
  • Modular construction is a process in which a building is produced off-site in module boxes using standard materials. Since the introduction of prefabrication in building construction, Modular Coordination (MC) has become an essential design tool in building design and construction. However, in Korea, the design standardization has not been adequately applied to modular construction. This study intends to analyze the current status of modular construction in Korea and explore the applicability of MC design in the construction industry. The analysis of the current status of MC design within Korean four major modular construction companies indicates that an incremental dimension is not properly used in horizontal planning modules, which results in a problem of increasing construction cost by high material loss rate. But, in vertical planning modules, a incremental dimension of 100 mm (1 M) is found to be used although the structural system varies among manufacturers, which demonstrates the potential for an open system to be well applied in modular construction, despite different structural systems.

모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석 (Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project)

  • 이명도
    • 한국건축시공학회지
    • /
    • 제19권3호
    • /
    • pp.263-272
    • /
    • 2019
  • BIM과 모듈러 공법은 건설 산업의 위기를 극복하는데 도움이 되는 중요한 기술로 인식되고 있다. 그러나 현재 국내 모듈러 건축 프로젝트에서 BIM의 활용은 미미한 수준이며 구체적인 활용지침이 제시되지 못하고 있다. 이에 따라 본 연구에서는 모듈러 건축공사의 현장시공계획단계를 위한 BIM 활용성 분석을 목적으로 하였다. 첫째, 기존문헌 고찰과 전문가 인터뷰를 통해 적용 가능한 BIM 업무를 선정하였으며, 모듈러 건축공사의 시공계획서를 분석하여 BIM 활용 업무를 5가지로 분류하였다. 이후 설문을 통해 각 항목에 대한 BIM 활용성을 필요성과 효율성으로 분석하였으며 이를 BIM utilization Index(BIM UI)를 통해 제시하였다. 설문 결과 모듈간 접합부 시공상세도 구축, 양중계획 검토, 기타공사 주요 시공부위의 상세도 구축, 현장공정 계획 검토, 그리고 현장배치계획 검토가 0.811, 0.787, 0.770, 0.729, 0.699 순으로 분석되었다. 이후 사례연구를 통해 BIM을 적용한 BIM 기반 시공계획서를 도출하여 전문가 자문을 실시하고 논의하였다. 본 연구의 결과는 향후 모듈러 프로젝트에서 BIM의 적정한 활용 방안을 제시하는데 활용될 수 있을 것이다.

동적 이용률을 고려한 수소충전소 사업의 경제성 분석 (An Economic Analysis of the Hydrogen Station Enterprise Considering Dynamic Utilization)

  • 김봉진
    • 한국수소및신에너지학회논문집
    • /
    • 제28권1호
    • /
    • pp.47-55
    • /
    • 2017
  • This paper deals with the after-tax economic feasibility analysis of the hydrogen fueling station considering dynamic utilization. We selected an off-site hydrogen station in which the hydrogen is supplied by a central by-product hydrogen plant as a case study. Also, we made some sensitivity analysis by changing input factors such as the discount rate, the hydrogen station construction cost, the hydrogen demand and the hydrogen sale price. As a result, the hydrogen station will not be economical in 2020 due to the relatively high price of the hydrogen station construction cost and the low price of hydrogen sale price. In order to realize the economic feasibility of the hydrogen station in the early stage of the hydrogen economy, the subsidies on the annual operating cost as well as the construction cost are needed.

수소 충전소의 수소 판매량 데이터 분석 (Analysis of Hydrogen Sales Data at Hydrogen Charging Stations)

  • 김민수;전성탁;정태영
    • 한국수소및신에너지학회논문집
    • /
    • 제34권3호
    • /
    • pp.246-255
    • /
    • 2023
  • Due to lack of hydrogen charging stations and hydrogen supply compared to the supply of hydrogen vehicles, social phenomena such as 2-hour queues and restrictions on charging capacity are occurring, which negatively affects the spread of hydrogen vehicles. In order to resolve these problems, it is essential to have a strategic operation of the hydrogen charging stations. To establish operational strategies, it is necessary to derive customer demand patterns and characteristics through the analysis of sales data. This study derived the demand patterns and characteristics of customers visiting hydrogen charging stations through data analysis from various perspectives, such as charging volume, charging speed, number of visits, and correlation with external factors, based on the hydrogen sales data of off-site hydrogen charging stations located in domestic residential areas.